# Bogotá data center market

Power availability in Bogotá: DCPI verdict AVOID, composite score 10 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 196 words · generated 2026-11-11 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Bogotá data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Bogotá market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**10.0/100**

MW, all listings**15**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Bogotá at a glance

Bogotá has 15 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are ODATA (15 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 15 |
| Total listed | 15 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Bogotá

DC Hub does not hold a lease-rate figure for this market yet.

Only one tracked operator reports megawatt capacity to the market. The market has recorded no recent power or infrastructure deals.

This combination signals that spare grid or dedicated power capacity is functionally unavailable to new entrants or existing operators seeking expansion, and that physical, regulatory, or utility-side obstacles to securing incremental supply are acute. The verdict reflects current conditions; it does not assess demand, market quality, or operator viability.

Deal flow into Bogotá itself, however, remains untracked over the measurement window. The four-operator concentration (Equinix, Cirion, Edgeuno, Ifx Networks) accounts for 12 of 75 sites, leaving the majority distributed across smaller or single-site operators.

## Data centers in Bogotá

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [ODATA Bogotá 1](https://dchub.cloud/facilities/odata-odata-bogot-1-662513d1) | ODATA | Operational | 15 |
| [EdgeConneX Bogota CO](https://dchub.cloud/facilities/edgeconnex-edgeconnex-bogota-co-7bd560a1) | EdgeConneX | Operational |  |
| [Equinix BG1 - Bogota](https://dchub.cloud/facilities/equinix-equinix-bg1-bogota-422ec4d4) | Equinix | Operational |  |
| [Equinix BG2 - Bogota](https://dchub.cloud/facilities/equinix-equinix-bg2-bogota-eaf01dd8) | Equinix | Operational |  |
| [Takoda BG01](https://dchub.cloud/facilities/takoda-data-centers-takoda-bg01-5c60628a) | Takoda Data Centers | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Colombia](https://dchub.cloud/facilities/in/co).

## More on Bogotá

- [Bogotá DCPI score](https://dchub.cloud/dcpi/bogota)
- [Bogotá market brief](https://dchub.cloud/markets/bogota/brief)
- [Colorado data center market brief](https://dchub.cloud/states/colorado/brief)
- [Colorado data center tax incentives](https://dchub.cloud/states/colorado/data-center-incentives)

### Email me when the Bogotá DCPI verdict changes

Email me when Bogotá's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Bogotá: 15 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=bogota) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=bogota)

JSON: [/api/v1/markets/bogota/deep-dive](https://dchub.cloud/api/v1/markets/bogota/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-11, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Bogota","item":"https://dchub.cloud/markets/bogota"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Bogotá Data Center Market Deep-Dive",
 "datePublished":"2026-11-11T09:02:23.564705+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/bogota",
 "wordCount":196,
 "about":{"@type":"Place","name":"Bogotá"},
 "description":"Live data-center market analysis. DCPI score 10.0/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "bogota", "name": "Bogotá Data Center Market — DC Hub", "description": "Live data-center market measurements for Bogotá, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/bogota", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Bogotá"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 15.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 10.0, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:17."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:17.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:17."}], "dateModified": "2026-11-11", "temporalCoverage": "2026-11-11"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/bogota#webpage", "url": "https://dchub.cloud/markets/bogota", "name": "Bogotá data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Bogotá data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Bogotá market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Bogotá data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Bogotá market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```