---
description: 100–500 MW under-construction data center in Seneca Falls, New York, operated by TeraWulf / Fluidstack, on the NYISO grid. Specs, nearby power & peers.
title: TeraWulf Lake Mariner CB-5 — Data Center
image: https://dchub.cloud/og-brand-v2.png
---

[Home](https://dchub.cloud/) · [Facilities](https://dchub.cloud/facilities) · [United States](https://dchub.cloud/facilities/in/us) · [New York](https://dchub.cloud/facilities/in/us/new-york "Data centers in New York") · [Syracuse](https://dchub.cloud/dcpi/syracuse) · TeraWulf Lake Mariner CB-5

# TeraWulf Lake Mariner CB-5

- Operator TeraWulf / Fluidstack
- Status Under Construction

[Seneca Falls, NY, US](https://dchub.cloud/dcpi/syracuse)

**TeraWulf Lake Mariner CB-5** is a data center operated by TeraWulf / Fluidstack in Seneca Falls, NY, US. Its reported power capacity falls in the 100–500 MW range and it is currently under construction.

Power

100–500 MW

Status

Under Construction

[Market Seneca Falls](https://dchub.cloud/dcpi/syracuse)

State

NY

[Country US](https://dchub.cloud/facilities/in/us)

Source: industry news · Added Mar 18, 2026, not re-checked since · Basis: cited ([what this means](https://dchub.cloud/data-sources))

## Market intelligence

[CAUTION](https://dchub.cloud/dcpi/syracuse "Full DCPI breakdown")

Syracuse

[ISONYISO](https://dchub.cloud/dcpi/syracuse)[DCPI composite49.2](https://dchub.cloud/dcpi/syracuse)[Excess-powerLocked](https://dchub.cloud/dcpi/syracuse)[ConstraintLocked](https://dchub.cloud/dcpi/syracuse)[Time-to-powerLocked](https://dchub.cloud/dcpi/syracuse)

[Power outlook →](https://dchub.cloud/dcpi/syracuse "Power outlook for Syracuse") [Syracuse market page →](https://dchub.cloud/markets/syracuse)

## Market context

TeraWulf Lake Mariner CB-5 is one of 14 facilities DC Hub’s Syracuse brief counts on the NYISO grid. The closest tracked facility is Greenidge Power Plant and Data Center, about 29 km away, and the nearest mapped substation is within 1 km. [Read the Syracuse market brief →](https://dchub.cloud/markets/syracuse)

## Location

Area Seneca Falls, NY, US

[Open the approximate area in OpenStreetMap](https://www.openstreetmap.org/#map=14/42.91/-76.79)

Approximate area (about 1 km)

[Sign in free to see the exact location — 10 sites a month](https://dchub.cloud/signup?next=/facilities/terawulf-fluidstack-terawulf-lake-mariner-cb-5-e605c94a)

## Market & grid context

Published DC Hub data for this location.

LocationSeneca Falls, US

Reported capacity100–500 MW

Nearest substationwithin 1 km

## Power generation nearby

DC Hub tracks 71 operating generating units totalling 1,044 MW within about 50 km of Seneca Falls, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Nuclear608 MW · 1 unit · 58%

Utility-Scale Solar217 MW · 66 units · 21%

Oil/Gas215 MW · 2 units · 21%

Wind3 MW · 2 units · 0%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

## Other data centers nearby

Nearest first, by distance from this site.

- [Greenidge Power Plant and Data Center](https://dchub.cloud/facilities/greenidge-generation-holdings-inc-greenidge-power-plant-and-data-center-dba89493) · Greenidge Generation Holdings Inc. · about 29 km

[Unlock power scores for this site →](https://dchub.cloud/pricing) [Free MCP key (AI agents)](https://dchub.cloud/ai) [Used by Claude & Cursor](https://dchub.cloud/cited-by)

**Question this page answers:** What is the operator, status and power context of TeraWulf Lake Mariner CB-5 in Seneca Falls, NY, US?

**Answer it live over MCP:** `execute_plan(intent="TeraWulf Lake Mariner CB-5 data center in Seneca Falls, NY, US: operator, status and grid power context")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

Data: DC Hub global infrastructure database · [Raw JSON](https://dchub.cloud/api/v1/facilities/terawulf-fluidstack-terawulf-lake-mariner-cb-5-e605c94a)

Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP `get_facility slug="terawulf-fluidstack-terawulf-lake-mariner-cb-5-e605c94a"` (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: [https://dchub.cloud/connect](https://dchub.cloud/connect) Schema, units and the population behind every count: [https://dchub.cloud/bind](https://dchub.cloud/bind)

```json
{
  "@context": "https://schema.org",
  "@type": "Place",
  "@id": "https://dchub.cloud/facilities/terawulf-fluidstack-terawulf-lake-mariner-cb-5-e605c94a#place",
  "url": "https://dchub.cloud/facilities/terawulf-fluidstack-terawulf-lake-mariner-cb-5-e605c94a",
  "name": "TeraWulf Lake Mariner CB-5",
  "description": "Data center facility operated by TeraWulf / Fluidstack in Seneca Falls, NY, US. Source: DC Hub (dchub.cloud), CC-BY-4.0.",
  "identifier": "e605c94a",
  "isAccessibleForFree": true,
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "address": {
    "@type": "PostalAddress",
    "addressLocality": "Seneca Falls",
    "addressRegion": "NY",
    "addressCountry": "US"
  },
  "additionalType": "https://schema.org/DataCenter",
  "potentialAction": {
    "@type": "Action",
    "name": "What is the operator, status and power context of TeraWulf Lake Mariner CB-5 in Seneca Falls, NY, US?",
    "description": "Ask this question live over MCP with execute_plan(intent=\"TeraWulf Lake Mariner CB-5 data center in Seneca Falls, NY, US: operator, status and grid power context\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].",
    "target": {
      "@type": "EntryPoint",
      "urlTemplate": "https://dchub.cloud/mcp",
      "contentType": "application/json",
      "httpMethod": "POST"
    }
  }
}
{
  "@context": "https://schema.org",
  "@type": "Dataset",
  "@id": "https://dchub.cloud/facilities/terawulf-fluidstack-terawulf-lake-mariner-cb-5-e605c94a#dataset",
  "name": "TeraWulf Lake Mariner CB-5 \u2014 facility intelligence record",
  "description": "Structured data-center facility record (location, operator, power & connectivity context) for TeraWulf Lake Mariner CB-5.",
  "url": "https://dchub.cloud/facilities/terawulf-fluidstack-terawulf-lake-mariner-cb-5-e605c94a",
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "isAccessibleForFree": true,
  "creator": {
    "@type": "Organization",
    "@id": "https://dchub.cloud/#organization",
    "name": "DC Hub",
    "url": "https://dchub.cloud"
  },
  "citation": "DC Hub, dchub.cloud",
  "isBasedOn": {
    "@type": "CreativeWork",
    "name": "industry news"
  },
  "variableMeasured": [
    {
      "@type": "PropertyValue",
      "name": "Power Capacity (band)",
      "value": "100\u2013500 MW",
      "measurementTechnique": "Single facility record, not an aggregate. power_mw is this site's capacity as tracked by DC Hub. Summing facility MW across a market does NOT reproduce that market's published total \u2014 the market figure applies its own population, de-duplication and grouping (see the market's variableMeasured basis). Do not derive one from the other."
    },
    {
      "@type": "PropertyValue",
      "name": "Lifecycle Status",
      "value": "Under Construction",
      "description": "Operational lifecycle per util/status_taxonomy. A market's 'operational' population is filtered on this field."
    }
  ],
  "spatialCoverage": {
    "@id": "https://dchub.cloud/facilities/terawulf-fluidstack-terawulf-lake-mariner-cb-5-e605c94a#place"
  },
  "distribution": [
    {
      "@type": "DataDownload",
      "encodingFormat": "application/json",
      "contentUrl": "https://dchub.cloud/mcp"
    }
  ],
  "potentialAction": {
    "@type": "SearchAction",
    "target": {
      "@type": "EntryPoint",
      "urlTemplate": "https://dchub.cloud/api/v1/rag/search?q={search_term_string}"
    },
    "query-input": "required name=search_term_string"
  }
}
{"@context": "https://schema.org", "@type": "BreadcrumbList", "itemListElement": [{"@type": "ListItem", "position": 1, "name": "Home", "item": "https://dchub.cloud/"}, {"@type": "ListItem", "position": 2, "name": "Facilities", "item": "https://dchub.cloud/facilities"}, {"@type": "ListItem", "position": 3, "name": "United States", "item": "https://dchub.cloud/facilities/in/us"}, {"@type": "ListItem", "position": 4, "name": "New York", "item": "https://dchub.cloud/facilities/in/us/new-york"}, {"@type": "ListItem", "position": 5, "name": "Syracuse", "item": "https://dchub.cloud/dcpi/syracuse"}, {"@type": "ListItem", "position": 6, "name": "TeraWulf Lake Mariner CB-5", "item": "https://dchub.cloud/facilities/terawulf-fluidstack-terawulf-lake-mariner-cb-5-e605c94a"}]}
{"@context": "https://schema.org", "@type": "FAQPage", "mainEntity": [{"@type": "Question", "name": "What is the capacity of TeraWulf Lake Mariner CB-5?", "acceptedAnswer": {"@type": "Answer", "text": "DC Hub lists TeraWulf Lake Mariner CB-5 at 100–500 MW."}}, {"@type": "Question", "name": "Who operates TeraWulf Lake Mariner CB-5?", "acceptedAnswer": {"@type": "Answer", "text": "TeraWulf Lake Mariner CB-5 is operated by TeraWulf / Fluidstack."}}, {"@type": "Question", "name": "What is the status of TeraWulf Lake Mariner CB-5?", "acceptedAnswer": {"@type": "Answer", "text": "DC Hub lists TeraWulf Lake Mariner CB-5 as Under Construction."}}]}
```
