---
description: Is Baton Rouge a good data center market for power? DCPI verdict CAUTION, score 50.6/100 (MISO), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Baton Rouge data centers: power, grid and capacity | DC Hub"
---

# Baton Rouge data center market

Power availability in Baton Rouge: DCPI verdict CAUTION, composite score 50.6 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 235 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Baton Rouge data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Baton Rouge market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**50.6/100**

MW, all listings**0**any status, unverified listings included

Verdict**CAUTION**

This analysis was written on 2026-11-07, when the Data Center Power Index for this market read 50.4. The index is recomputed through the day and reads 50.6 now — the figure above is the live one, and the narrative below describes the market as it stood when it was written.

## Colocation lease rates in Baton Rouge

DC Hub does not hold a lease-rate figure for this market yet.

The market shows a fragmented operator base with Venyu Btr and DartPoints each running two sites, while no tracked facility has reported megawatt capacity to the DCPI survey. Power procurement visibility remains limited, with operators operating without disclosed capacity benchmarks in DCPI's tracking system.

The DCPI verdict of CAUTION reflects a bifurcated power environment. This combination means operators can source incremental power in the near term, but procurement timelines, grid interconnection requirements, or utility-side bottlenecks will likely extend deal cycles and raise cost uncertainty compared to markets with higher availability scores.

Deal flow into Baton Rouge remains dormant—no recent transactions have been recorded in DCPI tracking. The operator landscape shows consolidation around two commercial entities (Venyu variants account for three registrations; DartPoints variants account for two), but without active M&A or capacity announcements, market momentum is flat. The absence of disclosed deal activity over the tracking window offers no signal about operator growth plans or third-party interest in the region.

How quickly that generation reaches Baton Rouge's grid and whether it improves local interconnection capacity will determine whether the CAUTION verdict shifts.

## Data centers in Baton Rouge

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [DartPoints Baton Rouge, LA - BTR1](https://dchub.cloud/facilities/dartpoints-llc-dartpoints-baton-rouge-la-btr1-116087c8) | DartPoints, LLC | Operational |  |
| [DartPoints Baton Rouge, LA - BTR2](https://dchub.cloud/facilities/dartpoints-llc-dartpoints-baton-rouge-la-btr2-c1448fb6) | DartPoints, LLC | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Louisiana](https://dchub.cloud/facilities/in/us/louisiana).

## More on Baton Rouge

- [Baton Rouge DCPI score](https://dchub.cloud/dcpi/baton-rouge)
- [Baton Rouge market brief](https://dchub.cloud/markets/baton-rouge/brief)
- [Louisiana data center market brief](https://dchub.cloud/states/louisiana/brief)
- [Louisiana data center tax incentives](https://dchub.cloud/states/louisiana/data-center-incentives)

### Email me when the Baton Rouge DCPI verdict changes

Email me when Baton Rouge's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Baton Rouge market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=baton-rouge) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=baton-rouge)

JSON: [/api/v1/markets/baton-rouge/deep-dive](https://dchub.cloud/api/v1/markets/baton-rouge/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Baton Rouge","item":"https://dchub.cloud/markets/baton-rouge"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Baton Rouge Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:41:35.862791+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/baton-rouge",
 "wordCount":235,
 "about":{"@type":"Place","name":"Baton Rouge"},
 "description":"Live data-center market analysis. DCPI score 50.6/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "baton-rouge", "name": "Baton Rouge Data Center Market — DC Hub", "description": "Live data-center market measurements for Baton Rouge, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/baton-rouge", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Baton Rouge"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 50.6, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:48:07."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:07.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:07."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/baton-rouge#webpage", "url": "https://dchub.cloud/markets/baton-rouge", "name": "Baton Rouge data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Baton Rouge data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Baton Rouge market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Baton Rouge data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Baton Rouge market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
