description: Is Abilene a good data center market for power? DCPI verdict CAUTION, score 42.7/100 (ERCOT), as of 2026-11-12. 1,950 MW tracked across all listings, unverified included (as of 2026-11-07). Grid, queue and deal context for 300+ markets.
title: "Abilene data centers: power, grid and capacity | DC Hub"
---

# Abilene data center market

Power availability in Abilene: DCPI verdict CAUTION, composite score 42.7 of 100, as of 2026-11-12. Source: DC Hub.

Data Center Market Deep-Dive · 199 words · generated 2026-11-07 from live DC Hub data · DCPI live as of 2026-11-12

**Question this page answers:** How much power is available in the Abilene data center market?

**Answer it live over MCP:** `execute_plan(intent="how much power is available in the Abilene market for a data center")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

DCPI Score**42.7/100**

MW, all listings**1,950**sum of the sites that report MW; some do notany status, unverified listings included

Verdict**CAUTION**

## Abilene at a glance

Abilene has 150 MW operational and 1,200 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-12. By listed capacity the largest operators are Stargate (OpenAI/SoftBank/Oracle) (1,200 MW) and Lancium (150 MW).

Capacity by status, as of 2026-11-12

| Status | MW |
| --- | --- |
| Operational | 150 |
| Under construction | 1,200 |
| Total listed | 1,350 |

## Developers building or planning in Abilene

| Operator | Under construction MW | Planned MW |
| --- | --- | --- |
| Stargate (OpenAI/SoftBank/Oracle) | 1,200 |  |

Source: DC Hub (dchub.cloud), facility records as of 2026-11-12. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

## Colocation lease rates in Abilene

DC Hub does not hold a lease-rate figure for this market yet.

Abilene's data center footprint spans 1,950 MW across five tracked facilities, anchored by hyperscaler and specialized compute operators. LONGHORN DATA CENTER, Lancium, Oracle/OpenAI, and the Stargate project (OpenAI/SoftBank/Oracle) represent the operator base, with no recent deal activity recorded in the tracked period.

The DCPI verdict of CAUTION reflects a balanced but tightening supply outlook. Operators pursuing capacity additions should expect deliberate grid coordination and may face capacity reservation requirements that exceed typical regional baselines.

Operator composition reflects heavy concentration among hyperscalers and AI-focused compute platforms. The presence of four distinct operators across 1,950 MW indicates fragmentation compared to markets dominated by single-operator campuses, though the Stargate project's scale potential could reshape this distribution. The operator roster suggests demand persistence for both GPU-intensive and general compute capacity.

## Data centers in Abilene

| Facility | Operator | Status | MW |
| --- | --- | --- | --- |
| [Stargate Abilene Phase 1](https://dchub.cloud/facilities/stargate-openaisoftbankoracle-stargate-abilene-phase-1-e58a6566) | Stargate (OpenAI/SoftBank/Oracle) | Under Construction | 1,200 |
| [Lancium Abilene](https://dchub.cloud/facilities/lancium-lancium-abilene-b31cd0b8) | Lancium | Operational | 150 |
| [LONGHORN DATA CENTER](https://dchub.cloud/facilities/longhorn-data-center-91c2965b) |  |  |  |

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in [Texas](https://dchub.cloud/facilities/in/us/texas).

## More on Abilene

- [Abilene DCPI score](https://dchub.cloud/dcpi/abilene)
- [Abilene market brief](https://dchub.cloud/markets/abilene/brief)
- [Texas data center market brief](https://dchub.cloud/states/texas/brief)
- [Texas data center tax incentives](https://dchub.cloud/states/texas/data-center-incentives)

### Email me when the Abilene DCPI verdict changes

Email me when Abilene's DCPI verdict (BUILD / CAUTION / AVOID) changes. We'll send one confirmation link first; nothing else is sent unless you click it. Unsubscribe anytime.

Looking for an offer? [Find data center capacity to buy or lease](https://dchub.cloud/listings). Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.

Control a site or capacity? [List operator-controlled capacity for review](https://dchub.cloud/listings#list-capacity). DC Hub complements your existing research and procurement tools with data center and energy intelligence.

Ask your agent: connect [https://dchub.cloud/mcp](https://dchub.cloud/connect?ref=market-related) (no key needed for previews).

Abilene: 1,950 MW tracked, any status — live, cited, and queryable by API or MCP.

