description: Is Bologna a good data center market for power? DCPI verdict AVOID, score 11.7/100 (ENTSOE-IT), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Bologna data centers: power, grid and capacity | DC Hub"
---

# Bologna data center market

Power availability in Bologna: DCPI verdict AVOID, composite score 11.7 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 252 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Bologna data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Bologna market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**11.7/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Bologna

DC Hub does not hold a lease-rate figure for this market yet.

The market remains underdeveloped relative to larger Italian metros, with sparse deal activity and limited transparency on aggregate capacity. No tracked site has reported megawatt inventory, reflecting either nascent facility documentation or modest scale across the operator base.

Together, these metrics suggest that operators seeking to expand footprint or add capacity will face both weak demand absorption and hard physical or administrative barriers to sourcing incremental power.

Deal flow into Bologna remains static. No recent transactions have been recorded in the tracked dataset, contrasting sharply with Italy's broader data center investment pipeline, which is projected to attract €36.9 billion through 2036 as AI and cloud demand accelerate buildout nationally.

## Data centers in Bologna

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [BOIX](https://dchub.cloud/facilities/lepida-scpa-boix-6d7ae59f) | Lepida S.c.p.A. | Operational |  |
| [Data center Unipol Pilastro](https://dchub.cloud/facilities/unipol-data-center-unipol-pilastro-922e5ba3) | Unipol | Operational |  |
| [Ehiweb.it Bologna](https://dchub.cloud/facilities/ehinet-srl-ehiwebit-bologna-50345ea7) | Ehinet Srl | Operational |  |
| [Leonardo (supercomputer)](https://dchub.cloud/facilities/cineca-leonardo-supercomputer-be3d1c37) | CINECA | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Italy](https://dchub.cloud/facilities/in/it).

## More on Bologna

- [Bologna DCPI score](https://dchub.cloud/dcpi/bologna)
- [Bologna market brief](https://dchub.cloud/markets/bologna/brief)

### Email me when the Bologna DCPI verdict changes

Email me when Bologna's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Bologna market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=bologna) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=bologna)

JSON: [/api/v1/markets/bologna/deep-dive](https://dchub.cloud/api/v1/markets/bologna/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Bologna","item":"https://dchub.cloud/markets/bologna"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Bologna Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:43:32.167106+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/bologna",
 "wordCount":252,
 "about":{"@type":"Place","name":"Bologna"},
 "description":"Live data-center market analysis. DCPI score 11.7/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "bologna", "name": "Bologna Data Center Market — DC Hub", "description": "Live data-center market measurements for Bologna, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/bologna", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Bologna"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 11.7, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:14."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:14.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:14."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/bologna#webpage", "url": "https://dchub.cloud/markets/bologna", "name": "Bologna data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Bologna data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Bologna market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Bologna data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Bologna market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```