---
description: 1–5 GW under-construction data center in Albany, Texas, operated by Vantage, on the ERCOT grid. 2,647 MW of operating generation within 50 km.
title: Vantage Frontier Campus 1.4 GW — Data Center
image: https://dchub.cloud/og-brand-v2.png
---

[Home](https://dchub.cloud/) · [Facilities](https://dchub.cloud/facilities) · [United States](https://dchub.cloud/facilities/in/us) · [Texas](https://dchub.cloud/facilities/in/us/texas "Data centers in Texas") · [Abilene](https://dchub.cloud/dcpi/abilene) · Frontier Campus 1.4 GW

# Vantage Frontier Campus 1.4 GW

- Operator Vantage
- Status Under Construction

[Albany, TX, US](https://dchub.cloud/dcpi/abilene)

**Frontier Campus 1.4 GW** is a data center operated by Vantage in Albany, TX, US. Its reported power capacity falls in the 1–5 GW range and it is currently under construction.

Power

1–5 GW

Status

Under Construction

City

Albany

State

TX

[Country US](https://dchub.cloud/facilities/in/us)

Source: DC Hub facilities registry · Added Mar 28, 2026, not re-checked since · Basis: cited ([what this means](https://dchub.cloud/data-sources))

## Market intelligence

[CAUTION](https://dchub.cloud/dcpi/abilene "Full DCPI breakdown")

Abilene

[ISOERCOT](https://dchub.cloud/dcpi/abilene)[DCPI composite42.7](https://dchub.cloud/dcpi/abilene)[Excess-powerLocked](https://dchub.cloud/dcpi/abilene)[ConstraintLocked](https://dchub.cloud/dcpi/abilene)[Time-to-powerLocked](https://dchub.cloud/dcpi/abilene)

[Power outlook →](https://dchub.cloud/dcpi/abilene "Power outlook for Abilene") [Abilene market page →](https://dchub.cloud/markets/abilene)

## Market context

Vantage Frontier Campus 1.4 GW is one of 5 facilities DC Hub’s Abilene brief counts on the ERCOT grid. The closest tracked facility is Vantage Frontier Campus, under 1 km away, and the nearest mapped substation is within 1 km. [Read the Abilene market brief →](https://dchub.cloud/markets/abilene)

## Location

Area Albany, TX, US

[Open the approximate area in OpenStreetMap](https://www.openstreetmap.org/#map=14/32.72/-99.30)

Approximate area (about 1 km)

[Sign in free to see the exact location — 10 sites a month](https://dchub.cloud/signup?next=/facilities/vantage-frontier-campus-14-gw-4c452469)

## Market & grid context

Published DC Hub data for this location.

LocationAlbany, US

Reported capacity1–5 GW

Nearest substationwithin 1 km

## Power generation nearby

DC Hub tracks 11 operating generating units totalling 2,647 MW within about 50 km of Albany, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Wind1,961 MW · 8 units · 74%

Oil/Gas360 MW · 1 unit · 14%

Utility-Scale Solar325 MW · 2 units · 12%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

## Other data centers nearby

Nearest first, by distance from this site.

- [Vantage Frontier Campus](https://dchub.cloud/facilities/vantage-data-centers-vantage-frontier-campus-15f3d87f) · Vantage Data Centers · 1–5 GW · under 1 km
- [LONGHORN DATA CENTER](https://dchub.cloud/facilities/longhorn-data-center-91c2965b) · about 50 km
- [Crusoe Abilene TX (Stargate/OpenAI)](https://dchub.cloud/facilities/stargate-openaisoftbankoracle-stargate-abilene-phase-1-e58a6566) · Crusoe Energy · 100–500 MW · about 50 km
- [OSM DC 1472056707](https://dchub.cloud/facilities/unknown-osm-dc-1472056707-ba4e290a) · Unknown · about 51 km
- [OSM DC 1472056708](https://dchub.cloud/facilities/unknown-osm-dc-1472056708-6783d4d7) · Unknown · about 51 km
- [OSM DC 1472056709](https://dchub.cloud/facilities/unknown-osm-dc-1472056709-364fec2c) · Unknown · about 51 km

[Unlock power scores for this site →](https://dchub.cloud/pricing) [Free MCP key (AI agents)](https://dchub.cloud/ai) [Used by Claude & Cursor](https://dchub.cloud/cited-by)

**Question this page answers:** What is the operator, status and power context of Vantage Frontier Campus 1.4 GW in Albany, TX, US?

**Answer it live over MCP:** `execute_plan(intent="Vantage Frontier Campus 1.4 GW data center in Albany, TX, US: operator, status and grid power context")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

**Add DC Hub to your assistant:** [ChatGPT app](https://chatgpt.com/plugins/plugin_asdk_app_6add46d40f448191905e327e261ec86c) (install guide: [https://dchub.cloud/install/chatgpt](https://dchub.cloud/install/chatgpt)); [Claude connector: https://dchub.cloud/connect/claude](https://dchub.cloud/connect/claude).

**Get this live in your assistant:** DC Hub MCP at [https://dchub.cloud/mcp](https://dchub.cloud/mcp). Ask it with `execute_plan(intent="Vantage Frontier Campus 1.4 GW data center in Albany, TX, US: operator, status and grid power context")`. Add to [ChatGPT](https://dchub.cloud/install/chatgpt?via=mcp) · [Claude](https://dchub.cloud/connect/claude?via=mcp) · [Cursor](https://dchub.cloud/connect?via=mcp).

