description: Is Billings a good data center market for power? DCPI verdict AVOID, score 36.5/100 (WECC), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Billings data centers: power, grid and capacity | DC Hub"
---

# Billings data center market

Power availability in Billings: DCPI verdict AVOID, composite score 36.5 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 269 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Billings data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Billings market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**36.5/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Billings

DC Hub does not hold a lease-rate figure for this market yet.

The market has attracted regulatory attention, including ongoing litigation at the county commissioner level and federal agreements affecting infrastructure development in the region. No recent power or facility deals have been tracked in this market.

The DCPI verdict reflects a fundamental tension in Billings' power profile. This divergence—abundant supply coupled with high structural barriers—means new entrants or operators seeking to add load should anticipate significant friction in connecting to or expanding within the grid.

The absence of tracked recent deals indicates no active M&A, asset transfers, or power-backed facility transactions in the near term. This stasis contrasts with sector-wide deal flow but mirrors dormancy observed in peer markets like Des Moines and Bluffdale, where transaction volume has similarly flatlined despite underlying infrastructure assets.

Billings' power and supply outlook will depend on resolution of the regulatory and community friction currently documented in county-level disputes and ongoing federal infrastructure negotiations affecting the region.

## Data centers in Billings

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Cogent Billings](https://dchub.cloud/facilities/cogent-communications-inc-cogent-billings-4aca8edb) | Cogent Communications, Inc. | Operational |  |
| [Parsec](https://dchub.cloud/facilities/parsec-data-management-inc-parsec-c222c087) | Parsec Data Management, Inc | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Montana](https://dchub.cloud/facilities/in/us/montana).

## More on Billings

- [Billings DCPI score](https://dchub.cloud/dcpi/billings)
- [Billings market brief](https://dchub.cloud/markets/billings/brief)
- [Montana data center market brief](https://dchub.cloud/states/montana/brief)
- [Montana data center tax incentives](https://dchub.cloud/states/montana/data-center-incentives)

### Email me when the Billings DCPI verdict changes

Email me when Billings's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Billings market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=billings) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=billings)

JSON: [/api/v1/markets/billings/deep-dive](https://dchub.cloud/api/v1/markets/billings/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Billings","item":"https://dchub.cloud/markets/billings"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Billings Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:42:33.402715+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/billings",
 "wordCount":269,
 "about":{"@type":"Place","name":"Billings"},
 "description":"Live data-center market analysis. DCPI score 36.5/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "billings", "name": "Billings Data Center Market — DC Hub", "description": "Live data-center market measurements for Billings, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/billings", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Billings"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 36.5, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:27."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:27.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:27."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/billings#webpage", "url": "https://dchub.cloud/markets/billings", "name": "Billings data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Billings data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Billings market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Billings data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Billings market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```