[Unlock full market data →](https://dchub.cloud/pricing?ref=market-deep-dive&tool=abilene) · [Get an API key →](https://dchub.cloud/connect?ref=market-deep-dive&tool=abilene)

JSON: [/api/v1/markets/abilene/deep-dive](https://dchub.cloud/api/v1/markets/abilene/deep-dive) · DCPI: [/dcpi](https://dchub.cloud/dcpi) · Operators: [/operators](https://dchub.cloud/operators) · Narrative written 2026-11-07, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load

```json
{"@context":"https://schema.org","@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"DC Hub","item":"https://dchub.cloud/"},{"@type":"ListItem","position":2,"name":"Markets","item":"https://dchub.cloud/markets"},{"@type":"ListItem","position":3,"name":"Abilene","item":"https://dchub.cloud/markets/abilene"}]}
{
 "@context":"https://schema.org","@type":"Article",
 "headline":"Abilene Data Center Market Deep-Dive",
 "datePublished":"2026-11-07T09:36:06.068779+00:00",
 "author":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "publisher":{"@type":"Organization","@id":"https://dchub.cloud/#organization","name":"DC Hub","url":"https://dchub.cloud"},
 "url":"https://dchub.cloud/markets/abilene",
 "wordCount":199,
 "about":{"@type":"Place","name":"Abilene"},
 "description":"Live data-center market analysis. DCPI score 42.7/100."
}
{"@context": "https://schema.org", "@type": "Dataset", "identifier": "abilene", "name": "Abilene Data Center Market — DC Hub", "description": "Live data-center market measurements for Abilene, published by DC Hub with the basis of each figure.", "url": "https://dchub.cloud/markets/abilene", "license": "https://creativecommons.org/licenses/by/4.0/", "isAccessibleForFree": true, "creator": {"@type": "Organization", "@id": "https://dchub.cloud/#organization", "name": "DC Hub", "url": "https://dchub.cloud"}, "citation": "DC Hub, dchub.cloud", "spatialCoverage": {"@type": "Place", "name": "Abilene"}, "variableMeasured": [{"@type": "PropertyValue", "name": "Total Capacity", "value": 1950.0, "unitCode": "MAW", "unitText": "MW", "measurementTechnique": "collapse each site to one figure first (MAX(mw) per identity), then sum — immune to multi-row sites, but silently drops a genuinely separate building that shares an identity key", "description": "population=tracked; aggregation=sum_sites; grouping=market_slug — MW totals from different surfaces are comparable only when all three axes match. A larger number is usually a wider population, not more capacity. Definitions: https://dchub.cloud/data-sources"}, {"@type": "PropertyValue", "name": "DCPI Score", "value": 42.7, "maxValue": 100, "measurementTechnique": "Data Center Power Index — buildability composite scored 0-100 (excess-power headroom, grid constraint, time-to-power), verdict-gated. Comparable only against other DCPI scores; not a capacity, a ranking position, or a percentage.", "description": "Data Center Power Index — buildability composite, 0-100. Observed 2026-11-12T08:50:03."}, {"@type": "PropertyValue", "name": "DCPI Verdict", "value": "CAUTION", "measurementTechnique": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:50:03.", "description": "Data Center Power Index verdict. One of BUILD, CAUTION, AVOID. Derived from exactly two inputs, the excess-power and grid-constraint scores: BUILD when excess-power ≥ 65 and grid-constraint ≤ 50; CAUTION when excess-power ≥ 50 and grid-constraint ≤ 70; otherwise AVOID. Time-to-power is NOT an input — a faster interconnect cannot move a market out of AVOID. AVOID is the fallback, so it means the market did not clear a band, including when an input is missing; it is not a claim that the market is actively bad. A label, not a score: not orderable and not comparable with a number. Observed 2026-11-12T08:50:03."}], "dateModified": "2026-11-07", "temporalCoverage": "2026-11-07"}
{"@context": "https://schema.org", "@type": "WebPage", "@id": "https://dchub.cloud/markets/abilene#webpage", "url": "https://dchub.cloud/markets/abilene", "name": "Abilene data center market", "mainEntity": {"@type": "Question", "name": "How much power is available in the Abilene data center market?", "acceptedAnswer": {"@type": "Answer", "text": "Ask it live over MCP: execute_plan(intent=\"how much power is available in the Abilene market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result]."}}, "potentialAction": {"@type": "Action", "name": "How much power is available in the Abilene data center market?", "description": "Ask this question live over MCP with execute_plan(intent=\"how much power is available in the Abilene market for a data center\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].", "target": {"@type": "EntryPoint", "urlTemplate": "https://dchub.cloud/mcp", "contentType": "application/json", "httpMethod": "POST"}}}
```