---
description: Is Bismarck a good data center market for power? DCPI verdict AVOID, score 35.0/100 (MISO), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Bismarck data centers: power, grid and capacity | DC Hub"
---

# Bismarck data center market

Power availability in Bismarck: DCPI verdict AVOID, composite score 35 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 259 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Bismarck data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Bismarck market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**35.0/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Bismarck

DC Hub does not hold a lease-rate figure for this market yet.

Bismarck's tracked data center infrastructure consists of a single facility operated by Dakota Carrier Network. No capacity figures are available from operator submissions in this market.

The DCPI verdict of AVOID reflects what these two metrics reveal about securing incremental power. Together, these scores suggest that operators seeking to expand or new entrants planning builds would face material delays and coordination challenges in securing additional megawatts, even though power is not scarce in absolute terms.

Deal flow in Bismarck has been inactive by DC Hub's tracking. The single tracked operator, Dakota Carrier Network, has no recent transaction history recorded. This absence of announced deals, acquisitions, or investments reflects a quiet market from a capital activity standpoint; it does not indicate distress or withdrawal. The operator landscape remains concentrated and stable.

Regional momentum in North Dakota—particularly around Fargo to the north—has attracted significant development interest, with announcements of planned data center projects backed by power infrastructure upgrades. Bismarck's position as the state capital and potential secondary hub warrants monitoring for shifts in power availability as statewide grid investments mature.

## More on Bismarck

- [Bismarck DCPI score](https://dchub.cloud/dcpi/bismarck)
- [Bismarck market brief](https://dchub.cloud/markets/bismarck/brief)
- [North Dakota data center market brief](https://dchub.cloud/states/north-dakota/brief)
- [North Dakota data center tax incentives](https://dchub.cloud/states/north-dakota/data-center-incentives)

### Email me when the Bismarck DCPI verdict changes

Email me when Bismarck's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Bismarck market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=bismarck) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=bismarck)

JSON: [/api/v1/markets/bismarck/deep-dive](https://dchub.cloud/api/v1/markets/bismarck/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Bismarck","item":"https://dchub.cloud/markets/bismarck"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Bismarck Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:42:47.000689+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/bismarck",
 "wordCount":259,
 "about":{"@type":"Place","name":"Bismarck"},
 "description":"Live data-center market analysis. DCPI score 35.0/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "bismarck", "name": "Bismarck Data Center Market — DC Hub", "description": "Live data-center market measurements for Bismarck, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/bismarck", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Bismarck"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 35.0, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:48:31."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:31.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:31."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/bismarck#webpage", "url": "https://dchub.cloud/markets/bismarck", "name": "Bismarck data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Bismarck data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Bismarck market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Bismarck data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Bismarck market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
