---
description: Is Albuquerque a good data center market for power? DCPI verdict CAUTION, score 53.1/100 (WECC), as of 2026-11-12. Grid, queue and deal context for 300+ markets.
title: "Albuquerque data centers: power, grid and capacity | DC Hub"
---

# Albuquerque data center market

Power availability in Albuquerque: DCPI verdict CAUTION, composite score 53.1 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 277 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Albuquerque data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Albuquerque market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**53.1/100**

MW, all listings**0**any status, unverified listings included

Verdict**CAUTION**

## Colocation lease rates in Albuquerque

DC Hub does not hold a lease-rate figure for this market yet.

The Albuquerque Public Schools Data Center, Bigbyte.cc Albuquerque, CNM Westside Data Center, and 725 constitute the known operator base. The market currently lacks sufficient granular capacity reporting—only one site has submitted megawatt data to the registry—making precise footprint assessment impossible at this time.

This combination means new power procurement here faces real obstacles in interconnection, transmission, or contractual availability despite theoretical supply existing in the region. Operators evaluating new capacity additions should expect extended timelines for power agreements and possible cost pressure from scarcity in available delivery pathways.

No recent transactions have been tracked in the Albuquerque registry, leaving deal flow and operator expansion intentions opaque. The four identified operators—spanning public education infrastructure, commercial colocation, community college facilities, and the standalone 725 entity—suggest a fragmented market structure without dominant hyperscale or third-party platforms driving consolidation or large-scale build-out activity. Without recent deal data, current operator appetite for capacity growth, site acquisition, or power hedging cannot be inferred.

## Data centers in Albuquerque

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [123 Central](https://dchub.cloud/facilities/bigbytecc-123-central-d74701ed) | bigbyte.cc | Operational |  |
| [505 Marquette -- Lobo Internet](https://dchub.cloud/facilities/lobo-internet-services-ltd-505-marquette-lobo-internet-0635b005) | Lobo Internet Services, Ltd | Operational |  |
| [CNM WESTSIDE DATA CENTER](https://dchub.cloud/facilities/cnm-westside-data-center-1745c99e) |  |  |  |
| [Centersquare Albuquerque (ABQ1)](https://dchub.cloud/facilities/centersquare-centersquare-albuquerque-abq1-fa573384) | Centersquare | Operational |  |
| [H5 Data Centers Albuquerque](https://dchub.cloud/facilities/h5-data-centers-h5-data-centers-albuquerque-1fec6c50) | H5 Data Centers | Operational |  |
| [HPC](https://dchub.cloud/facilities/sandia-national-laboratories-hpc-1e72746b) | Sandia National Laboratories | Operational |  |
| [Molina Healthcare](https://dchub.cloud/facilities/molina-healthcare-molina-healthcare-f933c3c5) |  | Operational |  |
| [Oso Grande](https://dchub.cloud/facilities/oso-grande-oso-grande-7c55615e) |  | Operational |  |
| [Oso Grande Technologies](https://dchub.cloud/facilities/oso-grande-technologies-inc-oso-grande-technologies-c413d162) | Oso Grande Technologies, Inc. | Operational |  |
| [ServerCondo-219 Albuquerque](https://dchub.cloud/facilities/ixnm-inc-servercondo-219-albuquerque-8f84ef9c) | IXNM, INC. | Operational |  |
| [Southwest Cyberport](https://dchub.cloud/facilities/southwest-cyberport-southwest-cyberport-cbb7e77f) |  | Operational |  |
| [Southwest Cyberport Albuquerque](https://dchub.cloud/facilities/southwest-cyberport-inc-southwest-cyberport-albuquerque-0900eb16) | Southwest Cyberport, Inc. | Operational |  |
| [UNM Data Center](https://dchub.cloud/facilities/unm-unm-data-center-606beb1b) | UNM | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [New Mexico](https://dchub.cloud/facilities/in/us/new-mexico).

## More on Albuquerque

- [Albuquerque DCPI score](https://dchub.cloud/dcpi/albuquerque)
- [Albuquerque market brief](https://dchub.cloud/markets/albuquerque/brief)
- [New Mexico data center market brief](https://dchub.cloud/states/new-mexico/brief)
- [New Mexico data center tax incentives](https://dchub.cloud/states/new-mexico/data-center-incentives)

### Email me when the Albuquerque DCPI verdict changes

Email me when Albuquerque's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Albuquerque market data is live in DC Hub — cited and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=albuquerque) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=albuquerque)

JSON: [/api/v1/markets/albuquerque/deep-dive](https://dchub.cloud/api/v1/markets/albuquerque/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Albuquerque","item":"https://dchub.cloud/markets/albuquerque"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Albuquerque Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:36:28.049819+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/albuquerque",
 "wordCount":277,
 "about":{"@type":"Place","name":"Albuquerque"},
 "description":"Live data-center market analysis. DCPI score 53.1/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "albuquerque", "name": "Albuquerque Data Center Market — DC Hub", "description": "Live data-center market measurements for Albuquerque, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/albuquerque", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Albuquerque"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 0.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 53.1, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:48:02."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:02.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:48:02."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/albuquerque#webpage", "url": "https://dchub.cloud/markets/albuquerque", "name": "Albuquerque data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Albuquerque data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Albuquerque market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Albuquerque data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Albuquerque market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```
