Power availability in Brandon: DCPI verdict AVOID, composite score 35.7 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 239 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Brandon data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Brandon market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**35.7/100**

MW, all listings**150**every tracked site reports MWany status, unverified listings included

Verdict**AVOID**

## Brandon at a glance

Brandon has 150 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are AVAIO Digital (150 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Under construction | 150 |
| Total listed | 150 |

## Developers building or planning in Brandon

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| AVAIO Digital | 150 |  |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Brandon

DC Hub does not hold a lease-rate figure for this market yet.

Brandon's tracked data center footprint comprises a single facility operated by AVAIO Digital, with power capacity reported by only that one site. These readings place Brandon in the lowest quartile for power accessibility among actively monitored markets.

The DCPI verdict of AVOID reflects the power procurement environment specifically. This combination—tight current supply and difficult incremental procurement—creates unfavorable conditions for projects dependent on rapid or large-scale power additions.

Deal flow in Brandon remains dormant by registry count; no transactions have been tracked recently. The single tracked operator, AVAIO Digital, operates the market's only documented facility. The relevance and status of these references to Brandon's current tracked market state remains unclear from available sources.

## Data centers in Brandon

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [AVAIO Digital Taurus (Brandon Campus)](https://dchub.cloud/facilities/avaio-digital-avaio-digital-taurus-brandon-campus-a48d5c7a) | AVAIO Digital | Under Construction | 150 |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Mississippi](https://dchub.cloud/facilities/in/us/mississippi).

## More on Brandon

- [Brandon DCPI score](https://dchub.cloud/dcpi/brandon)
- [Brandon market brief](https://dchub.cloud/markets/brandon/brief)
- [Mississippi data center market brief](https://dchub.cloud/states/mississippi/brief)
- [Mississippi data center tax incentives](https://dchub.cloud/states/mississippi/data-center-incentives)

### Email me when the Brandon DCPI verdict changes

Email me when Brandon's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Brandon: 150 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=brandon) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=brandon)

JSON: [/api/v1/markets/brandon/deep-dive](https://dchub.cloud/api/v1/markets/brandon/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Brandon","item":"https://dchub.cloud/markets/brandon"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Brandon Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:45:31.265505+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/brandon",
 "wordCount":239,
 "about":{"@type":"Place","name":"Brandon"},
 "description":"Live data-center market analysis. DCPI score 35.7/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "brandon", "name": "Brandon Data Center Market — DC Hub", "description": "Live data-center market measurements for Brandon, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/brandon", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Brandon"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 150.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 35.7, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:50:08."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:50:08.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:50:08."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/brandon#webpage", "url": "https://dchub.cloud/markets/brandon", "name": "Brandon data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Brandon data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Brandon market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Brandon data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Brandon market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```