---
description: 100–500 MW planned data center in Millard County, Utah, operated by Zeo Energy, on the WECC grid. Specs, nearby power and peer sites on DC Hub.
title: Zeo Energy Millard County, Ut — Data Center
image: https://dchub.cloud/og-brand-v2.png
---

[Home](https://dchub.cloud/) · [Facilities](https://dchub.cloud/facilities) · [United States](https://dchub.cloud/facilities/in/us) · [Utah](https://dchub.cloud/facilities/in/us/utah "Data centers in Utah") · [South West Jordan](https://dchub.cloud/dcpi/south-west-jordan) · Zeo Energy Millard County, Ut

# Zeo Energy Millard County, Ut

- Operator Zeo Energy
- Status Planned

[Millard County, Ut, US](https://dchub.cloud/dcpi/south-west-jordan)

**Zeo Energy Millard County, Ut** is a data center operated by Zeo Energy in Millard County, Ut, US. Its reported power capacity falls in the 100–500 MW range and it is currently planned.

Power

100–500 MW

Status

Planned

City

Millard County

State

Ut

[Country US](https://dchub.cloud/facilities/in/us)

Source: DC Hub facilities registry · Added May 4, 2026, not re-checked since · Basis: cited ([what this means](https://dchub.cloud/data-sources))

## Market intelligence

[CAUTION](https://dchub.cloud/dcpi/south-west-jordan "Full DCPI breakdown")

South West Jordan

[ISOWECC](https://dchub.cloud/dcpi/south-west-jordan)[DCPI composite48.6](https://dchub.cloud/dcpi/south-west-jordan)[Excess-powerLocked](https://dchub.cloud/dcpi/south-west-jordan)[ConstraintLocked](https://dchub.cloud/dcpi/south-west-jordan)[Time-to-powerLocked](https://dchub.cloud/dcpi/south-west-jordan)

[Power outlook →](https://dchub.cloud/dcpi/south-west-jordan "Power outlook for South West Jordan") [South West Jordan market page →](https://dchub.cloud/markets/south-west-jordan)

## Market context

Zeo Energy Millard County, Ut is one of 4 facilities DC Hub’s South West Jordan brief counts on the WECC grid. [Read the South West Jordan market brief →](https://dchub.cloud/markets/south-west-jordan)

## Location

Area Millard County, Ut, US

Exact location not on record.

## Market & grid context

Published DC Hub data for this location.

LocationMillard County, US

Reported capacity100–500 MW

## Other data centers nearby

Tracked by DC Hub in Millard County.

- [Fervo](https://dchub.cloud/facilities/fervo-a6fda21d) · 100–500 MW
- [QTS Eagle Mountain Campus](https://dchub.cloud/facilities/qts-qts-eagle-mountain-campus-b753d087) · QTS · 100–500 MW
- [Google Eagle Mountain Data Center](https://dchub.cloud/facilities/google-google-eagle-mountain-data-center-ac813d27) · Google · 100–500 MW
- [Novva West Jordan Campus Phase 1](https://dchub.cloud/facilities/novva-data-centers-novva-west-jordan-campus-phase-1-b2c050c3) · Novva Data Centers · 100–500 MW
- [Compass Salt Lake City Campus](https://dchub.cloud/facilities/compass-datacenters-compass-salt-lake-city-campus-3127b981) · Compass Datacenters · 100–500 MW
- [Aligned Salt Lake SLC-02](https://dchub.cloud/facilities/aligned-aligned-salt-lake-slc-02-48d0c9ac) · Aligned · 50–100 MW

[Unlock power scores for this site →](https://dchub.cloud/pricing) [Free MCP key (AI agents)](https://dchub.cloud/ai) [Used by Claude & Cursor](https://dchub.cloud/cited-by)

**Question this page answers:** What is the operator, status and power context of Zeo Energy Millard County, Ut in Millard County, Ut, US?

**Answer it live over MCP:** `execute_plan(intent="Zeo Energy Millard County, Ut data center in Millard County, Ut, US: operator, status and grid power context")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

**Add DC Hub to your assistant:** [ChatGPT app](https://chatgpt.com/plugins/plugin_asdk_app_6add46d40f448191905e327e261ec86c) (install guide: [https://dchub.cloud/install/chatgpt](https://dchub.cloud/install/chatgpt)); [Claude connector: https://dchub.cloud/connect/claude](https://dchub.cloud/connect/claude).

**Get this live in your assistant:** DC Hub MCP at [https://dchub.cloud/mcp](https://dchub.cloud/mcp). Ask it with `execute_plan(intent="Zeo Energy Millard County, Ut data center in Millard County, Ut, US: operator, status and grid power context")`. Add to [ChatGPT](https://dchub.cloud/install/chatgpt?via=mcp) · [Claude](https://dchub.cloud/connect/claude?via=mcp) · [Cursor](https://dchub.cloud/connect?via=mcp).

