---
description: 100–500 MW operational data center in West Jordan, Utah, operated by Novva Data Centers, on the WECC grid. 1,880 MW of operating generation within 50 km.
title: Novva West Jordan Campus Phase 1 — Data Center
image: https://dchub.cloud/og-brand-v2.png
---

[Home](https://dchub.cloud/) · [Facilities](https://dchub.cloud/facilities) · [United States](https://dchub.cloud/facilities/in/us) · [Utah](https://dchub.cloud/facilities/in/us/utah "Data centers in Utah") · [West Jordan](https://dchub.cloud/dcpi/west-jordan) · Novva West Jordan Campus Phase 1

# Novva West Jordan Campus Phase 1

- Operator Novva Data Centers
- Status Operational

[West Jordan, UT, US](https://dchub.cloud/dcpi/west-jordan)

**Novva West Jordan Campus Phase 1** is a data center operated by Novva Data Centers in West Jordan, UT, US. Its reported power capacity falls in the 100–500 MW range and it is currently operational.

Power

100–500 MW

Status

Operational

[Market Salt Lake City](https://dchub.cloud/dcpi/west-jordan)

City

West Jordan

State

UT

[Country US](https://dchub.cloud/facilities/in/us)

Source: DC Hub facilities registry · Added Mar 18, 2026, not re-checked since · Basis: cited ([what this means](https://dchub.cloud/data-sources))

## Market intelligence

[CAUTION](https://dchub.cloud/dcpi/west-jordan "Full DCPI breakdown")

West Jordan

[ISOWECC](https://dchub.cloud/dcpi/west-jordan)[DCPI composite47.3](https://dchub.cloud/dcpi/west-jordan)[Excess-powerLocked](https://dchub.cloud/dcpi/west-jordan)[ConstraintLocked](https://dchub.cloud/dcpi/west-jordan)[Time-to-powerLocked](https://dchub.cloud/dcpi/west-jordan)

[Power outlook →](https://dchub.cloud/dcpi/west-jordan "Power outlook for West Jordan") [West Jordan market page →](https://dchub.cloud/markets/west-jordan)

## Market context

Novva West Jordan Campus Phase 1 is one of 6 facilities DC Hub’s West Jordan brief counts on the WECC grid. The closest tracked facility is Aligned Salt Lake (SLC-01), about 3 km away, and the nearest mapped substation is within 5 km. [Read the West Jordan market brief →](https://dchub.cloud/markets/west-jordan)

## Location

Area West Jordan, UT, US

[Open the approximate area in OpenStreetMap](https://www.openstreetmap.org/#map=14/40.61/-111.94)

Approximate area (about 1 km)

[Sign in free to see the exact location — 10 sites a month](https://dchub.cloud/signup?next=/facilities/novva-data-centers-novva-west-jordan-campus-phase-1-b2c050c3)

## Market & grid context

Published DC Hub data for this location.

LocationWest Jordan, US

Reported capacity100–500 MW

Nearest substationwithin 5 km

## Power generation nearby

DC Hub tracks 12 operating generating units totalling 1,880 MW within about 50 km of West Jordan, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas1,870 MW · 8 units · 99%

Utility-Scale Solar6 MW · 2 units · 0%

Wind3 MW · 2 units · 0%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

## Other data centers nearby

Nearest first, by distance from this site.

- [Aligned Salt Lake (SLC-01)](https://dchub.cloud/facilities/aligned-data-centers-aligned-salt-lake-slc-01-4320c937) · Aligned Data Centers · about 3 km
- [Aligned Salt Lake (SLC-02)](https://dchub.cloud/facilities/aligned-data-centers-aligned-salt-lake-slc-02-ff47694e) · Aligned Data Centers · about 3 km
- [Flexential - Salt Lake City/South Valley (SLC09)](https://dchub.cloud/facilities/flexential-corp-flexential-salt-lake-citysouth-valley-slc09-076bc054) · Flexential Corp. · about 4 km
- [Flexential Salt Lake City - South Valley](https://dchub.cloud/facilities/flexential-flexential-salt-lake-city-south-valley-12ac812b) · Flexential · about 4 km
- [NOVVA SLC COMMON](https://dchub.cloud/facilities/novva-slc-common-3b1a6ba0) · about 9 km
- [Flexential - Salt Lake City/Millcreek (SLC10)](https://dchub.cloud/facilities/flexential-corp-flexential-salt-lake-citymillcreek-slc10-eb6a1c74) · Flexential Corp. · about 10 km

[Unlock power scores for this site →](https://dchub.cloud/pricing) [Free MCP key (AI agents)](https://dchub.cloud/ai) [Used by Claude & Cursor](https://dchub.cloud/cited-by)

**Question this page answers:** What is the operator, status and power context of Novva West Jordan Campus Phase 1 in West Jordan, UT, US?

