---
description: Under 10 MW operational data center in Ankara, Turkey, operated by Turkcell. 1,628 MW of operating generation within 50 km. Specs, nearby power & peers.
title: Turkcell Ankara Veri Merkezi — Data Center
image: https://dchub.cloud/og-brand-v2.png
---

[Home](https://dchub.cloud/) · [Facilities](https://dchub.cloud/facilities) · [Turkey](https://dchub.cloud/facilities/in/tr) · Turkcell Ankara Veri Merkezi

# Turkcell Ankara Veri Merkezi

- Operator Turkcell
- Status Operational

Ankara, Ankara, TR

**Turkcell Ankara Veri Merkezi** is a data center operated by Turkcell in Ankara, Ankara, TR. Its reported power capacity falls in the under 10 MW range and it is currently operational.

Power

under 10 MW

Status

Operational

Market

Ankara

State

Ankara

[Country TR](https://dchub.cloud/facilities/in/tr)

Source: OpenStreetMap · Added Mar 18, 2026, not re-checked since · Basis: cited ([what this means](https://dchub.cloud/data-sources))

## Market context

The closest tracked facility is Mars Datacenter Ankara-1, about 2 km away.

## Location

Area Ankara, Ankara, TR

[Open the approximate area in OpenStreetMap](https://www.openstreetmap.org/#map=14/39.80/32.42)

Approximate area (about 1 km)

[Sign in free to see the exact location — 10 sites a month](https://dchub.cloud/signup?next=/facilities/turkcell-turkcell-ankara-veri-merkezi-17c179a2)

## Market & grid context

Published DC Hub data for this location.

LocationAnkara, TR

Reported capacityunder 10 MW

## Power generation nearby

DC Hub tracks 84 operating generating units totalling 1,628 MW within about 50 km of Ankara, TR. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas1,186 MW · 3 units · 73%

Utility-Scale Solar344 MW · 77 units · 21%

Bioenergy98 MW · 4 units · 6%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

## Other data centers nearby

Nearest first, by distance from this site.

- [Mars Datacenter Ankara-1](https://dchub.cloud/facilities/mars-datacenter-mars-datacenter-ankara-1-f7bc8f2f) · Mars Datacenter · about 2 km
- [Hedef Hosting](https://dchub.cloud/facilities/hedef-global-biliim-teknolojileri-sanayi-ticaret-limited-irketi-hedef-hosting-503e0e80) · Hedef Global Bilişim Teknolojileri Sanayi Ticaret Limited Şirketi · about 26 km
- [3C1B TELEKOM TEPEPRIME](https://dchub.cloud/facilities/3c1b-telekomunikasyon-ve-internet-hiz-san-ve-tic-as-3c1b-telekom-tepeprime-ce4f4789) · 3C1B Telekomunikasyon ve Internet Hiz. San. ve Tic. A.S. · about 31 km
- [3C1B HUAWEI FUSION DC ANKARA](https://dchub.cloud/facilities/3c1b-telekomunikasyon-ve-internet-hiz-san-ve-tic-as-3c1b-huawei-fusion-dc-ankara-ce178c13) · 3C1B Telekomunikasyon ve Internet Hiz. San. ve Tic. A.S. · about 32 km
- [Ixpanse AN1](https://dchub.cloud/facilities/ixpanse-teknoloji-limited-irketi-betepe-ixpanse-an1-c62ef770) · IXPANSE TEKNOLOJİ LİMİTED ŞİRKETİ Beştepe · about 35 km
- [KERNZEN DC ANK-01](https://dchub.cloud/facilities/kernzen-kernzen-dc-ank-01-66d1740d) · KERNZEN · about 35 km

[Unlock power scores for this site →](https://dchub.cloud/pricing) [Free MCP key (AI agents)](https://dchub.cloud/ai) [Used by Claude & Cursor](https://dchub.cloud/cited-by)

**Question this page answers:** What is the operator, status and power context of Turkcell Ankara Veri Merkezi in Ankara, Ankara, TR?

**Answer it live over MCP:** `execute_plan(intent="Turkcell Ankara Veri Merkezi data center in Ankara, Ankara, TR: operator, status and grid power context")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

**Add DC Hub to your assistant:** [ChatGPT app](https://chatgpt.com/plugins/plugin_asdk_app_6add46d40f448191905e327e261ec86c) (install guide: [https://dchub.cloud/install/chatgpt](https://dchub.cloud/install/chatgpt)); [Claude connector: https://dchub.cloud/connect/claude](https://dchub.cloud/connect/claude).

**Get this live in your assistant:** DC Hub MCP at [https://dchub.cloud/mcp](https://dchub.cloud/mcp). Ask it with `execute_plan(intent="Turkcell Ankara Veri Merkezi data center in Ankara, Ankara, TR: operator, status and grid power context")`. Add to [ChatGPT](https://dchub.cloud/install/chatgpt?via=mcp) · [Claude](https://dchub.cloud/connect/claude?via=mcp) · [Cursor](https://dchub.cloud/connect?via=mcp).

