description: Is Altoona a good data center market for power? DCPI verdict AVOID, score 32.1/100 (MISO), as of 2026-11-12. 500 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Altoona data centers: power, grid and capacity | DC Hub"
---

# Altoona data center market

Power availability in Altoona: DCPI verdict AVOID, composite score 32.1 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 246 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Altoona data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Altoona market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**32.1/100**

MW, all listings**500**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Altoona at a glance

Altoona has 500 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Meta (500 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 500 |
| Total listed | 500 |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Altoona

DC Hub does not hold a lease-rate figure for this market yet.

The market shows a dispersed operator base beyond its largest tenant, though consolidation remains limited to a handful of providers.

Utilities and grid operators in Altoona can support additional load, but not without planning overhead and infrastructure coordination. Sites seeking to expand or new entrants planning greenfield builds should expect longer lead times for power agreements and potential interim capacity limitations during ramp phases.

No recent deals are tracked in Altoona, a pattern consistent with the broader Iowa data center corridor where deal flow has remained sparse despite active market development elsewhere. LightEdge's known expansion interest outside Des Moines—including projects in Boone and surrounding regions—underscores regional appetite for new capacity, yet Altoona has not surfaced as a transaction node. The absence of third-party acquisition or investment announcements does not indicate stagnation; it reflects how the market's supply is shaped by vertically integrated operators building to serve their own infrastructure needs.

Power availability will remain the primary variable shaping facility planning decisions in Altoona over the next 12–24 months.

## Data centers in Altoona

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Facebook Altoona Data Center 1](https://dchub.cloud/facilities/meta-facebook-altoona-data-center-1-ab8673ba) | Meta | Operational | 100 |
| [Facebook Altoona Data Center 2](https://dchub.cloud/facilities/meta-facebook-altoona-data-center-2-b3050ab9) | Meta | Operational | 100 |
| [Facebook Altoona Data Center 3](https://dchub.cloud/facilities/meta-facebook-altoona-data-center-3-ded5d6ad) | Meta | Operational | 100 |
| [Facebook Altoona Data Center 4](https://dchub.cloud/facilities/meta-facebook-altoona-data-center-4-9d32d2fe) | Meta | Operational | 100 |
| [Facebook Altoona Data Center 5](https://dchub.cloud/facilities/meta-facebook-altoona-data-center-5-575d558e) | Meta | Operational | 100 |
| [Altoona Meta Data Center](https://dchub.cloud/facilities/meta-altoona-meta-data-center-34e6130e) | Meta | Operational |  |
| [LightEdge Des Moines 1 (DSM1)](https://dchub.cloud/facilities/lightedge-solutions-lightedge-des-moines-1-dsm1-c8849d03) | LightEdge Solutions | Operational |  |
| [LightEdge Des Moines 2 (DSM2)](https://dchub.cloud/facilities/lightedge-solutions-lightedge-des-moines-2-dsm2-acdef6b7) | LightEdge Solutions | Operational |  |
| [Lightedge Des Moines 2](https://dchub.cloud/facilities/lightedge-des-moines-2-lightedge-des-moines-2-cc8bce14) |  | Operational |  |
| [Meta](https://dchub.cloud/facilities/meta-meta-87096557) |  | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Iowa](https://dchub.cloud/facilities/in/us/iowa).

## More on Altoona

- [Altoona DCPI score](https://dchub.cloud/dcpi/altoona)
- [Altoona market brief](https://dchub.cloud/markets/altoona/brief)
- [Iowa data center market brief](https://dchub.cloud/states/iowa/brief)
- [Iowa data center tax incentives](https://dchub.cloud/states/iowa/data-center-incentives)

### Email me when the Altoona DCPI verdict changes

Email me when Altoona's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Altoona: 500 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=altoona) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=altoona)

JSON: [/api/v1/markets/altoona/deep-dive](https://dchub.cloud/api/v1/markets/altoona/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Altoona","item":"https://dchub.cloud/markets/altoona"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Altoona Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:36:50.819895+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/altoona",
 "wordCount":246,
 "about":{"@type":"Place","name":"Altoona"},
 "description":"Live data-center market analysis. DCPI score 32.1/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "altoona", "name": "Altoona Data Center Market — DC Hub", "description": "Live data-center market measurements for Altoona, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/altoona", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Altoona"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 500.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 32.1, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:46:18."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:18.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:18."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/altoona#webpage", "url": "https://dchub.cloud/markets/altoona", "name": "Altoona data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Altoona data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Altoona market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Altoona data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Altoona market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```