---
description: 500 MW–1 GW under-construction data center in Lancaster, Texas, operated by Yondr Group, on the ERCOT grid. Specs, nearby power and peer sites on DC Hub.
title: Yondr Lancaster TX Campus — Data Center
image: https://dchub.cloud/og-brand-v2.png
---

[Home](https://dchub.cloud/) · [Facilities](https://dchub.cloud/facilities) · [United States](https://dchub.cloud/facilities/in/us) · [Texas](https://dchub.cloud/facilities/in/us/texas "Data centers in Texas") · [Midlothian](https://dchub.cloud/dcpi/midlothian) · Yondr Lancaster TX Campus

# Yondr Lancaster TX Campus

- Operator Yondr Group
- Status Under Construction

[Lancaster, TX, US](https://dchub.cloud/dcpi/midlothian)

**Yondr Lancaster TX Campus** is a data center operated by Yondr Group in Lancaster, TX, US. Its reported power capacity falls in the 500 MW–1 GW range and it is currently under construction.

Power

500 MW–1 GW

Status

Under Construction

[Market Lancaster](https://dchub.cloud/dcpi/midlothian)

State

TX

[Country US](https://dchub.cloud/facilities/in/us)

Source: DC Hub facilities registry · Added Mar 18, 2026, not re-checked since · Basis: cited ([what this means](https://dchub.cloud/data-sources))

## Market intelligence

[CAUTION](https://dchub.cloud/dcpi/midlothian "Full DCPI breakdown")

Midlothian

[ISOERCOT](https://dchub.cloud/dcpi/midlothian)[DCPI composite45.5](https://dchub.cloud/dcpi/midlothian)[Excess-powerLocked](https://dchub.cloud/dcpi/midlothian)[ConstraintLocked](https://dchub.cloud/dcpi/midlothian)[Time-to-powerLocked](https://dchub.cloud/dcpi/midlothian)

[Power outlook →](https://dchub.cloud/dcpi/midlothian "Power outlook for Midlothian") [Midlothian market page →](https://dchub.cloud/markets/midlothian)

## Market context

Yondr Lancaster TX Campus is one of 4 facilities DC Hub’s Midlothian brief counts on the ERCOT grid. [Read the Midlothian market brief →](https://dchub.cloud/markets/midlothian)

## Location

Area Lancaster, TX, US

Exact location not on record.

## Market & grid context

Published DC Hub data for this location.

LocationLancaster, US

Reported capacity500 MW–1 GW

## Other data centers nearby

Tracked by DC Hub in Lancaster.

- [Yondr Lancaster (Dallas Campus)](https://dchub.cloud/facilities/yondr-group-yondr-lancaster-dallas-campus-66f1f2c9) · Yondr Group · 500 MW–1 GW
- [CoreWeave Lancaster PA Campus](https://dchub.cloud/facilities/coreweave-coreweave-lancaster-pa-campus-1be57664) · CoreWeave · 500 MW–1 GW
- [CoreWeave Lancaster PA (Chirisa)](https://dchub.cloud/facilities/coreweave-coreweave-lancaster-pa-chirisa-23c7f37e) · CoreWeave · 100–500 MW
- [TABLE MOUNTAIN INDUSTRIES LLC](https://dchub.cloud/facilities/table-mountain-industries-llc-fd76aef4)
- [Unknown One TX Data Center](https://dchub.cloud/facilities/unknown-unknown-one-tx-data-center-6b540e34) · Unknown · 5–10 GW
- [CoreWeave West Texas (Project Horizon)](https://dchub.cloud/facilities/coreweave-coreweave-west-texas-project-horizon-6091c279) · CoreWeave · 1–5 GW

[Unlock power scores for this site →](https://dchub.cloud/pricing) [Free MCP key (AI agents)](https://dchub.cloud/ai) [Used by Claude & Cursor](https://dchub.cloud/cited-by)

**Question this page answers:** What is the operator, status and power context of Yondr Lancaster TX Campus in Lancaster, TX, US?

**Answer it live over MCP:** `execute_plan(intent="Yondr Lancaster TX Campus data center in Lancaster, TX, US: operator, status and grid power context")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

**Add DC Hub to your assistant:** [ChatGPT app](https://chatgpt.com/plugins/plugin_asdk_app_6add46d40f448191905e327e261ec86c) (install guide: [https://dchub.cloud/install/chatgpt](https://dchub.cloud/install/chatgpt)); [Claude connector: https://dchub.cloud/connect/claude](https://dchub.cloud/connect/claude).

**Get this live in your assistant:** DC Hub MCP at [https://dchub.cloud/mcp](https://dchub.cloud/mcp). Ask it with `execute_plan(intent="Yondr Lancaster TX Campus data center in Lancaster, TX, US: operator, status and grid power context")`. Add to [ChatGPT](https://dchub.cloud/install/chatgpt?via=mcp) · [Claude](https://dchub.cloud/connect/claude?via=mcp) · [Cursor](https://dchub.cloud/connect?via=mcp).

