---
description: Is Buffalo a good data center market for power? DCPI verdict CAUTION, score 47.9/100 (NYISO), as of 2026-11-12. 1,008 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Buffalo data centers: power, grid and capacity | DC Hub"
---

# Buffalo data center market

Power availability in Buffalo: DCPI verdict CAUTION, composite score 47.9 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 256 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Buffalo data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Buffalo market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**47.9/100**

MW, all listings**1,008**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**CAUTION**

## Buffalo at a glance

Buffalo has 8 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are 365 Data Centers (8 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 8 |
| Total listed | 8 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Buffalo

DC Hub does not hold a lease-rate figure for this market yet.

The market has seen recent activity in operator consolidation and capacity expansion, with TeraWulf running two facilities and three operators each maintaining single sites.

The DCPI verdict of CAUTION reflects tension between available supply and grid access. This combination means new power procurement is possible but not frictionless—grid interconnection timelines, transmission upgrades, or utility coordination may extend project schedules or increase pre-development costs.

No major announced investment commitments have been disclosed for Buffalo recently, though deal activity in the broader Aligned Data Centers and regional CBRE-Onnec transaction space signals continued M&A interest in the Northeast. A proposed two-year moratorium under review by Buffalo Common Council and an active municipal task force evaluating data center development add regulatory uncertainty independent of power supply fundamentals. These governance processes may affect facility timelines regardless of grid readiness.

## Data centers in Buffalo

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [365 DC Buffalo](https://dchub.cloud/facilities/365-data-centers-365-dc-buffalo-1696d02d) | 365 Data Centers | Operational | 8 |
| [325 Delaware Ave](https://dchub.cloud/facilities/the-benchmark-group-325-delaware-ave-9bb4d623) | The Benchmark Group | Operational |  |
| [ACT Buffalo](https://dchub.cloud/facilities/advanced-communications-technology-act-buffalo-1965ed36) | Advanced Communications Technology | Operational |  |
| [CentriLogic Buffalo (BUF)](https://dchub.cloud/facilities/centrilogic-centrilogic-buffalo-buf-94f8f2bf) | CentriLogic | Operational |  |
| [ColoCrossing BUF1](https://dchub.cloud/facilities/colocrossing-colocrossing-buf1-6bf32306) | ColoCrossing | Operational |  |
| [ixColo](https://dchub.cloud/facilities/ixcolo-llc-ixcolo-fe5b36d1) | ixColo LLC | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [New York](https://dchub.cloud/facilities/in/us/new-york).

## More on Buffalo

- [Buffalo DCPI score](https://dchub.cloud/dcpi/buffalo)
- [Buffalo market brief](https://dchub.cloud/markets/buffalo/brief)
- [New York data center market brief](https://dchub.cloud/states/new-york/brief)
- [New York data center tax incentives](https://dchub.cloud/states/new-york/data-center-incentives)

### Email me when the Buffalo DCPI verdict changes

Email me when Buffalo's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Buffalo: 1,008 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=buffalo) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=buffalo)

JSON: [/api/v1/markets/buffalo/deep-dive](https://dchub.cloud/api/v1/markets/buffalo/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Buffalo","item":"https://dchub.cloud/markets/buffalo"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Buffalo Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:46:37.142644+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/buffalo",
 "wordCount":256,
 "about":{"@type":"Place","name":"Buffalo"},
 "description":"Live data-center market analysis. DCPI score 47.9/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "buffalo", "name": "Buffalo Data Center Market — DC Hub", "description": "Live data-center market measurements for Buffalo, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/buffalo", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Buffalo"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 1008.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 47.9, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:46:49."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:49.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:49."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/buffalo#webpage", "url": "https://dchub.cloud/markets/buffalo", "name": "Buffalo data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Buffalo data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Buffalo market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Buffalo data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Buffalo market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
