description: Is Calgary a good data center market for power? DCPI verdict AVOID, score 32.7/100 (AESO), as of 2026-11-12. 180 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Calgary data centers: power, grid and capacity | DC Hub"
---

# Calgary data center market

Power availability in Calgary: DCPI verdict AVOID, composite score 32.7 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 256 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Calgary data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Calgary market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**32.7/100**

MW, all listings**180**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Calgary

DC Hub does not hold a lease-rate figure for this market yet.

Equinix operates the largest presence with five facilities, followed by two Rogers entities and Arrow Group, each with multiple sites. The market shows established operator concentration but no recent deal activity in the tracked dataset.

The DCPI verdict of AVOID reflects specific power supply dynamics. Together, these scores suggest that obtaining new power supply is neither straightforward nor severely restricted—new entrants face real logistical and commercial friction in accessing grid capacity, though supply itself is not the limiting factor.

The absence of recent tracked deals aligns with the power supply picture. No announced transactions have registered in Calgary's data center ecosystem during the current tracking window. Equinix's five-site presence represents the market's largest single operator footprint, while Rogers Data Centres Inc. and Rogers Communications Cal together maintain five operational or planned locations. This operator structure suggests established players have built their positions incrementally rather than through high-volume acquisition activity. Arrow Group's two tracked sites indicate secondary-tier operator participation, but without recent deal flow, the competitive or consolidation dynamics remain opaque.

Power supply friction may shape near-term entry strategies for new capacity development in Calgary.

## Data centers in Calgary

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [AWS CA West 1 (Calgary)](https://dchub.cloud/facilities/amazon-web-services-aws-ca-west-1-calgary-8c73449a) | Amazon Web Services | Operational |  |
| [Equinix CL1 - Calgary](https://dchub.cloud/facilities/equinix-equinix-cl1-calgary-8c83e202) | Equinix | Operational |  |
| [Equinix CL2 - Calgary](https://dchub.cloud/facilities/equinix-equinix-cl2-calgary-5a5627b9) | Equinix | Operational |  |
| [Equinix CL3 - Calgary (formerly Q9 Calgary Three)](https://dchub.cloud/facilities/equinix-equinix-cl3-calgary-formerly-q9-calgary-three-6e7650b0) | Equinix | Operational |  |
| [Rogers Calgary DC1 (Franklin Atrium)](https://dchub.cloud/facilities/rogers-data-centres-inc-rogers-calgary-dc1-franklin-atrium-d1b75e35) | Rogers Data Centres Inc. | Operational |  |
| [Rogers Calgary DC2 (1313 10th Ave SW)](https://dchub.cloud/facilities/rogers-data-centres-inc-rogers-calgary-dc2-1313-10th-ave-sw-b9a9720f) | Rogers Data Centres Inc. | Operational |  |
| [Rogers Calgary DC3 (Airdrie)](https://dchub.cloud/facilities/rogers-data-centres-inc-rogers-calgary-dc3-airdrie-844f534c) | Rogers Data Centres Inc. | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Canada](https://dchub.cloud/facilities/in/ca).

## More on Calgary

- [Calgary DCPI score](https://dchub.cloud/dcpi/calgary)
- [Calgary market brief](https://dchub.cloud/markets/calgary/brief)

### Email me when the Calgary DCPI verdict changes

Email me when Calgary's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Calgary: 180 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=calgary) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=calgary)

JSON: [/api/v1/markets/calgary/deep-dive](https://dchub.cloud/api/v1/markets/calgary/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Calgary","item":"https://dchub.cloud/markets/calgary"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Calgary Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:49:23.018506+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/calgary",
 "wordCount":256,
 "about":{"@type":"Place","name":"Calgary"},
 "description":"Live data-center market analysis. DCPI score 32.7/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "calgary", "name": "Calgary Data Center Market — DC Hub", "description": "Live data-center market measurements for Calgary, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/calgary", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Calgary"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 180.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 32.7, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:48:39."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:39.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:39."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/calgary#webpage", "url": "https://dchub.cloud/markets/calgary", "name": "Calgary data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Calgary data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Calgary market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Calgary data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Calgary market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```