# Albany data center market

Power availability in Albany: DCPI verdict CAUTION, composite score 48.5 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 274 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Albany data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Albany market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**48.5/100**

MW, all listings**6,100**sum of the sites that report MW; most do notany status, unverified listings included

Verdict**CAUTION**

## Albany at a glance

Albany has 1,400 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Vantage Data Centers (1,400 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Under construction | 1,400 |
| Total listed | 1,400 |

## Developers building or planning in Albany

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| Vantage Data Centers | 1,400 |  |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Albany

DC Hub does not hold a lease-rate figure for this market yet.

Vantage leads with four locations, followed by INOC, LLC with three sites. The market has not recorded recent deal activity in the tracked dataset.

The DCPI verdict of CAUTION reflects tension between these two forces. This is not a market where power flows freely to new entrants; it is one where available supply exists but requires deliberate infrastructure work to reach it.

Operator concentration is evident. Vantage's four-site footprint represents the single largest presence, while INOC, LLC's three locations and smaller holdings by Firstlight Albany and IBM Building round out the tracked base. The absence of recent deals in the dataset does not indicate market stagnation—it reflects the current state of recorded transaction activity. Regional interest in Albany has been documented: the proposed Kenwood Commons facility drew community attention, and the broader Northeast has seen acquisitions and capital moves by large platforms, though these do not appear in Albany's own deal log.

Forward momentum depends on whether operators can route incremental power capacity to their sites within timeframes that match project schedules.

## Data centers in Albany

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Vantage Frontier Campus](https://dchub.cloud/facilities/vantage-data-centers-vantage-frontier-campus-15f3d87f) | Vantage Data Centers | Under Construction | 1,400 |
| [IBM Building](https://dchub.cloud/facilities/ibm-building-ibm-building-51adcf84) |  | Operational |  |
| [INOC Albany (4 Tower Pl)](https://dchub.cloud/facilities/inoc-llc-inoc-albany-4-tower-pl-7d6e4db3) | INOC, LLC | Operational |  |
| [Lumen Albany 4](https://dchub.cloud/facilities/lumen-technologies-lumen-albany-4-03c619eb) | Lumen Technologies | Operational |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [New York](https://dchub.cloud/facilities/in/us/new-york).

## More on Albany

- [Albany DCPI score](https://dchub.cloud/dcpi/albany)
- [Albany market brief](https://dchub.cloud/markets/albany/brief)
- [New York data center market brief](https://dchub.cloud/states/new-york/brief)
- [New York data center tax incentives](https://dchub.cloud/states/new-york/data-center-incentives)

### Email me when the Albany DCPI verdict changes

Email me when Albany's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Albany: 6,100 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=albany) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=albany)

JSON: [/api/v1/markets/albany/deep-dive](https://dchub.cloud/api/v1/markets/albany/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Albany","item":"https://dchub.cloud/markets/albany"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Albany Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:36:20.452113+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/albany",
 "wordCount":274,
 "about":{"@type":"Place","name":"Albany"},
 "description":"Live data-center market analysis. DCPI score 48.5/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "albany", "name": "Albany Data Center Market — DC Hub", "description": "Live data-center market measurements for Albany, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/albany", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Albany"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 6100.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 48.5, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:46:41."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:41.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:46:41."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/albany#webpage", "url": "https://dchub.cloud/markets/albany", "name": "Albany data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Albany data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Albany market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Albany data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Albany market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```