# Canton data center market

Power availability in Canton: DCPI verdict AVOID, composite score 20.8 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 248 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Canton data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Canton market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**20.8/100**

MW, all listings**1,000**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Canton at a glance

Canton has 1,000 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Amazon Web Services (1,000 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Under construction | 1,000 |
| Total listed | 1,000 |

## Developers building or planning in Canton

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| Amazon Web Services | 1,000 |  |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Canton

DC Hub does not hold a lease-rate figure for this market yet.

Canton's data center footprint consists of five tracked facilities operated by Amazon Web Services (two sites), LightSpeed Technologies, SecureData 365, and ark data centers. One tracked facility reports operational megawattage data; the remaining four do not publicly disclose capacity metrics.

Together, these scores indicate that operators seeking to add load or new entrants planning greenfield development should expect protracted power-supply negotiations and higher per-MW acquisition friction than markets scoring in the 60+ range.

Canton's operator base remains fragmented across five entities with no dominant incumbent. No recent deals have been tracked in this market.

Power scarcity, not demand or real estate, defines the near-term boundary for new supply deployment in Canton.

## Data centers in Canton

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [AWS Mississippi Campus](https://dchub.cloud/facilities/amazon-web-services-aws-mississippi-campus-8daf8397) | Amazon Web Services | Under Construction | 1,000 |
| [Amazon Canton Data Center](https://dchub.cloud/facilities/amazon-web-services-amazon-canton-data-center-c4c82d37) | Amazon Web Services | Operational |  |
| [LSTI 401 Market](https://dchub.cloud/facilities/lightspeed-technologies-llc-lsti-401-market-3af664e3) | LightSpeed Technologies, LLC | Operational |  |
| [ark data centers - Canton,OH](https://dchub.cloud/facilities/ark-data-centers-ark-data-centers-cantonoh-1abb70e0) | ark data centers | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Mississippi](https://dchub.cloud/facilities/in/us/mississippi).

## More on Canton

- [Canton DCPI score](https://dchub.cloud/dcpi/canton)
- [Canton market brief](https://dchub.cloud/markets/canton/brief)
- [Ohio data center market brief](https://dchub.cloud/states/ohio/brief)
- [Ohio data center tax incentives](https://dchub.cloud/states/ohio/data-center-incentives)

### Email me when the Canton DCPI verdict changes

Email me when Canton's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Canton: 1,000 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=canton) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=canton)

JSON: [/api/v1/markets/canton/deep-dive](https://dchub.cloud/api/v1/markets/canton/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Canton","item":"https://dchub.cloud/markets/canton"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Canton Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:49:14.422596+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/canton",
 "wordCount":248,
 "about":{"@type":"Place","name":"Canton"},
 "description":"Live data-center market analysis. DCPI score 20.8/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "canton", "name": "Canton Data Center Market — DC Hub", "description": "Live data-center market measurements for Canton, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/canton", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Canton"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 1000.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 20.8, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:52."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:52.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:52."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/canton#webpage", "url": "https://dchub.cloud/markets/canton", "name": "Canton data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Canton data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Canton market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Canton data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Canton market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```