---
description: Is Breinigsville a good data center market for power? DCPI verdict AVOID, score 19.6/100 (PJM), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Breinigsville data centers: power, grid and capacity | DC Hub"
---

# Breinigsville data center market

Power availability in Breinigsville: DCPI verdict AVOID, composite score 19.6 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 254 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Breinigsville data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Breinigsville market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**19.6/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

This analysis was written on 2026-11-07, when the Data Center Power Index for this market read 19.5. The index is recomputed through the day and reads 19.6 now — the figure above is the live one, and the narrative below describes the market as it stood when it was written.

## Colocation lease rates in Breinigsville

DC Hub does not hold a lease-rate figure for this market yet.

Breinigsville hosts seven tracked facilities operated primarily by TierPoint across multiple branded entities. The market is anchored by TierPoint's three separate facility registrations (TierPoint LLC, TIERPOINT TWO LLC – TEKPARK FACILITY, and a second TierPoint location), with secondary operators including Allentown-TekPark and Colocation America Corporation. The fragmented operator roster and limited facility count reflect a modest regional footprint within Pennsylvania's broader data center corridor.

This reading does not reflect the quality or demand characteristics of existing facilities, but rather the structural availability of new power supply to the market.

No recent deals have been tracked in Breinigsville, indicating an absence of recorded M&A or major capacity transactions in the tracked period. The operator concentration around TierPoint suggests a stable incumbent base with limited churn or entry activity. Regional context from adjacent Pennsylvania markets shows active interest in data center development—a 100 MW facility was proposed in Allentown and a large Dauphin County project advanced—but Breinigsville itself has not been the site of announced transactions or announced new supply commitments.

## Data centers in Breinigsville

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [PDC1 - 9999 Hamilton blvd](https://dchub.cloud/facilities/colocation-america-corporation-pdc1-9999-hamilton-blvd-cfadef9a) | Colocation America Corporation | Operational |  |
| [TIERPOINT TWO, LLC - TEKPARK FACILITY](https://dchub.cloud/facilities/tierpoint-two-llc-tekpark-facility-f33cda8f) | TierPoint |  |  |
| [TierPoint Allentown-TekPark](https://dchub.cloud/facilities/tierpoint-llc-tierpoint-allentown-tekpark-140e8a14) | TierPoint, LLC | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Pennsylvania](https://dchub.cloud/facilities/in/us/pennsylvania).

## More on Breinigsville

- [Breinigsville DCPI score](https://dchub.cloud/dcpi/breinigsville)
- [Breinigsville market brief](https://dchub.cloud/markets/breinigsville/brief)
- [Pennsylvania data center market brief](https://dchub.cloud/states/pennsylvania/brief)
- [Pennsylvania data center tax incentives](https://dchub.cloud/states/pennsylvania/data-center-incentives)

### Email me when the Breinigsville DCPI verdict changes

Email me when Breinigsville's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Breinigsville market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=breinigsville) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=breinigsville)

JSON: [/api/v1/markets/breinigsville/deep-dive](https://dchub.cloud/api/v1/markets/breinigsville/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Breinigsville","item":"https://dchub.cloud/markets/breinigsville"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Breinigsville Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:45:46.576694+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/breinigsville",
 "wordCount":254,
 "about":{"@type":"Place","name":"Breinigsville"},
 "description":"Live data-center market analysis. DCPI score 19.6/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "breinigsville", "name": "Breinigsville Data Center Market — DC Hub", "description": "Live data-center market measurements for Breinigsville, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/breinigsville", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Breinigsville"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 19.6, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:42."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:42.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:42."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/breinigsville#webpage", "url": "https://dchub.cloud/markets/breinigsville", "name": "Breinigsville data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Breinigsville data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Breinigsville market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Breinigsville data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Breinigsville market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
