# Bethlehem data center market

Power availability in Bethlehem: DCPI verdict AVOID, composite score 19.6 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 252 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Bethlehem data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Bethlehem market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**19.6/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Bethlehem

DC Hub does not hold a lease-rate figure for this market yet.

Bethlehem operates seven tracked facilities under fragmented ownership, with TierPoint controlling three sites and holding two additional registrations under subsidiary entities. The market shows active operator consolidation through affiliated entity registration rather than facility-level scaling. No recent deal activity has been tracked in this market, and facility-level capacity reporting remains sparse across the operator base.

TierPoint's three standalone registrations plus two LLC entities suggest operational presence across multiple sites, though without disclosed facility capacities the precise footprint remains opaque. Colocation America Corporation and TierPoint Pennsylvania Two LLC each operate single tracked locations. That transaction occurred outside Bethlehem's immediate geography but reflects competitive positioning within the Mid-Atlantic corridor.

Regional regulatory activity warrants monitoring: local reporting indicates ongoing municipal review of data center siting regulations and zoning frameworks in nearby Upper Mount Bethel Township and Allentown, suggesting that power and land-use policy remain in flux across the Lehigh Valley.

## Data centers in Bethlehem

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [PDC3 - 3949 Schelden Cir](https://dchub.cloud/facilities/colocation-america-corporation-pdc3-3949-schelden-cir-9161fc83) | Colocation America Corporation | Operational |  |
| [TIERPOINT PENNSYLVANIA TWO LLC](https://dchub.cloud/facilities/tierpoint-pennsylvania-two-llc-e49554cd) | TierPoint |  |  |
| [TierPoint Bethlehem](https://dchub.cloud/facilities/tierpoint-llc-tierpoint-bethlehem-9a90f97b) | TierPoint, LLC | Operational |  |
| [TierPoint Lehigh Valley](https://dchub.cloud/facilities/tierpoint-llc-tierpoint-lehigh-valley-b02c6285) | TierPoint, LLC | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Pennsylvania](https://dchub.cloud/facilities/in/us/pennsylvania).

## More on Bethlehem

- [Bethlehem DCPI score](https://dchub.cloud/dcpi/bethlehem)
- [Bethlehem market brief](https://dchub.cloud/markets/bethlehem/brief)
- [Pennsylvania data center market brief](https://dchub.cloud/states/pennsylvania/brief)
- [Pennsylvania data center tax incentives](https://dchub.cloud/states/pennsylvania/data-center-incentives)

### Email me when the Bethlehem DCPI verdict changes

Email me when Bethlehem's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Bethlehem market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=bethlehem) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=bethlehem)

JSON: [/api/v1/markets/bethlehem/deep-dive](https://dchub.cloud/api/v1/markets/bethlehem/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Bethlehem","item":"https://dchub.cloud/markets/bethlehem"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Bethlehem Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:42:23.383251+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/bethlehem",
 "wordCount":252,
 "about":{"@type":"Place","name":"Bethlehem"},
 "description":"Live data-center market analysis. DCPI score 19.6/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "bethlehem", "name": "Bethlehem Data Center Market — DC Hub", "description": "Live data-center market measurements for Bethlehem, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/bethlehem", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Bethlehem"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 19.6, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:50:14."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:50:14.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:50:14."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/bethlehem#webpage", "url": "https://dchub.cloud/markets/bethlehem", "name": "Bethlehem data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Bethlehem data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Bethlehem market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Bethlehem data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Bethlehem market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```