---
description: Is Birmingham a good data center market for power? DCPI verdict AVOID, score 23.4/100 (SOCO), as of 2026-11-12. 15 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Birmingham data centers: power, grid and capacity | DC Hub"
---

# Birmingham data center market

Power availability in Birmingham: DCPI verdict AVOID, composite score 23.4 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 201 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Birmingham data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Birmingham market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**23.4/100**

MW, all listings**15**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Birmingham

DC Hub does not hold a lease-rate figure for this market yet.

Only one operator reports megawatt capacity to DC Hub, limiting visibility into total deployable power across the market. The operator roster reflects established carrier and systems integrator presence rather than hyperscale or wholesale-focused entrants.

This combination does not support easy power growth.

Deal flow in Birmingham has stalled. No recent transactions have been tracked in this market. Operator footprints remain stable: Verizon and Centurylink maintain paired sites each, suggesting entrenchment rather than consolidation or expansion. The absence of acquisition, build-to-suit, or lease activity over the tracked period points to minimal capital movement and no visible operator repositioning.

Power supply friction is likely to persist absent material grid upgrades or new utility contracts in the region.

## Data centers in Birmingham

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [nLighten Birmingham BHX1](https://dchub.cloud/facilities/nlighten-hq-bv-nlighten-birmingham-bhx1-ae9eb522) | nLighten HQ BV | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [United Kingdom](https://dchub.cloud/facilities/in/gb).

## More on Birmingham

- [Birmingham DCPI score](https://dchub.cloud/dcpi/birmingham)
- [Birmingham market brief](https://dchub.cloud/markets/birmingham/brief)
- [Alabama data center market brief](https://dchub.cloud/states/alabama/brief)
- [Alabama data center tax incentives](https://dchub.cloud/states/alabama/data-center-incentives)

### Email me when the Birmingham DCPI verdict changes

Email me when Birmingham's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Birmingham: 15 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=birmingham) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=birmingham)

JSON: [/api/v1/markets/birmingham/deep-dive](https://dchub.cloud/api/v1/markets/birmingham/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Birmingham","item":"https://dchub.cloud/markets/birmingham"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Birmingham Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:42:39.576795+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/birmingham",
 "wordCount":201,
 "about":{"@type":"Place","name":"Birmingham"},
 "description":"Live data-center market analysis. DCPI score 23.4/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "birmingham", "name": "Birmingham Data Center Market — DC Hub", "description": "Live data-center market measurements for Birmingham, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/birmingham", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Birmingham"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 15.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 23.4, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:26."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:26.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:26."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/birmingham#webpage", "url": "https://dchub.cloud/markets/birmingham", "name": "Birmingham data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Birmingham data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Birmingham market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Birmingham data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Birmingham market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
