Power availability in Brussels: DCPI verdict AVOID, composite score 11.1 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 279 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Brussels data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Brussels market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**11.1/100**

MW, all listings**10**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Brussels at a glance

Brussels has 10 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are VUB;UZ Brussel (5 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 10 |
| Total listed | 10 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Brussels

DC Hub does not hold a lease-rate figure for this market yet.

Brussels operates with acute power scarcity. The operator base remains fragmented: Bics Brussels leads with 3 sites, while Digital Realty, Proximus Netcenter, and three others operate 2 or fewer facilities each. No recent deals have been tracked in this market.

The DCPI verdict of AVOID reflects a structural mismatch between demand for new capacity and the grid's ability to support it. This combination does not reflect demand weakness; it reflects supply-side gridlock that affects cost and delivery certainty for any project requiring incremental power.

Deal flow remains silent. No transactions have been recorded recently in Brussels, and the operator landscape shows no signs of consolidation or capital influx. Bics Brussels' three-site footprint makes it the leading local player, but the wider distribution across smaller operators—many holding single facilities—suggests the market has not attracted the scale-focused capital evident in other European regions.

## Data centers in Brussels

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Nexus Datacenter](https://dchub.cloud/facilities/vubuz-brussel-nexus-datacenter-6e9e9863) | VUB;UZ Brussel | Operational | 5 |
| [Unix-Solutions BV](https://dchub.cloud/facilities/unix-solutions-bv-unix-solutions-bv-9a041a55) |  | Operational | 5 |
| [Azure Belgium Central Brussels](https://dchub.cloud/facilities/microsoft-azure-belgium-central-brussels-7d5bb8e0) | Microsoft | Operational |  |
| [Colt Telecom](https://dchub.cloud/facilities/colt-telecom-74099fdd) |  | Operational |  |
| [Digital Realty Brussels BRU1](https://dchub.cloud/facilities/digital-realty-digital-realty-brussels-bru1-048685c4) | Digital Realty | Operational |  |
| [LCL Brussels (Diegem)](https://dchub.cloud/facilities/lcl-belgium-lcl-brussels-diegem-2730c02c) | LCL Belgium | Operational |  |
| [VERIXI Louise DC](https://dchub.cloud/facilities/verixi-sa-verixi-louise-dc-3a9b76d0) | VERIXI SA | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Belgium](https://dchub.cloud/facilities/in/be).

## More on Brussels

- [Brussels DCPI score](https://dchub.cloud/dcpi/brussels)
- [Brussels market brief](https://dchub.cloud/markets/brussels/brief)

### Email me when the Brussels DCPI verdict changes

Email me when Brussels's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Brussels: 10 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=brussels) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=brussels)

JSON: [/api/v1/markets/brussels/deep-dive](https://dchub.cloud/api/v1/markets/brussels/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Brussels","item":"https://dchub.cloud/markets/brussels"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Brussels Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:46:29.175004+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/brussels",
 "wordCount":279,
 "about":{"@type":"Place","name":"Brussels"},
 "description":"Live data-center market analysis. DCPI score 11.1/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "brussels", "name": "Brussels Data Center Market — DC Hub", "description": "Live data-center market measurements for Brussels, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/brussels", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Brussels"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 10.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 11.1, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:48:52."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:52.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:52."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/brussels#webpage", "url": "https://dchub.cloud/markets/brussels", "name": "Brussels data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Brussels data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Brussels market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Brussels data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Brussels market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```