Power availability in Chandler: DCPI verdict BUILD, composite score 67.2 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 253 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Chandler data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Chandler market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**67.2/100**

MW, all listings**143**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**BUILD**

## Chandler at a glance

Chandler has 25 MW operational and 50 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are H5 Data Centers (75 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 25 |
| Under construction | 50 |
| Total listed | 75 |

## Developers building or planning in Chandler

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| H5 Data Centers | 50 |  |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Chandler

DC Hub does not hold a lease-rate figure for this market yet.

The market is anchored by a mix of hyperscale and mid-market operators, though recent deal activity remains absent from tracking. Recent news coverage indicates the Chandler data center campus is entering a growth phase with large user commitments, signaling sustained demand.

The DCPI verdict of BUILD reflects favorable power conditions for new capacity development.

No recent M&A or capital transactions are tracked in Chandler at present. The operator base remains fragmented, with CyrusOne holding material presence while other carriers maintain single or low-digit facility counts. The absence of deal flow does not reflect power stress or competitive consolidation; rather, it aligns with a market positioned for organic build activity rather than portfolio roll-ups. Nearby Phoenix has seen selective M&A—including RadiusDC's acquisition of PhoenixNAP's operations—but Chandler's own transaction silence suggests operators are focused on development rather than acquisition.

Chandler's power position and growth trajectory position it as an active build market within Arizona's data center corridor for the near term.

## Data centers in Chandler

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [H5 Chandler 2](https://dchub.cloud/facilities/h5-data-centers-h5-chandler-2-b31493b3) | H5 Data Centers | Under Construction | 50 |
| [H5 Chandler 1](https://dchub.cloud/facilities/h5-data-centers-h5-chandler-1-ef355261) | H5 Data Centers | Operational | 25 |
| [Chandler, AZ, PHX1-PHX8](https://dchub.cloud/facilities/cyrusone-chandler-az-phx1-phx8-1110b56a) | CyrusOne | Operational |  |
| [CyrusOne Chandler AZ I](https://dchub.cloud/facilities/cyrusone-cyrusone-chandler-az-i-07e82cb9) | CyrusOne | Operational |  |
| [CyrusOne PHX1](https://dchub.cloud/facilities/cyrusone-cyrusone-phx1-dbd6a8d0) | CyrusOne | Operational |  |
| [CyrusOne PHX5](https://dchub.cloud/facilities/cyrusone-cyrusone-phx5-2f87b6e6) | CyrusOne | Operational |  |
| [Digital Realty PHX15 (2121 S Price Rd)](https://dchub.cloud/facilities/digital-realty-digital-realty-phx15-2121-s-price-rd-20edd683) | Digital Realty | Operational |  |
| [H5 Data Centers Phoenix](https://dchub.cloud/facilities/h5-data-centers-h5-data-centers-phoenix-b97561e4) | H5 Data Centers | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Arizona](https://dchub.cloud/facilities/in/us/arizona).

## More on Chandler

- [Chandler DCPI score](https://dchub.cloud/dcpi/chandler)
- [Chandler market brief](https://dchub.cloud/markets/chandler/brief)
- [Arizona data center market brief](https://dchub.cloud/states/arizona/brief)
- [Arizona data center tax incentives](https://dchub.cloud/states/arizona/data-center-incentives)

### Email me when the Chandler DCPI verdict changes

Email me when Chandler's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Chandler: 143 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=chandler) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=chandler)

JSON: [/api/v1/markets/chandler/deep-dive](https://dchub.cloud/api/v1/markets/chandler/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Chandler","item":"https://dchub.cloud/markets/chandler"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Chandler Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:49:54.446103+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/chandler",
 "wordCount":253,
 "about":{"@type":"Place","name":"Chandler"},
 "description":"Live data-center market analysis. DCPI score 67.2/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "chandler", "name": "Chandler Data Center Market — DC Hub", "description": "Live data-center market measurements for Chandler, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/chandler", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Chandler"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 143.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 67.2, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:45:50."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "BUILD", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:50.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:50."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/chandler#webpage", "url": "https://dchub.cloud/markets/chandler", "name": "Chandler data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Chandler data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Chandler market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Chandler data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Chandler market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```