Data: DC Hub global infrastructure database · [Raw JSON](https://dchub.cloud/api/v1/facilities/yondr-group-yondr-lancaster-tx-campus-2b71f259)

Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP over Streamable HTTP at https://dchub.cloud/mcp; call `execute_plan` with this page's question for one dated, cited answer. You can also query `get_facility slug="yondr-group-yondr-lancaster-tx-campus-2b71f259"`. Source: DC Hub (dchub.cloud), as of [the as_of date on the result]. Connect: [https://dchub.cloud/connect](https://dchub.cloud/connect) Schema, units and the population behind every count: [https://dchub.cloud/bind](https://dchub.cloud/bind)

```json
{
  "@context": "https://schema.org",
  "@type": "Place",
  "@id": "https://dchub.cloud/facilities/yondr-group-yondr-lancaster-tx-campus-2b71f259#place",
  "url": "https://dchub.cloud/facilities/yondr-group-yondr-lancaster-tx-campus-2b71f259",
  "name": "Yondr Lancaster TX Campus",
  "description": "Data center facility operated by Yondr Group in Lancaster, TX, US. Source: DC Hub (dchub.cloud), CC-BY-4.0.",
  "identifier": "2b71f259",
  "isAccessibleForFree": true,
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "address": {
    "@type": "PostalAddress",
    "addressLocality": "Lancaster",
    "addressRegion": "TX",
    "addressCountry": "US"
  },
  "additionalType": "https://schema.org/DataCenter",
  "potentialAction": {
    "@type": "Action",
    "name": "What is the operator, status and power context of Yondr Lancaster TX Campus in Lancaster, TX, US?",
    "description": "Ask this question live over MCP with execute_plan(intent=\"Yondr Lancaster TX Campus data center in Lancaster, TX, US: operator, status and grid power context\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].",
    "target": {
      "@type": "EntryPoint",
      "urlTemplate": "https://dchub.cloud/mcp",
      "contentType": "application/json",
      "httpMethod": "POST"
    }
  }
}
{
  "@context": "https://schema.org",
  "@type": "Dataset",
  "@id": "https://dchub.cloud/facilities/yondr-group-yondr-lancaster-tx-campus-2b71f259#dataset",
  "name": "Yondr Lancaster TX Campus \u2014 facility intelligence record",
  "description": "Structured data-center facility record (location, operator, power & connectivity context) for Yondr Lancaster TX Campus.",
  "url": "https://dchub.cloud/facilities/yondr-group-yondr-lancaster-tx-campus-2b71f259",
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "isAccessibleForFree": true,
  "creator": {
    "@type": "Organization",
    "@id": "https://dchub.cloud/#organization",
    "name": "DC Hub",
    "url": "https://dchub.cloud"
  },
  "citation": "DC Hub, dchub.cloud",
  "isBasedOn": {
    "@type": "CreativeWork",
    "name": "DC Hub facilities registry"
  },
  "variableMeasured": [
    {
      "@type": "PropertyValue",
      "name": "Power Capacity (band)",
      "value": "500 MW\u20131 GW",
      "measurementTechnique": "Single facility record, not an aggregate. power_mw is this site's capacity as tracked by DC Hub. Summing facility MW across a market does NOT reproduce that market's published total \u2014 the market figure applies its own population, de-duplication and grouping (see the market's variableMeasured basis). Do not derive one from the other."
    },
    {
      "@type": "PropertyValue",
      "name": "Lifecycle Status",
      "value": "Under Construction",
      "description": "Operational lifecycle per util/status_taxonomy. A market's 'operational' population is filtered on this field."
    }
  ],
  "spatialCoverage": {
    "@id": "https://dchub.cloud/facilities/yondr-group-yondr-lancaster-tx-campus-2b71f259#place"
  },
  "distribution": [
    {
      "@type": "DataDownload",
      "encodingFormat": "application/json",
      "contentUrl": "https://dchub.cloud/mcp"
    }
  ],
  "potentialAction": {
    "@type": "SearchAction",
    "target": {
      "@type": "EntryPoint",
      "urlTemplate": "https://dchub.cloud/api/v1/rag/search?q={search_term_string}"
    },
    "query-input": "required name=search_term_string"
  }
}
{"@context": "https://schema.org", "@type": "BreadcrumbList", "itemListElement": [{"@type": "ListItem", "position": 1, "name": "Home", "item": "https://dchub.cloud/"}, {"@type": "ListItem", "position": 2, "name": "Facilities", "item": "https://dchub.cloud/facilities"}, {"@type": "ListItem", "position": 3, "name": "United States", "item": "https://dchub.cloud/facilities/in/us"}, {"@type": "ListItem", "position": 4, "name": "Texas", "item": "https://dchub.cloud/facilities/in/us/texas"}, {"@type": "ListItem", "position": 5, "name": "Midlothian", "item": "https://dchub.cloud/dcpi/midlothian"}, {"@type": "ListItem", "position": 6, "name": "Yondr Lancaster TX Campus", "item": "https://dchub.cloud/facilities/yondr-group-yondr-lancaster-tx-campus-2b71f259"}]}
{"@context": "https://schema.org", "@type": "FAQPage", "mainEntity": [{"@type": "Question", "name": "What is the capacity of Yondr Lancaster TX Campus?", "acceptedAnswer": {"@type": "Answer", "text": "DC Hub lists Yondr Lancaster TX Campus at 500 MW–1 GW."}}, {"@type": "Question", "name": "Who operates Yondr Lancaster TX Campus?", "acceptedAnswer": {"@type": "Answer", "text": "Yondr Lancaster TX Campus is operated by Yondr Group."}}, {"@type": "Question", "name": "What is the status of Yondr Lancaster TX Campus?", "acceptedAnswer": {"@type": "Answer", "text": "DC Hub lists Yondr Lancaster TX Campus as Under Construction."}}]}
```