**Answer it live over MCP:** `execute_plan(intent="Novva West Jordan Campus Phase 1 data center in West Jordan, UT, US: operator, status and grid power context")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

Data: DC Hub global infrastructure database · [Raw JSON](https://dchub.cloud/api/v1/facilities/novva-data-centers-novva-west-jordan-campus-phase-1-b2c050c3)

Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP `get_facility slug="novva-data-centers-novva-west-jordan-campus-phase-1-b2c050c3"` (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: [https://dchub.cloud/connect](https://dchub.cloud/connect) Schema, units and the population behind every count: [https://dchub.cloud/bind](https://dchub.cloud/bind)

```json
{
  "@context": "https://schema.org",
  "@type": "Place",
  "@id": "https://dchub.cloud/facilities/novva-data-centers-novva-west-jordan-campus-phase-1-b2c050c3#place",
  "url": "https://dchub.cloud/facilities/novva-data-centers-novva-west-jordan-campus-phase-1-b2c050c3",
  "name": "Novva West Jordan Campus Phase 1",
  "description": "Data center facility operated by Novva Data Centers in West Jordan, UT, US. Source: DC Hub (dchub.cloud), CC-BY-4.0.",
  "identifier": "b2c050c3",
  "isAccessibleForFree": true,
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "address": {
    "@type": "PostalAddress",
    "addressLocality": "West Jordan",
    "addressRegion": "UT",
    "addressCountry": "US"
  },
  "additionalType": "https://schema.org/DataCenter",
  "potentialAction": {
    "@type": "Action",
    "name": "What is the operator, status and power context of Novva West Jordan Campus Phase 1 in West Jordan, UT, US?",
    "description": "Ask this question live over MCP with execute_plan(intent=\"Novva West Jordan Campus Phase 1 data center in West Jordan, UT, US: operator, status and grid power context\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].",
    "target": {
      "@type": "EntryPoint",
      "urlTemplate": "https://dchub.cloud/mcp",
      "contentType": "application/json",
      "httpMethod": "POST"
    }
  }
}
{
  "@context": "https://schema.org",
  "@type": "Dataset",
  "@id": "https://dchub.cloud/facilities/novva-data-centers-novva-west-jordan-campus-phase-1-b2c050c3#dataset",
  "name": "Novva West Jordan Campus Phase 1 \u2014 facility intelligence record",
  "description": "Structured data-center facility record (location, operator, power & connectivity context) for Novva West Jordan Campus Phase 1.",
  "url": "https://dchub.cloud/facilities/novva-data-centers-novva-west-jordan-campus-phase-1-b2c050c3",
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "isAccessibleForFree": true,
  "creator": {
    "@type": "Organization",
    "@id": "https://dchub.cloud/#organization",
    "name": "DC Hub",
    "url": "https://dchub.cloud"
  },
  "citation": "DC Hub, dchub.cloud",
  "isBasedOn": {
    "@type": "CreativeWork",
    "name": "DC Hub facilities registry"
  },
  "variableMeasured": [
    {
      "@type": "PropertyValue",
      "name": "Power Capacity (band)",
      "value": "100\u2013500 MW",
      "measurementTechnique": "Single facility record, not an aggregate. power_mw is this site's capacity as tracked by DC Hub. Summing facility MW across a market does NOT reproduce that market's published total \u2014 the market figure applies its own population, de-duplication and grouping (see the market's variableMeasured basis). Do not derive one from the other."
    },
    {
      "@type": "PropertyValue",
      "name": "Lifecycle Status",
      "value": "Operational",
      "description": "Operational lifecycle per util/status_taxonomy. A market's 'operational' population is filtered on this field."
    }
  ],
  "spatialCoverage": {
    "@id": "https://dchub.cloud/facilities/novva-data-centers-novva-west-jordan-campus-phase-1-b2c050c3#place"
  },
  "distribution": [
    {
      "@type": "DataDownload",
      "encodingFormat": "application/json",
      "contentUrl": "https://dchub.cloud/mcp"
    }
  ],
  "potentialAction": {
    "@type": "SearchAction",
    "target": {
      "@type": "EntryPoint",
      "urlTemplate": "https://dchub.cloud/api/v1/rag/search?q={search_term_string}"
    },
    "query-input": "required name=search_term_string"
  }
}
{"@context": "https://schema.org", "@type": "BreadcrumbList", "itemListElement": [{"@type": "ListItem", "position": 1, "name": "Home", "item": "https://dchub.cloud/"}, {"@type": "ListItem", "position": 2, "name": "Facilities", "item": "https://dchub.cloud/facilities"}, {"@type": "ListItem", "position": 3, "name": "United States", "item": "https://dchub.cloud/facilities/in/us"}, {"@type": "ListItem", "position": 4, "name": "Utah", "item": "https://dchub.cloud/facilities/in/us/utah"}, {"@type": "ListItem", "position": 5, "name": "West Jordan", "item": "https://dchub.cloud/dcpi/west-jordan"}, {"@type": "ListItem", "position": 6, "name": "Novva West Jordan Campus Phase 1", "item": "https://dchub.cloud/facilities/novva-data-centers-novva-west-jordan-campus-phase-1-b2c050c3"}]}
{"@context": "https://schema.org", "@type": "FAQPage", "mainEntity": [{"@type": "Question", "name": "What is the capacity of Novva West Jordan Campus Phase 1?", "acceptedAnswer": {"@type": "Answer", "text": "DC Hub lists Novva West Jordan Campus Phase 1 at 100–500 MW."}}, {"@type": "Question", "name": "Who operates Novva West Jordan Campus Phase 1?", "acceptedAnswer": {"@type": "Answer", "text": "Novva West Jordan Campus Phase 1 is operated by Novva Data Centers."}}, {"@type": "Question", "name": "What is the status of Novva West Jordan Campus Phase 1?", "acceptedAnswer": {"@type": "Answer", "text": "DC Hub lists Novva West Jordan Campus Phase 1 as Operational."}}]}
```
