description: Is Aurora a good data center market for power? DCPI verdict AVOID, score 19.4/100 (PJM), as of 2026-11-12. 165 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Aurora data centers: power, grid and capacity | DC Hub"
---

# Aurora data center market

Power availability in Aurora: DCPI verdict AVOID, composite score 19.4 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 256 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Aurora data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Aurora market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**19.4/100**

MW, all listings**165**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Aurora at a glance

Aurora has 30 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are CME Group (30 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 30 |
| Total listed | 30 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Aurora

DC Hub does not hold a lease-rate figure for this market yet.

CyrusOne dominates operator presence with nine tracked listings in the market. Regional context includes ongoing municipal scrutiny—Aurora's city council has moved to establish new data center restrictions and actively solicited resident feedback on facility development, signaling heightened governance around expansion.

This pairing means that incremental megawatts will require either substantial infrastructure upgrades to the local grid or long-term power agreements secured well ahead of project commissioning. Operators and developers should expect extended timelines for power tie-in approvals and potentially higher costs to underwrite grid reinforcement.

No recent deals have been tracked in Aurora, leaving operator dynamics static. A parallel Illinois market, Oak Brook, shows similarly dormant deal activity, suggesting that capital and development momentum across Illinois data center markets may be concentrated elsewhere. The absence of transaction data does not indicate demand weakness; rather, it reflects a market in a holding pattern pending power infrastructure resolution.

Public debate over zoning and resident concerns around data center noise and utility costs will likely shape the pace at which new power infrastructure can be planned and permitted in Aurora.

## Data centers in Aurora

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [CME Group Data Center](https://dchub.cloud/facilities/cme-group-cme-group-data-center-2520bac1) | CME Group | Operational | 30 |
| [Aurora, IL, CHI1-CHI3](https://dchub.cloud/facilities/cyrusone-aurora-il-chi1-chi3-394b33b6) | CyrusOne | Operational |  |
| [CyrusOne Aurora I](https://dchub.cloud/facilities/cyrusone-inc-cyrusone-aurora-i-a8d48af8) | CyrusOne Inc. | Operational |  |
| [CyrusOne Chicago Aurora CME](https://dchub.cloud/facilities/cyrusone-cyrusone-chicago-aurora-cme-c212f899) | CyrusOne | Operational |  |
| [DataBridge Sites Aurora](https://dchub.cloud/facilities/databridge-sites-databridge-sites-aurora-c14f9d03) | DataBridge Sites | Operational |  |
| [Edged Chicago ORD01](https://dchub.cloud/facilities/edged-edged-chicago-ord01-c1632cfe) | Edged | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Illinois](https://dchub.cloud/facilities/in/us/illinois).

## More on Aurora

- [Aurora DCPI score](https://dchub.cloud/dcpi/aurora)
- [Aurora market brief](https://dchub.cloud/markets/aurora/brief)
- [Illinois data center market brief](https://dchub.cloud/states/illinois/brief)
- [Illinois data center tax incentives](https://dchub.cloud/states/illinois/data-center-incentives)

### Email me when the Aurora DCPI verdict changes

Email me when Aurora's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Aurora: 165 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=aurora) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=aurora)

JSON: [/api/v1/markets/aurora/deep-dive](https://dchub.cloud/api/v1/markets/aurora/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Aurora","item":"https://dchub.cloud/markets/aurora"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Aurora Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:40:38.889493+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/aurora",
 "wordCount":256,
 "about":{"@type":"Place","name":"Aurora"},
 "description":"Live data-center market analysis. DCPI score 19.4/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "aurora", "name": "Aurora Data Center Market — DC Hub", "description": "Live data-center market measurements for Aurora, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/aurora", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Aurora"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 165.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 19.4, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:45:56."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:56.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:56."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/aurora#webpage", "url": "https://dchub.cloud/markets/aurora", "name": "Aurora data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Aurora data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Aurora market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Aurora data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Aurora market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```