# Carrollton data center market

Power availability in Carrollton: DCPI verdict CAUTION, composite score 44.7 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 249 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Carrollton data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Carrollton market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**44.7/100**

MW, all listings**55**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**CAUTION**

## Colocation lease rates in Carrollton

DC Hub does not hold a lease-rate figure for this market yet.

Carrollton's data center market comprises seven tracked facilities operated primarily by CyrusOne (which accounts for five of the tracked sites) and Digital Realty, with no recent deal activity recorded. Only one tracked facility in the market publicly reports megawatt figures, limiting visibility into total operational capacity.

The DCPI verdict of CAUTION reflects the tension between these two dimensions. Grid augmentation timelines, utility interconnection queues, or existing contractual limitations on available supply are likely contributors. For site developers and operators planning greenfield or brownfield expansion in Carrollton, power procurement should be validated early and treated as a critical path item rather than a routine utility logistics task.

Deal flow in Carrollton remains dormant, with no recent transactions tracked. Operator concentration is high: CyrusOne dominates with four facilities in the tracked set, while Digital Realty maintains two. This operational structure suggests a mature, stable market without active M&A or new entrant activity at present.

## Data centers in Carrollton

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Carrollton, TX, DFW1](https://dchub.cloud/facilities/cyrusone-carrollton-tx-dfw1-ac8d7454) | CyrusOne | Operational |  |
| [CyrusOne Carrollton TX](https://dchub.cloud/facilities/cyrusone-cyrusone-carrollton-tx-2e5fcf1f) | CyrusOne | Operational |  |
| [CyrusOne Dallas (Carrollton)](https://dchub.cloud/facilities/cyrusone-inc-cyrusone-dallas-carrollton-dd727c4c) | CyrusOne Inc. | Operational |  |
| [Digital Realty DFW (2440 Marsh Lane)](https://dchub.cloud/facilities/digital-realty-digital-realty-dfw-2440-marsh-lane-7831ab6f) | Digital Realty | Operational |  |
| [Digital Realty DFW (4025 Midway Road)](https://dchub.cloud/facilities/digital-realty-digital-realty-dfw-4025-midway-road-de62ae5f) | Digital Realty | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Texas](https://dchub.cloud/facilities/in/us/texas).

## More on Carrollton

- [Carrollton DCPI score](https://dchub.cloud/dcpi/carrollton)
- [Carrollton market brief](https://dchub.cloud/markets/carrollton/brief)
- [Texas data center market brief](https://dchub.cloud/states/texas/brief)
- [Texas data center tax incentives](https://dchub.cloud/states/texas/data-center-incentives)

### Email me when the Carrollton DCPI verdict changes

Email me when Carrollton's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Carrollton: 55 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=carrollton) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=carrollton)

JSON: [/api/v1/markets/carrollton/deep-dive](https://dchub.cloud/api/v1/markets/carrollton/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Carrollton","item":"https://dchub.cloud/markets/carrollton"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Carrollton Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:49:31.391037+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/carrollton",
 "wordCount":249,
 "about":{"@type":"Place","name":"Carrollton"},
 "description":"Live data-center market analysis. DCPI score 44.7/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "carrollton", "name": "Carrollton Data Center Market — DC Hub", "description": "Live data-center market measurements for Carrollton, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/carrollton", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Carrollton"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 55.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 44.7, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:16."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:16.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:16."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/carrollton#webpage", "url": "https://dchub.cloud/markets/carrollton", "name": "Carrollton data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Carrollton data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Carrollton market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Carrollton data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Carrollton market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```