# Brisbane data center market

Power availability in Brisbane: DCPI verdict AVOID, composite score 24 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 274 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Brisbane data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Brisbane market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**24.0/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Brisbane

DC Hub does not hold a lease-rate figure for this market yet.

No recent deals have been tracked in the market.

This combination does not preclude new projects—a 10-story data center facility is in planning stages outside Brisbane with co-location near battery energy storage and a substation—but it does signal that new power will not be readily available at current grid terms.

The operator landscape is concentrated among regional and national carriers. Pipe Networks holds four facilities, Vocus Group three, and Equinix two, with smaller operators including Aapt and Brennan IT each holding single sites. This does not indicate market weakness or operator retrenchment; it reflects the current data capture window and the regional nature of Brisbane's operator base, which differs markedly from consolidation patterns visible in larger Asia-Pacific hubs currently attracting consortium-scale investment.

## Data centers in Brisbane

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [5GN Brisbane Data Centre (BDC)](https://dchub.cloud/facilities/5g-networks-5gn-brisbane-data-centre-bdc-7d86740f) | 5G Networks | Operational |  |
| [AAPT Brisbane](https://dchub.cloud/facilities/vocus-group-aapt-brisbane-c5feaaee) | Vocus Group | Operational |  |
| [AAPT Fortitude Valley](https://dchub.cloud/facilities/vocus-group-aapt-fortitude-valley-77fd6f2a) | Vocus Group | Operational |  |
| [Brisbane](https://dchub.cloud/facilities/equinix-brisbane-0c512d7b) | Equinix | Operational |  |
| [Equinix BR1 - Brisbane (formerly Metronode Brisbane 1)](https://dchub.cloud/facilities/equinix-equinix-br1-brisbane-formerly-metronode-brisbane-1-bb48ab25) | Equinix | Operational |  |
| [Host Networks BNE1](https://dchub.cloud/facilities/host-networks-host-networks-bne1-90eee7d8) | Host Networks | Operational |  |
| [Polaris Data Centre](https://dchub.cloud/facilities/polaris-data-centre-polaris-data-centre-b289948b) |  | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Australia](https://dchub.cloud/facilities/in/au).

## More on Brisbane

- [Brisbane DCPI score](https://dchub.cloud/dcpi/brisbane)
- [Brisbane market brief](https://dchub.cloud/markets/brisbane/brief)

### Email me when the Brisbane DCPI verdict changes

Email me when Brisbane's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Brisbane market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=brisbane) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=brisbane)

JSON: [/api/v1/markets/brisbane/deep-dive](https://dchub.cloud/api/v1/markets/brisbane/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Brisbane","item":"https://dchub.cloud/markets/brisbane"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Brisbane Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:46:10.203013+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/brisbane",
 "wordCount":274,
 "about":{"@type":"Place","name":"Brisbane"},
 "description":"Live data-center market analysis. DCPI score 24.0/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "brisbane", "name": "Brisbane Data Center Market — DC Hub", "description": "Live data-center market measurements for Brisbane, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/brisbane", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Brisbane"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 24.0, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:08."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:08.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:08."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/brisbane#webpage", "url": "https://dchub.cloud/markets/brisbane", "name": "Brisbane data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Brisbane data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Brisbane market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Brisbane data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Brisbane market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```