---
description: Is Bristow a good data center market for power? DCPI verdict AVOID, score 21.1/100 (PJM), as of 2026-11-12. 374 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Bristow data centers: power, grid and capacity | DC Hub"
---

# Bristow data center market

Power availability in Bristow: DCPI verdict AVOID, composite score 21.1 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 200 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Bristow data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Bristow market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**21.1/100**

MW, all listings**374**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Bristow at a glance

Bristow has 14 MW operational and 360 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Compass Datacenters (300 MW), Yondr Group (60 MW) and Digital Realty (14 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 14 |
| Under construction | 360 |
| Total listed | 374 |

## Developers building or planning in Bristow

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| Compass Datacenters | 300 |  |
| Yondr Group | 60 |  |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Bristow

DC Hub does not hold a lease-rate figure for this market yet.

Digital Realty operates two facilities in the market, while Google, Microsoft, NOVA MANGO FARMS LLC, and Yondr Group each operate one. The operator base reflects a mix of hyperscale entrants and specialized infrastructure providers, with no single entity dominating the footprint.

No recent deals have been tracked in Bristow.

## Data centers in Bristow

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Compass Datacenters Prince William County VA](https://dchub.cloud/facilities/compass-datacenters-compass-datacenters-prince-william-county-va-da26c259) | Compass Datacenters | Under Construction | 300 |
| [Yondr Bristow VA Campus](https://dchub.cloud/facilities/yondr-group-yondr-bristow-va-campus-899d5c71) | Yondr Group | Under Construction | 60 |
| [VA 4](https://dchub.cloud/facilities/digital-realty-va-4-272d9cfa) | Digital Realty | Operational | 14 |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Virginia](https://dchub.cloud/facilities/in/us/virginia).

## More on Bristow

- [Bristow DCPI score](https://dchub.cloud/dcpi/bristow)
- [Bristow market brief](https://dchub.cloud/markets/bristow/brief)
- [Virginia data center market brief](https://dchub.cloud/states/virginia/brief)
- [Virginia data center tax incentives](https://dchub.cloud/states/virginia/data-center-incentives)

### Email me when the Bristow DCPI verdict changes

Email me when Bristow's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Bristow: 374 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=bristow) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=bristow)

JSON: [/api/v1/markets/bristow/deep-dive](https://dchub.cloud/api/v1/markets/bristow/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Bristow","item":"https://dchub.cloud/markets/bristow"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Bristow Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:46:19.205415+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/bristow",
 "wordCount":200,
 "about":{"@type":"Place","name":"Bristow"},
 "description":"Live data-center market analysis. DCPI score 21.1/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "bristow", "name": "Bristow Data Center Market — DC Hub", "description": "Live data-center market measurements for Bristow, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/bristow", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Bristow"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 374.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 21.1, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:46:53."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:53.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:53."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/bristow#webpage", "url": "https://dchub.cloud/markets/bristow", "name": "Bristow data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Bristow data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Bristow market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Bristow data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Bristow market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