Data: DC Hub global infrastructure database · [Raw JSON](https://dchub.cloud/api/v1/facilities/turkcell-turkcell-ankara-veri-merkezi-17c179a2)

Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP over Streamable HTTP at https://dchub.cloud/mcp; call `execute_plan` with this page's question for one dated, cited answer. You can also query `get_facility slug="turkcell-turkcell-ankara-veri-merkezi-17c179a2"`. Source: DC Hub (dchub.cloud), as of [the as_of date on the result]. Connect: [https://dchub.cloud/connect](https://dchub.cloud/connect) Schema, units and the population behind every count: [https://dchub.cloud/bind](https://dchub.cloud/bind)

```json
{
  "@context": "https://schema.org",
  "@type": "Place",
  "@id": "https://dchub.cloud/facilities/turkcell-turkcell-ankara-veri-merkezi-17c179a2#place",
  "url": "https://dchub.cloud/facilities/turkcell-turkcell-ankara-veri-merkezi-17c179a2",
  "name": "Turkcell Ankara Veri Merkezi",
  "description": "Data center facility operated by Turkcell in Ankara, Ankara, TR. Source: DC Hub (dchub.cloud), CC-BY-4.0.",
  "identifier": "17c179a2",
  "isAccessibleForFree": true,
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "address": {
    "@type": "PostalAddress",
    "addressLocality": "Ankara",
    "addressRegion": "Ankara",
    "addressCountry": "TR"
  },
  "additionalType": "https://schema.org/DataCenter",
  "potentialAction": {
    "@type": "Action",
    "name": "What is the operator, status and power context of Turkcell Ankara Veri Merkezi in Ankara, Ankara, TR?",
    "description": "Ask this question live over MCP with execute_plan(intent=\"Turkcell Ankara Veri Merkezi data center in Ankara, Ankara, TR: operator, status and grid power context\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].",
    "target": {
      "@type": "EntryPoint",
      "urlTemplate": "https://dchub.cloud/mcp",
      "contentType": "application/json",
      "httpMethod": "POST"
    }
  }
}
{
  "@context": "https://schema.org",
  "@type": "Dataset",
  "@id": "https://dchub.cloud/facilities/turkcell-turkcell-ankara-veri-merkezi-17c179a2#dataset",
  "name": "Turkcell Ankara Veri Merkezi \u2014 facility intelligence record",
  "description": "Structured data-center facility record (location, operator, power & connectivity context) for Turkcell Ankara Veri Merkezi.",
  "url": "https://dchub.cloud/facilities/turkcell-turkcell-ankara-veri-merkezi-17c179a2",
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "isAccessibleForFree": true,
  "creator": {
    "@type": "Organization",
    "@id": "https://dchub.cloud/#organization",
    "name": "DC Hub",
    "url": "https://dchub.cloud"
  },
  "citation": "DC Hub, dchub.cloud",
  "isBasedOn": {
    "@type": "CreativeWork",
    "name": "OpenStreetMap"
  },
  "variableMeasured": [
    {
      "@type": "PropertyValue",
      "name": "Power Capacity (band)",
      "value": "under 10 MW",
      "measurementTechnique": "Single facility record, not an aggregate. power_mw is this site's capacity as tracked by DC Hub. Summing facility MW across a market does NOT reproduce that market's published total \u2014 the market figure applies its own population, de-duplication and grouping (see the market's variableMeasured basis). Do not derive one from the other."
    },
    {
      "@type": "PropertyValue",
      "name": "Lifecycle Status",
      "value": "Operational",
      "description": "Operational lifecycle per util/status_taxonomy. A market's 'operational' population is filtered on this field."
    }
  ],
  "spatialCoverage": {
    "@id": "https://dchub.cloud/facilities/turkcell-turkcell-ankara-veri-merkezi-17c179a2#place"
  },
  "distribution": [
    {
      "@type": "DataDownload",
      "encodingFormat": "application/json",
      "contentUrl": "https://dchub.cloud/mcp"
    }
  ],
  "potentialAction": {
    "@type": "SearchAction",
    "target": {
      "@type": "EntryPoint",
      "urlTemplate": "https://dchub.cloud/api/v1/rag/search?q={search_term_string}"
    },
    "query-input": "required name=search_term_string"
  }
}
{"@context": "https://schema.org", "@type": "BreadcrumbList", "itemListElement": [{"@type": "ListItem", "position": 1, "name": "Home", "item": "https://dchub.cloud/"}, {"@type": "ListItem", "position": 2, "name": "Facilities", "item": "https://dchub.cloud/facilities"}, {"@type": "ListItem", "position": 3, "name": "Turkey", "item": "https://dchub.cloud/facilities/in/tr"}, {"@type": "ListItem", "position": 4, "name": "Turkcell Ankara Veri Merkezi", "item": "https://dchub.cloud/facilities/turkcell-turkcell-ankara-veri-merkezi-17c179a2"}]}
{"@context": "https://schema.org", "@type": "FAQPage", "mainEntity": [{"@type": "Question", "name": "What is the capacity of Turkcell Ankara Veri Merkezi?", "acceptedAnswer": {"@type": "Answer", "text": "DC Hub lists Turkcell Ankara Veri Merkezi at under 10 MW."}}, {"@type": "Question", "name": "Who operates Turkcell Ankara Veri Merkezi?", "acceptedAnswer": {"@type": "Answer", "text": "Turkcell Ankara Veri Merkezi is operated by Turkcell."}}, {"@type": "Question", "name": "What is the status of Turkcell Ankara Veri Merkezi?", "acceptedAnswer": {"@type": "Answer", "text": "DC Hub lists Turkcell Ankara Veri Merkezi as Operational."}}]}
```
