Power availability in Aurora, CO: DCPI verdict CAUTION, composite score 54.9 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 275 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Aurora, CO data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Aurora, CO market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**54.9/100**

MW, all listings**165**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**CAUTION**

## Colocation lease rates in Aurora, CO

DC Hub does not hold a lease-rate figure for this market yet.

Power reporting remains sparse—only one tracked site discloses megawatt capacity—limiting visibility into aggregate demand and utilization patterns across the market. Municipal regulatory activity has intensified, with Aurora's city council advancing new data center restrictions and regulations following resident concerns, a policy environment that will shape future development timelines and interconnection pathways.

This split suggests that new power availability exists upstream but faces non-trivial barriers in the final-mile transmission and distribution phase. Operators seeking new supply should anticipate extended interconnection lead times and potential augmentation requirements at the local feeder level, even where wholesale power markets appear accessible.

No recent deals have been tracked in Aurora's data center market, leaving current operator expansion intentions opaque. Without deal flow, operator growth trajectories and power procurement strategies remain unclear. Denver-area developer activity has been flagged in public reporting around new Aurora projects, but formal deal announcements have not yet materialized in tracked channels.

## Data centers in Aurora, CO

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Flexential - Denver/Aurora (DEN03)](https://dchub.cloud/facilities/flexential-corp-flexential-denveraurora-den03-46c418dd) | Flexential Corp. | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Colorado](https://dchub.cloud/facilities/in/us/colorado).

## More on Aurora, CO

- [Aurora, CO DCPI score](https://dchub.cloud/dcpi/aurora-co)
- [Aurora, CO market brief](https://dchub.cloud/markets/aurora-co/brief)
- [Colorado data center market brief](https://dchub.cloud/states/colorado/brief)
- [Colorado data center tax incentives](https://dchub.cloud/states/colorado/data-center-incentives)

### Email me when the Aurora, CO DCPI verdict changes

Email me when Aurora, CO's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Aurora, CO: 165 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=aurora-co) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=aurora-co)

JSON: [/api/v1/markets/aurora-co/deep-dive](https://dchub.cloud/api/v1/markets/aurora-co/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Aurora Co","item":"https://dchub.cloud/markets/aurora-co"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Aurora, CO Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:36:58.729933+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/aurora-co",
 "wordCount":275,
 "about":{"@type":"Place","name":"Aurora, CO"},
 "description":"Live data-center market analysis. DCPI score 54.9/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "aurora-co", "name": "Aurora, CO Data Center Market — DC Hub", "description": "Live data-center market measurements for Aurora, CO, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/aurora-co", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Aurora, CO"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 165.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 54.9, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:46:38."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:38.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:38."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/aurora-co#webpage", "url": "https://dchub.cloud/markets/aurora-co", "name": "Aurora, CO data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Aurora, CO data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Aurora, CO market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Aurora, CO data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Aurora, CO market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```