---
description: 5–10 GW planned data center in Abu Dhabi, operated by UAE Government. Specs, nearby power and peer sites on DC Hub.
title: UAE Government Abu Dhabi, UAE — Data Center
image: https://dchub.cloud/og-brand-v2.png
---

[Home](https://dchub.cloud/) · [Facilities](https://dchub.cloud/facilities) · UAE Government Abu Dhabi, UAE

# UAE Government Abu Dhabi, UAE

- Operator UAE Government
- Status Planned

Abu Dhabi

**UAE Government Abu Dhabi, UAE** is a data center operated by UAE Government in Abu Dhabi. Its reported power capacity falls in the 5–10 GW range and it is currently planned.

Power

5–10 GW

Status

Planned

City

Abu Dhabi

Source: DC Hub facilities registry · Added Sep 14, 2026, not re-checked since · Basis: cited ([what this means](https://dchub.cloud/data-sources))

## Location

Area Abu Dhabi

Exact location not on record.

## Market & grid context

Published DC Hub data for this location.

Reported capacity5–10 GW

[Unlock power scores for this site →](https://dchub.cloud/pricing) [Free MCP key (AI agents)](https://dchub.cloud/ai) [Used by Claude & Cursor](https://dchub.cloud/cited-by)

**Question this page answers:** What is the operator, status and power context of UAE Government Abu Dhabi, UAE in Abu Dhabi?

**Answer it live over MCP:** `execute_plan(intent="UAE Government Abu Dhabi, UAE data center in Abu Dhabi: operator, status and grid power context")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

**Add DC Hub to your assistant:** [ChatGPT app](https://chatgpt.com/plugins/plugin_asdk_app_6add46d40f448191905e327e261ec86c) (install guide: [https://dchub.cloud/install/chatgpt](https://dchub.cloud/install/chatgpt)); [Claude connector: https://dchub.cloud/connect/claude](https://dchub.cloud/connect/claude).

**Get this live in your assistant:** DC Hub MCP at [https://dchub.cloud/mcp](https://dchub.cloud/mcp). Ask it with `execute_plan(intent="UAE Government Abu Dhabi, UAE data center in Abu Dhabi: operator, status and grid power context")`. Add to [ChatGPT](https://dchub.cloud/install/chatgpt?via=mcp) · [Claude](https://dchub.cloud/connect/claude?via=mcp) · [Cursor](https://dchub.cloud/connect?via=mcp).

Data: DC Hub global infrastructure database · [Raw JSON](https://dchub.cloud/api/v1/facilities/uae-government-abu-dhabi-uae-a4660624)

Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP over Streamable HTTP at https://dchub.cloud/mcp; call `execute_plan` with this page's question for one dated, cited answer. You can also query `get_facility slug="uae-government-abu-dhabi-uae-a4660624"`. Source: DC Hub (dchub.cloud), as of [the as_of date on the result]. Connect: [https://dchub.cloud/connect](https://dchub.cloud/connect) Schema, units and the population behind every count: [https://dchub.cloud/bind](https://dchub.cloud/bind)

```json
{
  "@context": "https://schema.org",
  "@type": "Place",
  "@id": "https://dchub.cloud/facilities/uae-government-abu-dhabi-uae-a4660624#place",
  "url": "https://dchub.cloud/facilities/uae-government-abu-dhabi-uae-a4660624",
  "name": "UAE Government Abu Dhabi, UAE",
  "description": "Data center facility operated by UAE Government in Abu Dhabi. Source: DC Hub (dchub.cloud), CC-BY-4.0.",
  "identifier": "a4660624",
  "isAccessibleForFree": true,
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "address": {
    "@type": "PostalAddress",
    "addressLocality": "Abu Dhabi"
  },
  "additionalType": "https://schema.org/DataCenter",
  "potentialAction": {
    "@type": "Action",
    "name": "What is the operator, status and power context of UAE Government Abu Dhabi, UAE in Abu Dhabi?",
    "description": "Ask this question live over MCP with execute_plan(intent=\"UAE Government Abu Dhabi, UAE data center in Abu Dhabi: operator, status and grid power context\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].",
    "target": {
      "@type": "EntryPoint",
      "urlTemplate": "https://dchub.cloud/mcp",
      "contentType": "application/json",
      "httpMethod": "POST"
    }
  }
}
{
  "@context": "https://schema.org",
  "@type": "Dataset",
  "@id": "https://dchub.cloud/facilities/uae-government-abu-dhabi-uae-a4660624#dataset",
  "name": "UAE Government Abu Dhabi, UAE \u2014 facility intelligence record",
  "description": "Structured data-center facility record (location, operator, power & connectivity context) for UAE Government Abu Dhabi, UAE.",
  "url": "https://dchub.cloud/facilities/uae-government-abu-dhabi-uae-a4660624",
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "isAccessibleForFree": true,
  "creator": {
    "@type": "Organization",
    "@id": "https://dchub.cloud/#organization",
    "name": "DC Hub",
    "url": "https://dchub.cloud"
  },
  "citation": "DC Hub, dchub.cloud",
  "isBasedOn": {
    "@type": "CreativeWork",
    "name": "DC Hub facilities registry"
  },
  "variableMeasured": [
    {
      "@type": "PropertyValue",
      "name": "Power Capacity (band)",
      "value": "5\u201310 GW",
      "measurementTechnique": "Single facility record, not an aggregate. power_mw is this site's capacity as tracked by DC Hub. Summing facility MW across a market does NOT reproduce that market's published total \u2014 the market figure applies its own population, de-duplication and grouping (see the market's variableMeasured basis). Do not derive one from the other."
    },
    {
      "@type": "PropertyValue",
      "name": "Lifecycle Status",
      "value": "Planned",
      "description": "Operational lifecycle per util/status_taxonomy. A market's 'operational' population is filtered on this field."
    }
  ],
  "spatialCoverage": {
    "@id": "https://dchub.cloud/facilities/uae-government-abu-dhabi-uae-a4660624#place"
  },
  "distribution": [
    {
      "@type": "DataDownload",
      "encodingFormat": "application/json",
      "contentUrl": "https://dchub.cloud/mcp"
    }
  ],
  "potentialAction": {
    "@type": "SearchAction",
    "target": {
      "@type": "EntryPoint",
      "urlTemplate": "https://dchub.cloud/api/v1/rag/search?q={search_term_string}"
    },
    "query-input": "required name=search_term_string"
  }
}
{"@context": "https://schema.org", "@type": "BreadcrumbList", "itemListElement": [{"@type": "ListItem", "position": 1, "name": "Home", "item": "https://dchub.cloud/"}, {"@type": "ListItem", "position": 2, "name": "Facilities", "item": "https://dchub.cloud/facilities"}, {"@type": "ListItem", "position": 3, "name": "UAE Government Abu Dhabi, UAE", "item": "https://dchub.cloud/facilities/uae-government-abu-dhabi-uae-a4660624"}]}
{"@context": "https://schema.org", "@type": "FAQPage", "mainEntity": [{"@type": "Question", "name": "What is the capacity of UAE Government Abu Dhabi, UAE?", "acceptedAnswer": {"@type": "Answer", "text": "DC Hub lists UAE Government Abu Dhabi, UAE at 5–10 GW."}}, {"@type": "Question", "name": "Who operates UAE Government Abu Dhabi, UAE?", "acceptedAnswer": {"@type": "Answer", "text": "UAE Government Abu Dhabi, UAE is operated by UAE Government."}}, {"@type": "Question", "name": "What is the status of UAE Government Abu Dhabi, UAE?", "acceptedAnswer": {"@type": "Answer", "text": "DC Hub lists UAE Government Abu Dhabi, UAE as Planned."}}]}
```
