---
description: Is Boardman a good data center market for power? DCPI verdict CAUTION, score 47.0/100 (WECC), as of 2026-11-12. 600 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Boardman data centers: power, grid and capacity | DC Hub"
---

# Boardman data center market

Power availability in Boardman: DCPI verdict CAUTION, composite score 47 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 214 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Boardman data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Boardman market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**47.0/100**

MW, all listings**600**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**CAUTION**

## Boardman at a glance

Boardman has 300 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Amazon Web Services (300 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 300 |
| Total listed | 300 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Boardman

DC Hub does not hold a lease-rate figure for this market yet.

The market is dominated by Amazon Web Services and AWS entities controlling four and two facilities respectively, with Carrier Services Group and Rowan Green Data LLC each operating single sites. No recent deals have been tracked in this market.

The DCPI verdict of CAUTION reflects mixed signals on power availability. Together, these scores flag that new power procurement will face headwinds but is not blocked. Operators should expect deliberate negotiation timelines and potential infrastructure dependencies rather than immediate availability or severe bottlenecks.

Boardman's operator base remains static, with no M&A activity tracked recently. AWS's substantial footprint across six facilities suggests established infrastructure and long-term commitment to the region, but the absence of deal flow—acquisitions, divestments, or platform consolidation—indicates limited secondary market dynamics. Boardman's quiet deal environment may reflect either operator satisfaction with existing assets or reduced appetite for Boardman-specific opportunities.

Power and supply conditions will shape whether Boardman attracts incremental capacity investment or remains a stable but dormant market through 2027.

## Data centers in Boardman

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [AWS US-West-2 Boardman Campus](https://dchub.cloud/facilities/amazon-web-services-aws-us-west-2-boardman-campus-a85a4208) | Amazon Web Services | Operational | 300 |
| [Amazon PDX91](https://dchub.cloud/facilities/amazon-web-services-amazon-pdx91-18b24abe) | Amazon Web Services | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Oregon](https://dchub.cloud/facilities/in/us/oregon).

## More on Boardman

- [Boardman DCPI score](https://dchub.cloud/dcpi/boardman)
- [Boardman market brief](https://dchub.cloud/markets/boardman/brief)
- [Oregon data center market brief](https://dchub.cloud/states/oregon/brief)
- [Oregon data center tax incentives](https://dchub.cloud/states/oregon/data-center-incentives)

### Email me when the Boardman DCPI verdict changes

Email me when Boardman's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Boardman: 600 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=boardman) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=boardman)

JSON: [/api/v1/markets/boardman/deep-dive](https://dchub.cloud/api/v1/markets/boardman/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Boardman","item":"https://dchub.cloud/markets/boardman"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Boardman Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:43:01.158621+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/boardman",
 "wordCount":214,
 "about":{"@type":"Place","name":"Boardman"},
 "description":"Live data-center market analysis. DCPI score 47.0/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "boardman", "name": "Boardman Data Center Market — DC Hub", "description": "Live data-center market measurements for Boardman, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/boardman", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Boardman"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 600.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 47.0, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:46:22."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:22.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:22."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/boardman#webpage", "url": "https://dchub.cloud/markets/boardman", "name": "Boardman data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Boardman data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Boardman market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Boardman data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Boardman market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
