---
description: Is Bridgewater Township a good data center market for power? DCPI verdict AVOID, score 22.6/100 (PJM), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Bridgewater Township data centers: power, grid and capacity | DC Hub"
---

# Bridgewater Township data center market

Power availability in Bridgewater Township: DCPI verdict AVOID, composite score 22.6 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 291 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Bridgewater Township data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Bridgewater Township market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**22.6/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

This analysis was written on 2026-11-07, when the Data Center Power Index for this market read 22.8. The index is recomputed through the day and reads 22.6 now — the figure above is the live one, and the narrative below describes the market as it stood when it was written.

## Colocation lease rates in Bridgewater Township

DC Hub does not hold a lease-rate figure for this market yet.

No capacity figures are available from current facility reporting. The operator roster reflects a mix of independent colocation, financial services infrastructure, and carrier presence, indicating fragmented rather than consolidated control of local supply.

No recent deals have been tracked in Bridgewater Township, indicating an absence of acquisition activity, new site announcements, or operator expansion over the tracked period. These regulatory postures materially shape the feasibility and timeline calculus for new builds or major upgrades, independent of power supply dynamics.

Power procurement difficulty and municipal resistance together define the near-term outlook for site operations and expansion in Bridgewater Township.

## Data centers in Bridgewater Township

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [365 Data Centers New Jersey (NJ1)](https://dchub.cloud/facilities/365-data-centers-365-data-centers-new-jersey-nj1-5a98f3ef) | 365 Data Centers | Operational |  |
| [Goldman Sachs](https://dchub.cloud/facilities/unknown-goldman-sachs-858cecd4) |  | Operational |  |
| [Verizon Wireless NE Headquarters](https://dchub.cloud/facilities/verizon-wireless-ne-headquarters-verizon-wireless-ne-headquarters-e1ab1f22) |  | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [New Jersey](https://dchub.cloud/facilities/in/us/new-jersey).

## More on Bridgewater Township

- [Bridgewater Township DCPI score](https://dchub.cloud/dcpi/bridgewater-township)
- [Bridgewater Township market brief](https://dchub.cloud/markets/bridgewater-township/brief)
- [New Jersey data center market brief](https://dchub.cloud/states/new-jersey/brief)
- [New Jersey data center tax incentives](https://dchub.cloud/states/new-jersey/data-center-incentives)

### Email me when the Bridgewater Township DCPI verdict changes

Email me when Bridgewater Township's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Bridgewater Township market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=bridgewater-township) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=bridgewater-township)

JSON: [/api/v1/markets/bridgewater-township/deep-dive](https://dchub.cloud/api/v1/markets/bridgewater-township/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Bridgewater Township","item":"https://dchub.cloud/markets/bridgewater-township"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Bridgewater Township Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:46:02.158449+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/bridgewater-township",
 "wordCount":291,
 "about":{"@type":"Place","name":"Bridgewater Township"},
 "description":"Live data-center market analysis. DCPI score 22.6/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "bridgewater-township", "name": "Bridgewater Township Data Center Market — DC Hub", "description": "Live data-center market measurements for Bridgewater Township, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/bridgewater-township", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Bridgewater Township"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 22.6, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:46:35."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:35.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:35."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/bridgewater-township#webpage", "url": "https://dchub.cloud/markets/bridgewater-township", "name": "Bridgewater Township data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Bridgewater Township data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Bridgewater Township market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Bridgewater Township data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Bridgewater Township market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
