---
description: Is Centennial a good data center market for power? DCPI verdict CAUTION, score 53.8/100 (WECC), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Centennial data centers: power, grid and capacity | DC Hub"
---

# Centennial data center market

Power availability in Centennial: DCPI verdict CAUTION, composite score 53.8 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 204 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Centennial data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Centennial market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**53.8/100**

MW, all listings**0**any status, unverified listings included

Verdict**CAUTION**

## Colocation lease rates in Centennial

DC Hub does not hold a lease-rate figure for this market yet.

Flexential runs three sites and Equinix operates one facility (DE1).

The DCPI verdict of CAUTION reflects mixed signals on new power procurement. The pairing—adequate supply but tangible procurement friction—defines the cautionary posture.

DataBank's four-site concentration underscores operator consolidation in this market, though without recent deal tracking, current intentions remain opaque. Flexential's three-site presence adds secondary scale.

Power procurement dynamics will determine whether Centennial can support new customer demand without significant delay or cost escalation.

## Data centers in Centennial

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [DataBank Denver (DEN2)](https://dchub.cloud/facilities/databank-databank-denver-den2-37967adf) | DataBank | Operational |  |
| [Databank Denver (DEN5)](https://dchub.cloud/facilities/databank-databank-denver-den5-d857d1f4) | DataBank | Operational |  |
| [Flexential - Denver/Centennial (DEN05)](https://dchub.cloud/facilities/flexential-corp-flexential-denvercentennial-den05-f2256c7d) | Flexential Corp. | Operational |  |
| [Xfinity/Comcast Data Center](https://dchub.cloud/facilities/xfinitycomcast-data-center-7eab27b7) |  | Operational |  |
| [zColo by Zayo](https://dchub.cloud/facilities/zcolo-by-zayo-a07e2b52) |  | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Colorado](https://dchub.cloud/facilities/in/us/colorado).

## More on Centennial

- [Centennial DCPI score](https://dchub.cloud/dcpi/centennial)
- [Centennial market brief](https://dchub.cloud/markets/centennial/brief)
- [Colorado data center market brief](https://dchub.cloud/states/colorado/brief)
- [Colorado data center tax incentives](https://dchub.cloud/states/colorado/data-center-incentives)

### Email me when the Centennial DCPI verdict changes

Email me when Centennial's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Centennial market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=centennial) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=centennial)

JSON: [/api/v1/markets/centennial/deep-dive](https://dchub.cloud/api/v1/markets/centennial/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Centennial","item":"https://dchub.cloud/markets/centennial"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Centennial Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:49:46.978771+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/centennial",
 "wordCount":204,
 "about":{"@type":"Place","name":"Centennial"},
 "description":"Live data-center market analysis. DCPI score 53.8/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "centennial", "name": "Centennial Data Center Market — DC Hub", "description": "Live data-center market measurements for Centennial, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/centennial", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Centennial"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 53.8, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:46:12."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:12.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:12."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/centennial#webpage", "url": "https://dchub.cloud/markets/centennial", "name": "Centennial data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Centennial data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Centennial market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Centennial data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Centennial market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
