description: Is Batam a good data center market for power? DCPI verdict AVOID, score 27.0/100 (PLN-BATAM), as of 2026-11-12. 450 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Batam data centers: power, grid and capacity | DC Hub"
---

# Batam data center market

Power availability in Batam: DCPI verdict AVOID, composite score 27 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 271 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Batam data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Batam market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**27.0/100**

MW, all listings**450**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Batam

DC Hub does not hold a lease-rate figure for this market yet.

Batam operates six tracked facilities across five major operators, with fragmented ownership preventing consolidated intelligence on total deployed capacity. Batam Internet Exchange, DayOne, PT INFORMASI NUSANTARA TEKNOLOGI, PT Telekomunikasi Indonesia Int, and PT. Internetindo Data Centra Indonesia each operate single facilities in the market. Only one tracked site reports megawatt figures, limiting visibility into aggregate supply posture. The market remains dispersed across small to mid-scale operators rather than dominated by regional hyperscalers.

Together, these readings suggest that securing new power commitments here requires navigating structural supply tightness rather than accessing readily available capacity.

No recent deals have been tracked in Batam's data center market, and operator portfolios show no evidence of M&A activity or portfolio consolidation. The five-operator structure indicates a stable, fragmented landscape without recent reshuffling. Contrasting this against regional consolidation trends—such as the Salim Group's buyout of Keppel's stake in IndoData—Batam's market dynamics remain localized. Deal flow in neighboring and comparable Indonesian markets suggests regional capital remains active, but Batam has not captured tracked transaction volume during the current period.

Strategic announcements regarding Indonesia's AI infrastructure ambitions introduce forward-looking interest in the Batam region, though such statements do not yet translate to executed power-supply agreements or capacity commitments on the ground.

## Data centers in Batam

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [IDC Batam](https://dchub.cloud/facilities/pt-internetindo-data-centra-indonesia-idc-batam-e750ccdb) | PT. Internetindo Data Centra Indonesia | Operational |  |
| [Matrix Data Center BM1 (MDC BM1)](https://dchub.cloud/facilities/pt-nap-info-lintas-nusa-matrix-data-center-bm1-mdc-bm1-617dee48) | PT. NAP Info Lintas Nusa | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Indonesia](https://dchub.cloud/facilities/in/id).

## More on Batam

- [Batam DCPI score](https://dchub.cloud/dcpi/batam)
- [Batam market brief](https://dchub.cloud/markets/batam/brief)
- [Idaho data center market brief](https://dchub.cloud/states/idaho/brief)
- [Idaho data center tax incentives](https://dchub.cloud/states/idaho/data-center-incentives)

### Email me when the Batam DCPI verdict changes

Email me when Batam's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Batam: 450 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=batam) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=batam)

JSON: [/api/v1/markets/batam/deep-dive](https://dchub.cloud/api/v1/markets/batam/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Batam","item":"https://dchub.cloud/markets/batam"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Batam Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:54:14.311973+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/batam",
 "wordCount":271,
 "about":{"@type":"Place","name":"Batam"},
 "description":"Live data-center market analysis. DCPI score 27.0/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "batam", "name": "Batam Data Center Market — DC Hub", "description": "Live data-center market measurements for Batam, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/batam", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Batam"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 450.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 27.0, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:49:09."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:09.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:49:09."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/batam#webpage", "url": "https://dchub.cloud/markets/batam", "name": "Batam data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Batam data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Batam market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Batam data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Batam market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```