---
description: Is Athens a good data center market for power? DCPI verdict AVOID, score 17.7/100 (ENTSOE-GR), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Athens data centers: power, grid and capacity | DC Hub"
---

# Athens data center market

Power availability in Athens: DCPI verdict AVOID, composite score 17.7 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 231 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Athens data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Athens market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**17.7/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Athens

DC Hub does not hold a lease-rate figure for this market yet.

The market shows fragmentation typical of secondary European hubs, though individual site capacity data remains limited to operator-level reporting.

The DCPI verdict signals structural headwinds on power procurement. This combination means that operators seeking to add load or new customers will face elevated costs and extended procurement timelines to secure incremental capacity from the local grid.

Deal flow has stalled: zero transactions tracked in the recent window. Among the five operators present, Digital Reality maintains a single facility footprint, as do Cloudrock, both Lamda Hellix entities, and AWS. No acquisition, lease, expansion or investment announcements have surfaced. Operator diversity—no single player controls more than one tracked site—indicates competitive fragmentation without clear leadership in capacity or technology roadmap.

## Data centers in Athens

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [AWS Europe (Greece)](https://dchub.cloud/facilities/amazon-web-services-aws-europe-greece-8bf59cfe) | Amazon Web Services | Planned |  |
| [Azure Greece Central Athens](https://dchub.cloud/facilities/microsoft-azure-greece-central-athens-f3ecd88e) | Microsoft | Operational |  |
| [Synapsecom SNC-2 Athens](https://dchub.cloud/facilities/synapsecom-telecoms-sa-synapsecom-snc-2-athens-8c2a06f5) | Synapsecom Telecoms S.A. | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Greece](https://dchub.cloud/facilities/in/gr).

## More on Athens

- [Athens DCPI score](https://dchub.cloud/dcpi/athens)
- [Athens market brief](https://dchub.cloud/markets/athens/brief)

### Email me when the Athens DCPI verdict changes

Email me when Athens's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Athens market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=athens) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=athens)

JSON: [/api/v1/markets/athens/deep-dive](https://dchub.cloud/api/v1/markets/athens/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Athens","item":"https://dchub.cloud/markets/athens"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Athens Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:37:34.925364+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/athens",
 "wordCount":231,
 "about":{"@type":"Place","name":"Athens"},
 "description":"Live data-center market analysis. DCPI score 17.7/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "athens", "name": "Athens Data Center Market — DC Hub", "description": "Live data-center market measurements for Athens, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/athens", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Athens"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 17.7, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:48:54."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:54.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:54."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/athens#webpage", "url": "https://dchub.cloud/markets/athens", "name": "Athens data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Athens data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Athens market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Athens data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Athens market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
