# Boise data center market

Power availability in Boise: DCPI verdict CAUTION, composite score 47.1 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 284 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Boise data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Boise market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**47.1/100**

MW, all listings**20**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**CAUTION**

## Colocation lease rates in Boise

DC Hub does not hold a lease-rate figure for this market yet.

Three operators—CenturyLink Boise, Fiberpipe, and DataSite—each manage single facilities in the market. The fragmented operator base reflects a nascent market where no single entity has consolidated regional control, contrasting with hyperscaler-dominated regions.

For site developers, this means new power will be obtainable but not frictionless; grid access require active coordination with Idaho Power and potential phased interconnection schedules.

No recent deals are tracked in Boise's registry, leaving operator dynamics opaque. The three single-facility operators show no consolidation activity, merger signals, or announced expansion. Without M&A flow or announced facility transactions, it is unclear whether capacity growth will emerge from existing operator investment or new entrant acquisition of sites.

Two data center proposals on federal land south of Boise and near Shoshone are under BLM evaluation, indicating pipeline interest despite the absence of recent transaction records. Mayor Lauren McLean's data center moratorium proposal adds regulatory uncertainty to the development timeline. Whether new supply materializes will depend on whether these federal land proposals advance and whether local policy frameworks stabilize around growth.

## Data centers in Boise

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [DataSite, Boise](https://dchub.cloud/facilities/datasite-datasite-boise-3af82458) | DataSite | Operational |  |
| [Level(3) Boise](https://dchub.cloud/facilities/lumen-technologies-level3-boise-0340d529) | Lumen Technologies | Operational |  |
| [Meta Kuna Data Center](https://dchub.cloud/facilities/meta-meta-kuna-data-center-596186f5) | Meta | Operational |  |
| [Syringa Networks Boise](https://dchub.cloud/facilities/syringa-networks-boise-syringa-networks-boise-9b9d9095) |  | Operational |  |
| [Tonaquint Data Center - Boise ID](https://dchub.cloud/facilities/tonaquint-data-center-inc-tonaquint-data-center-boise-id-fa370106) | Tonaquint Data Center, Inc. | Operational |  |
| [ark data centers - Boise, ID](https://dchub.cloud/facilities/ark-data-centers-ark-data-centers-boise-id-b6a8e108) | ark data centers | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Idaho](https://dchub.cloud/facilities/in/us/idaho).

## More on Boise

- [Boise DCPI score](https://dchub.cloud/dcpi/boise)
- [Boise market brief](https://dchub.cloud/markets/boise/brief)
- [Idaho data center market brief](https://dchub.cloud/states/idaho/brief)
- [Idaho data center tax incentives](https://dchub.cloud/states/idaho/data-center-incentives)

### Email me when the Boise DCPI verdict changes

Email me when Boise's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Boise: 20 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=boise) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=boise)

JSON: [/api/v1/markets/boise/deep-dive](https://dchub.cloud/api/v1/markets/boise/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Boise","item":"https://dchub.cloud/markets/boise"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Boise Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:43:24.595183+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/boise",
 "wordCount":284,
 "about":{"@type":"Place","name":"Boise"},
 "description":"Live data-center market analysis. DCPI score 47.1/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "boise", "name": "Boise Data Center Market — DC Hub", "description": "Live data-center market measurements for Boise, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/boise", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Boise"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 20.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 47.1, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:46:26."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:26.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:26."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/boise#webpage", "url": "https://dchub.cloud/markets/boise", "name": "Boise data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Boise data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Boise market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Boise data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Boise market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```