Data: DC Hub global infrastructure database · [Raw JSON](https://dchub.cloud/api/v1/facilities/vantage-frontier-campus-14-gw-4c452469)

Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP over Streamable HTTP at https://dchub.cloud/mcp; call `execute_plan` with this page's question for one dated, cited answer. You can also query `get_facility slug="vantage-frontier-campus-14-gw-4c452469"`. Source: DC Hub (dchub.cloud), as of [the as_of date on the result]. Connect: [https://dchub.cloud/connect](https://dchub.cloud/connect) Schema, units and the population behind every count: [https://dchub.cloud/bind](https://dchub.cloud/bind)

```json
{
  "@context": "https://schema.org",
  "@type": "Place",
  "@id": "https://dchub.cloud/facilities/vantage-frontier-campus-14-gw-4c452469#place",
  "url": "https://dchub.cloud/facilities/vantage-frontier-campus-14-gw-4c452469",
  "name": "Vantage Frontier Campus 1.4 GW",
  "description": "Data center facility operated by Vantage in Albany, TX, US. Source: DC Hub (dchub.cloud), CC-BY-4.0.",
  "identifier": "4c452469",
  "isAccessibleForFree": true,
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "address": {
    "@type": "PostalAddress",
    "addressLocality": "Albany",
    "addressRegion": "TX",
    "addressCountry": "US"
  },
  "additionalType": "https://schema.org/DataCenter",
  "potentialAction": {
    "@type": "Action",
    "name": "What is the operator, status and power context of Vantage Frontier Campus 1.4 GW in Albany, TX, US?",
    "description": "Ask this question live over MCP with execute_plan(intent=\"Vantage Frontier Campus 1.4 GW data center in Albany, TX, US: operator, status and grid power context\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].",
    "target": {
      "@type": "EntryPoint",
      "urlTemplate": "https://dchub.cloud/mcp",
      "contentType": "application/json",
      "httpMethod": "POST"
    }
  }
}
{
  "@context": "https://schema.org",
  "@type": "Dataset",
  "@id": "https://dchub.cloud/facilities/vantage-frontier-campus-14-gw-4c452469#dataset",
  "name": "Vantage Frontier Campus 1.4 GW \u2014 facility intelligence record",
  "description": "Structured data-center facility record (location, operator, power & connectivity context) for Vantage Frontier Campus 1.4 GW.",
  "url": "https://dchub.cloud/facilities/vantage-frontier-campus-14-gw-4c452469",
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "isAccessibleForFree": true,
  "creator": {
    "@type": "Organization",
    "@id": "https://dchub.cloud/#organization",
    "name": "DC Hub",
    "url": "https://dchub.cloud"
  },
  "citation": "DC Hub, dchub.cloud",
  "isBasedOn": {
    "@type": "CreativeWork",
    "name": "DC Hub facilities registry"
  },
  "variableMeasured": [
    {
      "@type": "PropertyValue",
      "name": "Power Capacity (band)",
      "value": "1\u20135 GW",
      "measurementTechnique": "Single facility record, not an aggregate. power_mw is this site's capacity as tracked by DC Hub. Summing facility MW across a market does NOT reproduce that market's published total \u2014 the market figure applies its own population, de-duplication and grouping (see the market's variableMeasured basis). Do not derive one from the other."
    },
    {
      "@type": "PropertyValue",
      "name": "Lifecycle Status",
      "value": "Under Construction",
      "description": "Operational lifecycle per util/status_taxonomy. A market's 'operational' population is filtered on this field."
    }
  ],
  "spatialCoverage": {
    "@id": "https://dchub.cloud/facilities/vantage-frontier-campus-14-gw-4c452469#place"
  },
  "distribution": [
    {
      "@type": "DataDownload",
      "encodingFormat": "application/json",
      "contentUrl": "https://dchub.cloud/mcp"
    }
  ],
  "potentialAction": {
    "@type": "SearchAction",
    "target": {
      "@type": "EntryPoint",
      "urlTemplate": "https://dchub.cloud/api/v1/rag/search?q={search_term_string}"
    },
    "query-input": "required name=search_term_string"
  }
}
{"@context": "https://schema.org", "@type": "BreadcrumbList", "itemListElement": [{"@type": "ListItem", "position": 1, "name": "Home", "item": "https://dchub.cloud/"}, {"@type": "ListItem", "position": 2, "name": "Facilities", "item": "https://dchub.cloud/facilities"}, {"@type": "ListItem", "position": 3, "name": "United States", "item": "https://dchub.cloud/facilities/in/us"}, {"@type": "ListItem", "position": 4, "name": "Texas", "item": "https://dchub.cloud/facilities/in/us/texas"}, {"@type": "ListItem", "position": 5, "name": "Abilene", "item": "https://dchub.cloud/dcpi/abilene"}, {"@type": "ListItem", "position": 6, "name": "Frontier Campus 1.4 GW", "item": "https://dchub.cloud/facilities/vantage-frontier-campus-14-gw-4c452469"}]}
{"@context": "https://schema.org", "@type": "FAQPage", "mainEntity": [{"@type": "Question", "name": "What is the capacity of Frontier Campus 1.4 GW?", "acceptedAnswer": {"@type": "Answer", "text": "DC Hub lists Frontier Campus 1.4 GW at 1–5 GW."}}, {"@type": "Question", "name": "Who operates Frontier Campus 1.4 GW?", "acceptedAnswer": {"@type": "Answer", "text": "Frontier Campus 1.4 GW is operated by Vantage."}}, {"@type": "Question", "name": "What is the status of Frontier Campus 1.4 GW?", "acceptedAnswer": {"@type": "Answer", "text": "DC Hub lists Frontier Campus 1.4 GW as Under Construction."}}]}
```
