---
description: Is Boca Raton a good data center market for power? DCPI verdict AVOID, score 31.5/100 (FRCC), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Boca Raton data centers: power, grid and capacity | DC Hub"
---

# Boca Raton data center market

Power availability in Boca Raton: DCPI verdict AVOID, composite score 31.5 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 275 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Boca Raton data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Boca Raton market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**31.5/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Boca Raton

DC Hub does not hold a lease-rate figure for this market yet.

No tracked sites have reported megawatt data, limiting visibility into absolute capacity or utilization depth across the market.

For operators seeking to expand or new entrants planning facilities, power procurement timelines and costs will likely carry elevated uncertainty.

No recent transactions have been tracked in Boca Raton, and the operator roster remains static. The five-site footprint is fragmented, with each of the five major operators holding a single facility. The absence of announced deals does not signal market weakness; rather, it reflects the reality that Boca Raton's power and supply position does not currently create the conditions that typically drive transaction activity in data center markets.

## Data centers in Boca Raton

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Cogent Boca Raton](https://dchub.cloud/facilities/cogent-communications-inc-cogent-boca-raton-5e794be2) | Cogent Communications, Inc. | Operational |  |
| [Equinix MI3 - Miami, Boca Raton](https://dchub.cloud/facilities/equinix-equinix-mi3-miami-boca-raton-abe8243c) | Equinix | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Florida](https://dchub.cloud/facilities/in/us/florida).

## More on Boca Raton

- [Boca Raton DCPI score](https://dchub.cloud/dcpi/boca-raton)
- [Boca Raton market brief](https://dchub.cloud/markets/boca-raton/brief)
- [Florida data center market brief](https://dchub.cloud/states/florida/brief)
- [Florida data center tax incentives](https://dchub.cloud/states/florida/data-center-incentives)

### Email me when the Boca Raton DCPI verdict changes

Email me when Boca Raton's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Boca Raton market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=boca-raton) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=boca-raton)

JSON: [/api/v1/markets/boca-raton/deep-dive](https://dchub.cloud/api/v1/markets/boca-raton/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Boca Raton","item":"https://dchub.cloud/markets/boca-raton"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Boca Raton Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:43:08.106787+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/boca-raton",
 "wordCount":275,
 "about":{"@type":"Place","name":"Boca Raton"},
 "description":"Live data-center market analysis. DCPI score 31.5/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "boca-raton", "name": "Boca Raton Data Center Market — DC Hub", "description": "Live data-center market measurements for Boca Raton, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/boca-raton", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Boca Raton"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 31.5, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:01."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:01.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:01."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/boca-raton#webpage", "url": "https://dchub.cloud/markets/boca-raton", "name": "Boca Raton data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Boca Raton data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Boca Raton market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Boca Raton data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Boca Raton market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
