---
description: Is Allen a good data center market for power? DCPI verdict CAUTION, score 43.4/100 (ERCOT), as of 2026-11-12. 156 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Allen data centers: power, grid and capacity | DC Hub"
---

# Allen data center market

Power availability in Allen: DCPI verdict CAUTION, composite score 43.4 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 234 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Allen data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Allen market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**43.4/100**

MW, all listings**156**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**CAUTION**

## Allen at a glance

Allen has 96 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Compass (96 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Under construction | 96 |
| Total listed | 96 |

## Developers building or planning in Allen

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| Compass | 96 |  |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Allen

DC Hub does not hold a lease-rate figure for this market yet.

The market is fragmented beyond its top three operators—CyrusOne, Centersquare, and TierPoint each holding two to five properties—suggesting no single player dominates local supply dynamics. No recent deal activity has been tracked in Allen, leaving the operational and ownership structure largely static.

The DCPI verdict of CAUTION reflects a mixed signal on new power availability. This pairing suggests that while some power may technically be available, sourcing, routing, or grid-level limitations present real friction for projects planning significant load additions. Developers evaluating new sites or expansions should anticipate power procurement challenges that go beyond simple capacity availability.

Deal flow in Allen remains dormant with no recent transactions recorded. Allen's quiet deal environment may reflect local operator satisfaction with current portfolios, limited portfolio availability for sale, or simply lower acquisition priority relative to greenfield development or higher-profile markets. The persistence of fragmented ownership among smaller to mid-sized operators suggests no consolidation wave is currently reshaping the market.

## Data centers in Allen

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Compass Allen TX-1](https://dchub.cloud/facilities/compass-compass-allen-tx-1-fd599ab6) | Compass | Under Construction | 96 |
| [Allen, TX, DFW3-DFW5](https://dchub.cloud/facilities/cyrusone-allen-tx-dfw3-dfw5-3ee23849) | CyrusOne | Operational |  |
| [Centersquare Dallas (DFW2)](https://dchub.cloud/facilities/centersquare-centersquare-dallas-dfw2-d5a3f227) | Centersquare | Operational |  |
| [Cisco Allen](https://dchub.cloud/facilities/cisco-allen-cisco-allen-ace068eb) |  | Operational |  |
| [Evoque Allen DA1](https://dchub.cloud/facilities/centersquare-evoque-allen-da1-256a52dd) | Centersquare | Operational |  |
| [Experian McKinney Data Center](https://dchub.cloud/facilities/experian-mckinney-data-center-d2db118a) |  | Operational |  |
| [ScaleMatrix Dallas Data Center US-South 01](https://dchub.cloud/facilities/scalematrix-holdings-inc-scalematrix-dallas-data-center-us-south-01-4aa58e4f) | ScaleMatrix Holdings, Inc. | Operational |  |
| [Tierpoint Dallas-Allen](https://dchub.cloud/facilities/tierpoint-tierpoint-dallas-allen-206dd41c) | TierPoint | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Texas](https://dchub.cloud/facilities/in/us/texas).

## More on Allen

- [Allen DCPI score](https://dchub.cloud/dcpi/allen)
- [Allen market brief](https://dchub.cloud/markets/allen/brief)
- [Texas data center market brief](https://dchub.cloud/states/texas/brief)
- [Texas data center tax incentives](https://dchub.cloud/states/texas/data-center-incentives)

### Email me when the Allen DCPI verdict changes

Email me when Allen's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Allen: 156 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=allen) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=allen)

JSON: [/api/v1/markets/allen/deep-dive](https://dchub.cloud/api/v1/markets/allen/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Allen","item":"https://dchub.cloud/markets/allen"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Allen Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:36:36.366913+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/allen",
 "wordCount":234,
 "about":{"@type":"Place","name":"Allen"},
 "description":"Live data-center market analysis. DCPI score 43.4/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "allen", "name": "Allen Data Center Market — DC Hub", "description": "Live data-center market measurements for Allen, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/allen", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Allen"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 156.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 43.4, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:45:51."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:51.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:45:51."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/allen#webpage", "url": "https://dchub.cloud/markets/allen", "name": "Allen data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Allen data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Allen market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Allen data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Allen market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
