# Austin data center market

Power availability in Austin: DCPI verdict CAUTION, composite score 42.8 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 230 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Austin data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Austin market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**42.8/100**

MW, all listings**107**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**CAUTION**

## Austin at a glance

Austin has 107 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Switch (40 MW), Stream Data Centers (35 MW) and Tallgrass Energy (20 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 107 |
| Total listed | 107 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Austin

Broker lease rates (CBRE/JLL): available on paid plans. Asking base rent per kW of critical IT capacity. Electricity is normally billed separately (metered pass-through), plus cross-connects and one-time fees. Signed deals, term and size change the number. Source: CBRE North America Data Center Trends H1 2026 (250+ kW): Austin-San Antonio (combined market) (figure on paid plans) [(link)](https://www.cbre.com/insights/books/north-america-data-center-trends-h1-2026)

Enzu operates the largest footprint with four facilities, followed by CenturyLink Austin and DataBank each with four and three sites respectively. The market has attracted sustained development interest, evidenced by a 1 GW data center project advancing near Austin and a proposed 664-acre data center campus in Taylor, Texas, which municipal authorities are evaluating for annexation and zoning approval.

This combination signals meaningful friction in power procurement pathways.

No recent deals have been tracked in Austin's operator ecosystem. The market shows active development pipelines—a fully-leased Lumen-occupied facility is marketed for sale, and a newly-formed data center supplier is actively searching for Austin real estate—but these activities have not yet generated transaction records. Operator consolidation remains modest; the top three operators control eleven of the tracked facilities, leaving significant portfolio distribution across smaller holders and new entrants.

Power access will remain the primary variable shaping Austin's near-term supply trajectory.

## Data centers in Austin

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Switch AUSTIN](https://dchub.cloud/facilities/switch-switch-austin-2d10cb3e) | Switch | Operational | 40 |
| [Stream Austin](https://dchub.cloud/facilities/stream-data-centers-stream-austin-b199fc5c) | Stream Data Centers | Operational | 35 |
| [Tallgrass Austin DC](https://dchub.cloud/facilities/tallgrass-energy-tallgrass-austin-dc-57c35e07) | Tallgrass Energy | Operational | 20 |
| [LightEdge Austin](https://dchub.cloud/facilities/lightedge-lightedge-austin-f76522f1) | LightEdge | Operational | 12 |
| [Alpheus Austin (1905 E. 6th Street)](https://dchub.cloud/facilities/alpheus-communications-alpheus-austin-1905-e-6th-street-1aed32ff) | Alpheus Communications | Operational |  |
| [CyrusOne Austin (Met 3)](https://dchub.cloud/facilities/cyrusone-inc-cyrusone-austin-met-3-889ec76f) | CyrusOne Inc. | Operational |  |
| [CyrusOne Austin TX](https://dchub.cloud/facilities/cyrusone-cyrusone-austin-tx-510887bb) | CyrusOne | Operational |  |
| [Digital Realty AUS11 - Austin](https://dchub.cloud/facilities/digital-realty-digital-realty-aus-7500-metro-center-dr-2a689710) | Digital Realty | Operational |  |
| [Element Critical](https://dchub.cloud/facilities/element-critical-element-critical-2a4a9428) |  | Operational |  |
| [Flexential Austin TX](https://dchub.cloud/facilities/flexential-flexential-austin-tx-da0c313f) | Flexential | Operational |  |
| [Level(3) Austin (Kramer)](https://dchub.cloud/facilities/lumen-technologies-level3-austin-kramer-a8a17efc) | Lumen Technologies | Operational |  |
| [LightEdge Austin 1 (AUS1)](https://dchub.cloud/facilities/lightedge-solutions-lightedge-austin-1-aus1-c5c629ca) | LightEdge Solutions | Operational |  |
| [Thin-nology](https://dchub.cloud/facilities/thin-nology-thin-nology-cd9626cf) |  | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Texas](https://dchub.cloud/facilities/in/us/texas).

## More on Austin

- [Austin DCPI score](https://dchub.cloud/dcpi/austin)
- [Austin market brief](https://dchub.cloud/markets/austin/brief)
- [Texas data center market brief](https://dchub.cloud/states/texas/brief)
- [Texas data center tax incentives](https://dchub.cloud/states/texas/data-center-incentives)

### Email me when the Austin DCPI verdict changes

Email me when Austin's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Austin: 107 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=austin) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=austin)

JSON: [/api/v1/markets/austin/deep-dive](https://dchub.cloud/api/v1/markets/austin/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Austin","item":"https://dchub.cloud/markets/austin"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Austin Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:40:56.212875+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/austin",
 "wordCount":230,
 "about":{"@type":"Place","name":"Austin"},
 "description":"Live data-center market analysis. DCPI score 42.8/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "austin", "name": "Austin Data Center Market — DC Hub", "description": "Live data-center market measurements for Austin, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/austin", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Austin"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 107.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 42.8, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:45:25."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:25.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:25."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/austin#webpage", "url": "https://dchub.cloud/markets/austin", "name": "Austin data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Austin data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Austin market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Austin data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Austin market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```