---
description: Is Aldie a good data center market for power? DCPI verdict AVOID, score 22.4/100 (PJM), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Aldie data centers: power, grid and capacity | DC Hub"
---

# Aldie data center market

Power availability in Aldie: DCPI verdict AVOID, composite score 22.4 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 260 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Aldie data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Aldie market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**22.4/100**

MW, all listings**0**any status, unverified listings included

Verdict**AVOID**

## Colocation lease rates in Aldie

DC Hub does not hold a lease-rate figure for this market yet.

Aldie hosts eight tracked facilities dominated by AWS and Microsoft assets. AWS operates four sites in the market, while Microsoft maintains dual presence through both corporate operations and the Blue Ridge data center complex (facilities IAD11, IAD12, IAD13). A single independent operator, Yondr Data Center, rounds out the tracked footprint. No recent deal activity has been recorded in Aldie's tracked transaction history.

Together these metrics reflect a market where adding incremental load faces material supply-side headwinds. New entrants or expansion plans should model extended procurement timelines and higher interconnection costs as baseline assumptions rather than edge cases.

Operator composition tilts heavily toward hyperscalers. No tracked deals in the recent window means the market is not currently signaling visible M&A, lease, or acquisition activity at the tracked level.

Aldie's power and supply outlook will remain contingent on regional grid investment and utility capacity planning in Northern Virginia—factors that operate on multi-year cycles and lie outside individual market dynamics.

## Data centers in Aldie

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [MICROSOFT BLUE RIDGE (IAD11-12-13) DATA CENTER](https://dchub.cloud/facilities/microsoft-blue-ridge-iad11-12-13-data-center-07fb21ef) | Microsoft |  |  |
| [YONDR DATA CENTER](https://dchub.cloud/facilities/yondr-data-center-0a9154f1) |  |  |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Virginia](https://dchub.cloud/facilities/in/us/virginia).

## More on Aldie

- [Aldie DCPI score](https://dchub.cloud/dcpi/aldie)
- [Aldie market brief](https://dchub.cloud/markets/aldie/brief)
- [Virginia data center market brief](https://dchub.cloud/states/virginia/brief)
- [Virginia data center tax incentives](https://dchub.cloud/states/virginia/data-center-incentives)

### Email me when the Aldie DCPI verdict changes

Email me when Aldie's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Aldie market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=aldie) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=aldie)

JSON: [/api/v1/markets/aldie/deep-dive](https://dchub.cloud/api/v1/markets/aldie/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Aldie","item":"https://dchub.cloud/markets/aldie"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Aldie Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:31:00.761493+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/aldie",
 "wordCount":260,
 "about":{"@type":"Place","name":"Aldie"},
 "description":"Live data-center market analysis. DCPI score 22.4/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "aldie", "name": "Aldie Data Center Market — DC Hub", "description": "Live data-center market measurements for Aldie, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/aldie", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Aldie"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 22.4, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:32:11."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "AVOID", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:32:11.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:32:11."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/aldie#webpage", "url": "https://dchub.cloud/markets/aldie", "name": "Aldie data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Aldie data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Aldie market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Aldie data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Aldie market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
