---
description: Is Byron Center a good data center market for power? DCPI verdict CAUTION, score 47.2/100 (MISO), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Byron Center data centers: power, grid and capacity | DC Hub"
---

# Byron Center data center market

Power availability in Byron Center: DCPI verdict CAUTION, composite score 47.2 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 205 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Byron Center data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Byron Center market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**47.2/100**

MW, all listings**0**any status, unverified listings included

Verdict**CAUTION**

This analysis was written on 2026-11-07, when the Data Center Power Index for this market read 47.0. The index is recomputed through the day and reads 47.2 now — the figure above is the live one, and the narrative below describes the market as it stood when it was written.

## Colocation lease rates in Byron Center

DC Hub does not hold a lease-rate figure for this market yet.

Byron Center's data center footprint comprises three tracked facilities operated by 123.Net, ManagedWay Company, and US Signal, with no recent deal activity on record. These conditions yield a CAUTION verdict, meaning new power procurement here carries material headwind.

The DCPI verdict reflects a structural tension: power exists, but reaching it requires navigation of grid access limitations. New capacity additions will face non-trivial lead times and coordination costs to unlock available generation. This is distinct from markets with acute scarcity—Byron Center has supply—but distinct also from markets with open access.

The absence of deal flow in Byron Center does not reflect demand weakness; it reflects the current state of tracked transaction activity in this specific market.

## Data centers in Byron Center

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [123.NET - DC4 - 400 76th St SW](https://dchub.cloud/facilities/123net-llc-123net-dc4-400-76th-st-sw-2804baa8) | 123.Net, LLC. | Operational |  |
| [ManagedWay BYK1](https://dchub.cloud/facilities/managedway-company-managedway-byk1-a4cb1d41) | ManagedWay Company | Operational |  |
| [US Signal - Grand Rapids South](https://dchub.cloud/facilities/us-signal-us-signal-grand-rapids-south-e39565a3) | US Signal | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Michigan](https://dchub.cloud/facilities/in/us/michigan).

## More on Byron Center

- [Byron Center DCPI score](https://dchub.cloud/dcpi/byron-center)
- [Byron Center market brief](https://dchub.cloud/markets/byron-center/brief)
- [Michigan data center market brief](https://dchub.cloud/states/michigan/brief)
- [Michigan data center tax incentives](https://dchub.cloud/states/michigan/data-center-incentives)

### Email me when the Byron Center DCPI verdict changes

Email me when Byron Center's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Byron Center market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=byron-center) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=byron-center)

JSON: [/api/v1/markets/byron-center/deep-dive](https://dchub.cloud/api/v1/markets/byron-center/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Byron Center","item":"https://dchub.cloud/markets/byron-center"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Byron Center Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:49:06.825645+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/byron-center",
 "wordCount":205,
 "about":{"@type":"Place","name":"Byron Center"},
 "description":"Live data-center market analysis. DCPI score 47.2/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "byron-center", "name": "Byron Center Data Center Market — DC Hub", "description": "Live data-center market measurements for Byron Center, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/byron-center", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Byron Center"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 47.2, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:50:06."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:50:06.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:50:06."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/byron-center#webpage", "url": "https://dchub.cloud/markets/byron-center", "name": "Byron Center data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Byron Center data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Byron Center market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Byron Center data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Byron Center market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