Data: DC Hub global infrastructure database · [Raw JSON](https://dchub.cloud/api/v1/facilities/zeo-energy-zeo-energy-millard-county-ut-bff01a4c)

Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP over Streamable HTTP at https://dchub.cloud/mcp; call `execute_plan` with this page's question for one dated, cited answer. You can also query `get_facility slug="zeo-energy-zeo-energy-millard-county-ut-bff01a4c"`. Source: DC Hub (dchub.cloud), as of [the as_of date on the result]. Connect: [https://dchub.cloud/connect](https://dchub.cloud/connect) Schema, units and the population behind every count: [https://dchub.cloud/bind](https://dchub.cloud/bind)

```json
{
  "@context": "https://schema.org",
  "@type": "Place",
  "@id": "https://dchub.cloud/facilities/zeo-energy-zeo-energy-millard-county-ut-bff01a4c#place",
  "url": "https://dchub.cloud/facilities/zeo-energy-zeo-energy-millard-county-ut-bff01a4c",
  "name": "Zeo Energy Millard County, Ut",
  "description": "Data center facility operated by Zeo Energy in Millard County, Ut, US. Source: DC Hub (dchub.cloud), CC-BY-4.0.",
  "identifier": "bff01a4c",
  "isAccessibleForFree": true,
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "address": {
    "@type": "PostalAddress",
    "addressLocality": "Millard County",
    "addressRegion": "Ut",
    "addressCountry": "US"
  },
  "additionalType": "https://schema.org/DataCenter",
  "potentialAction": {
    "@type": "Action",
    "name": "What is the operator, status and power context of Zeo Energy Millard County, Ut in Millard County, Ut, US?",
    "description": "Ask this question live over MCP with execute_plan(intent=\"Zeo Energy Millard County, Ut data center in Millard County, Ut, US: operator, status and grid power context\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].",
    "target": {
      "@type": "EntryPoint",
      "urlTemplate": "https://dchub.cloud/mcp",
      "contentType": "application/json",
      "httpMethod": "POST"
    }
  }
}
{
  "@context": "https://schema.org",
  "@type": "Dataset",
  "@id": "https://dchub.cloud/facilities/zeo-energy-zeo-energy-millard-county-ut-bff01a4c#dataset",
  "name": "Zeo Energy Millard County, Ut \u2014 facility intelligence record",
  "description": "Structured data-center facility record (location, operator, power & connectivity context) for Zeo Energy Millard County, Ut.",
  "url": "https://dchub.cloud/facilities/zeo-energy-zeo-energy-millard-county-ut-bff01a4c",
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "isAccessibleForFree": true,
  "creator": {
    "@type": "Organization",
    "@id": "https://dchub.cloud/#organization",
    "name": "DC Hub",
    "url": "https://dchub.cloud"
  },
  "citation": "DC Hub, dchub.cloud",
  "isBasedOn": {
    "@type": "CreativeWork",
    "name": "DC Hub facilities registry"
  },
  "variableMeasured": [
    {
      "@type": "PropertyValue",
      "name": "Power Capacity (band)",
      "value": "100\u2013500 MW",
      "measurementTechnique": "Single facility record, not an aggregate. power_mw is this site's capacity as tracked by DC Hub. Summing facility MW across a market does NOT reproduce that market's published total \u2014 the market figure applies its own population, de-duplication and grouping (see the market's variableMeasured basis). Do not derive one from the other."
    },
    {
      "@type": "PropertyValue",
      "name": "Lifecycle Status",
      "value": "Planned",
      "description": "Operational lifecycle per util/status_taxonomy. A market's 'operational' population is filtered on this field."
    }
  ],
  "spatialCoverage": {
    "@id": "https://dchub.cloud/facilities/zeo-energy-zeo-energy-millard-county-ut-bff01a4c#place"
  },
  "distribution": [
    {
      "@type": "DataDownload",
      "encodingFormat": "application/json",
      "contentUrl": "https://dchub.cloud/mcp"
    }
  ],
  "potentialAction": {
    "@type": "SearchAction",
    "target": {
      "@type": "EntryPoint",
      "urlTemplate": "https://dchub.cloud/api/v1/rag/search?q={search_term_string}"
    },
    "query-input": "required name=search_term_string"
  }
}
{"@context": "https://schema.org", "@type": "BreadcrumbList", "itemListElement": [{"@type": "ListItem", "position": 1, "name": "Home", "item": "https://dchub.cloud/"}, {"@type": "ListItem", "position": 2, "name": "Facilities", "item": "https://dchub.cloud/facilities"}, {"@type": "ListItem", "position": 3, "name": "United States", "item": "https://dchub.cloud/facilities/in/us"}, {"@type": "ListItem", "position": 4, "name": "Utah", "item": "https://dchub.cloud/facilities/in/us/utah"}, {"@type": "ListItem", "position": 5, "name": "South West Jordan", "item": "https://dchub.cloud/dcpi/south-west-jordan"}, {"@type": "ListItem", "position": 6, "name": "Zeo Energy Millard County, Ut", "item": "https://dchub.cloud/facilities/zeo-energy-zeo-energy-millard-county-ut-bff01a4c"}]}
{"@context": "https://schema.org", "@type": "FAQPage", "mainEntity": [{"@type": "Question", "name": "What is the capacity of Zeo Energy Millard County, Ut?", "acceptedAnswer": {"@type": "Answer", "text": "DC Hub lists Zeo Energy Millard County, Ut at 100–500 MW."}}, {"@type": "Question", "name": "Who operates Zeo Energy Millard County, Ut?", "acceptedAnswer": {"@type": "Answer", "text": "Zeo Energy Millard County, Ut is operated by Zeo Energy."}}, {"@type": "Question", "name": "What is the status of Zeo Energy Millard County, Ut?", "acceptedAnswer": {"@type": "Answer", "text": "DC Hub lists Zeo Energy Millard County, Ut as Planned."}}]}
```
