---
description: Is Beaverton a good data center market for power? DCPI verdict CAUTION, score 47.3/100 (WECC), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Beaverton data centers: power, grid and capacity | DC Hub"
---

# Beaverton data center market

Power availability in Beaverton: DCPI verdict CAUTION, composite score 47.3 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 276 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Beaverton data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Beaverton market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**47.3/100**

MW, all listings**0**any status, unverified listings included

Verdict**CAUTION**

## Colocation lease rates in Beaverton

DC Hub does not hold a lease-rate figure for this market yet.

Beaverton's tracked data center footprint comprises five facilities with Digital Fortress operating two sites and Ziply Fiber maintaining one, reflecting a concentrated operator base in a market where granular capacity data remains limited. No recent deals have been tracked in this market, and the single operator with two facilities suggests limited transaction activity among the tracked base.

This is not a statement about available megawatts in the region, but rather the practical difficulty of routing new power to a site. Operators considering capacity additions should expect extended timelines for power procurement agreements and grid interconnection processes.

The Beaverton market shows no recent transaction activity among its tracked facilities. The concentration of Beaverton's tracked capacity under two Digital Fortress entities and one Ziply Fiber site suggests a fragmented operator landscape. No recent deals tracked in Beaverton itself means current power and supply dynamics are being shaped by incumbent operators' existing infrastructure and utilization patterns rather than new entrants or major consolidation moves.

## Data centers in Beaverton

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Digital Fortress (PTL2)](https://dchub.cloud/facilities/digital-fortress-digital-fortress-ptl2-0afa2843) | Digital Fortress | Operational |  |
| [Digital Fortress - Portland 2](https://dchub.cloud/facilities/digital-fortress-inc-digital-fortress-portland-2-44bb8f01) | Digital Fortress, Inc | Operational |  |
| [Digital Fortress - Portland 3](https://dchub.cloud/facilities/digital-fortress-inc-digital-fortress-portland-3-69cb05d6) | Digital Fortress, Inc | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Oregon](https://dchub.cloud/facilities/in/us/oregon).

## More on Beaverton

- [Beaverton DCPI score](https://dchub.cloud/dcpi/beaverton)
- [Beaverton market brief](https://dchub.cloud/markets/beaverton/brief)
- [Oregon data center market brief](https://dchub.cloud/states/oregon/brief)
- [Oregon data center tax incentives](https://dchub.cloud/states/oregon/data-center-incentives)

### Email me when the Beaverton DCPI verdict changes

Email me when Beaverton's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Beaverton market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=beaverton) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=beaverton)

JSON: [/api/v1/markets/beaverton/deep-dive](https://dchub.cloud/api/v1/markets/beaverton/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Beaverton","item":"https://dchub.cloud/markets/beaverton"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Beaverton Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:41:46.337540+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/beaverton",
 "wordCount":276,
 "about":{"@type":"Place","name":"Beaverton"},
 "description":"Live data-center market analysis. DCPI score 47.3/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "beaverton", "name": "Beaverton Data Center Market — DC Hub", "description": "Live data-center market measurements for Beaverton, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/beaverton", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Beaverton"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 47.3, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:47:38."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:38.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:47:38."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/beaverton#webpage", "url": "https://dchub.cloud/markets/beaverton", "name": "Beaverton data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Beaverton data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Beaverton market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Beaverton data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Beaverton market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
