---
description: Is Alpharetta a good data center market for power? DCPI verdict AVOID, score 23.5/100 (SOCO), as of 2026-11-12. 4 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Alpharetta data centers: power, grid and capacity | DC Hub"
---

# Alpharetta data center market

Power availability in Alpharetta: DCPI verdict AVOID, composite score 23.5 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 287 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Alpharetta data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Alpharetta market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**23.5/100**

MW, all listings**4**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Alpharetta

DC Hub does not hold a lease-rate figure for this market yet.

Flexential operates two sites, while Ascent and Carrier Connect each hold single facilities. The market shows low deal velocity; no recent transactions have been recorded in the tracking window. Carrier Connect leases a 4 MW facility—a converted former GE property held by Mapletree—which the operator secured immediately upon site takeover, signaling rapid tenant placement but not market expansion.

Together, these scores indicate that new colocation, lease or build projects will face headwinds acquiring dedicated power allocations.

Operator landscape remains thin. Flexential's two-facility footprint and Carrier Connect's recent single-facility lease represent the only named activity. The absence of megawatt-scale deals or multi-site operator expansion suggests Alpharetta remains a secondary market in the regional Atlanta hierarchy. The regional context shows that larger-scale development—such as gigawatt-class projects—has been withdrawn in favor of alternative uses, and peer markets like Douglasville (270 MW across 11 sites) command more concentrated operator attention and deal flow.

Power availability will continue to define project feasibility in Alpharetta through 2026 and beyond.

## Data centers in Alpharetta

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [365 Data Centers Alpharetta (GA1)](https://dchub.cloud/facilities/365-data-centers-365-data-centers-alpharetta-ga1-9fbaf04f) | 365 Data Centers | Operational |  |
| [Ascent - Atlanta Data Center](https://dchub.cloud/facilities/ascent-ascent-atlanta-data-center-fdbfde18) | Ascent | Operational |  |
| [Cox Data Center](https://dchub.cloud/facilities/cox-data-center-dc6571fd) |  | Operational |  |
| [Flexential - Atlanta/Alpharetta (ATL3/4)](https://dchub.cloud/facilities/flexential-corp-flexential-atlantaalpharetta-atl34-2fbec43a) | Flexential Corp. | Operational |  |
| [Flexential Atlanta - Alpharetta Data Center](https://dchub.cloud/facilities/flexential-flexential-atlanta-alpharetta-data-center-e1fbc7a3) | Flexential | Operational |  |
| [Hewlett-Packard](https://dchub.cloud/facilities/hewlett-packard-hewlett-packard-6ddd2eed) |  | Operational |  |
| [Mapletree Industrial](https://dchub.cloud/facilities/unknown-mapletree-industrial-dc0d59c9) |  | Operational |  |
| [Secure Data Center](https://dchub.cloud/facilities/secure-data-center-54d800d0) |  | Operational |  |
| [Strategic Datasphere](https://dchub.cloud/facilities/unknown-strategic-datasphere-76503178) |  | Operational |  |
| [T5 Data Center](https://dchub.cloud/facilities/t5-data-center-2a5d8f09) |  | Operational |  |
| [UPS Data Center](https://dchub.cloud/facilities/ups-data-center-4c4c7a44) |  | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Georgia](https://dchub.cloud/facilities/in/us/georgia).

## More on Alpharetta

- [Alpharetta DCPI score](https://dchub.cloud/dcpi/alpharetta)
- [Alpharetta market brief](https://dchub.cloud/markets/alpharetta/brief)
- [Georgia data center market brief](https://dchub.cloud/states/georgia/brief)
- [Georgia data center tax incentives](https://dchub.cloud/states/georgia/data-center-incentives)

### Email me when the Alpharetta DCPI verdict changes

Email me when Alpharetta's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Alpharetta: 4 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=alpharetta) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=alpharetta)

JSON: [/api/v1/markets/alpharetta/deep-dive](https://dchub.cloud/api/v1/markets/alpharetta/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Alpharetta","item":"https://dchub.cloud/markets/alpharetta"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Alpharetta Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:36:43.866343+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/alpharetta",
 "wordCount":287,
 "about":{"@type":"Place","name":"Alpharetta"},
 "description":"Live data-center market analysis. DCPI score 23.5/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "alpharetta", "name": "Alpharetta Data Center Market — DC Hub", "description": "Live data-center market measurements for Alpharetta, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/alpharetta", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Alpharetta"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 4.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 23.5, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:46:03."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:03.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:03."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/alpharetta#webpage", "url": "https://dchub.cloud/markets/alpharetta", "name": "Alpharetta data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Alpharetta data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Alpharetta market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Alpharetta data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Alpharetta market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
