---
description: Is Bluffdale a good data center market for power? DCPI verdict CAUTION, score 48.8/100 (WECC), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Bluffdale data centers: power, grid and capacity | DC Hub"
---

# Bluffdale data center market

Power availability in Bluffdale: DCPI verdict CAUTION, composite score 48.8 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 247 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Bluffdale data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Bluffdale market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**48.8/100**

MW, all listings**0**any status, unverified listings included

Verdict**CAUTION**

## Colocation lease rates in Bluffdale

DC Hub does not hold a lease-rate figure for this market yet.

Actual installed or committed megawatt capacity remains unreported, as only one facility in the tracked cohort has submitted power consumption data to the registry.

Together, these scores suggest that incremental power for new or expanded facilities is available but will require active procurement effort and negotiation; it is not a trivial utility tap.

No recent deals are tracked in Bluffdale's registry. The market's concentration—DataBank's near-monopoly across 12 sites—may reflect a stable, vertically integrated operator holding assets long-term rather than a signal of dormancy.

Power sourcing in Bluffdale will require direct engagement with grid infrastructure and utility planning; utilities across U.S. data center regions are increasing five-year investment commitments to support load growth, but regional variation in grid readiness remains significant.

## Data centers in Bluffdale

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [DataBank Salt Lake City (SLC5)](https://dchub.cloud/facilities/databank-databank-salt-lake-city-slc5-636ba73f) | DataBank | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Utah](https://dchub.cloud/facilities/in/us/utah).

## More on Bluffdale

- [Bluffdale DCPI score](https://dchub.cloud/dcpi/bluffdale)
- [Bluffdale market brief](https://dchub.cloud/markets/bluffdale/brief)
- [Utah data center market brief](https://dchub.cloud/states/utah/brief)
- [Utah data center tax incentives](https://dchub.cloud/states/utah/data-center-incentives)

### Email me when the Bluffdale DCPI verdict changes

Email me when Bluffdale's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Bluffdale market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=bluffdale) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=bluffdale)

JSON: [/api/v1/markets/bluffdale/deep-dive](https://dchub.cloud/api/v1/markets/bluffdale/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Bluffdale","item":"https://dchub.cloud/markets/bluffdale"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Bluffdale Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:42:54.665158+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/bluffdale",
 "wordCount":247,
 "about":{"@type":"Place","name":"Bluffdale"},
 "description":"Live data-center market analysis. DCPI score 48.8/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "bluffdale", "name": "Bluffdale Data Center Market — DC Hub", "description": "Live data-center market measurements for Bluffdale, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/bluffdale", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Bluffdale"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 48.8, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:41."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:41.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:41."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/bluffdale#webpage", "url": "https://dchub.cloud/markets/bluffdale", "name": "Bluffdale data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Bluffdale data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Bluffdale market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Bluffdale data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Bluffdale market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
