---
description: 50–100 MW operational data center in San Antonio, Texas, on the ERCOT grid. 3,907 MW of operating generation within 50 km. Specs, nearby power & peers.
title: Microsoft — Data Center
image: https://dchub.cloud/og-brand-v2.png
---

[Home](https://dchub.cloud/) · [Facilities](https://dchub.cloud/facilities) · [United States](https://dchub.cloud/facilities/in/us) · [Texas](https://dchub.cloud/facilities/in/us/texas "Data centers in Texas") · [San Antonio](https://dchub.cloud/dcpi/san-antonio) · Microsoft

# Microsoft

- Status Operational

[San Antonio, TX, US](https://dchub.cloud/dcpi/san-antonio)

**Microsoft** is a data center in San Antonio, TX, US. Its reported power capacity falls in the 50–100 MW range and it is currently operational.

Power

50–100 MW

Status

Operational

[Market San Antonio](https://dchub.cloud/dcpi/san-antonio)

State

TX

[Country US](https://dchub.cloud/facilities/in/us)

Source: OpenStreetMap · Added Mar 18, 2026, not re-checked since · Basis: cited ([what this means](https://dchub.cloud/data-sources))

## Market intelligence

[CAUTION](https://dchub.cloud/dcpi/san-antonio "Full DCPI breakdown")

San Antonio

[ISOERCOT](https://dchub.cloud/dcpi/san-antonio)[DCPI composite42.3](https://dchub.cloud/dcpi/san-antonio)[Excess-powerLocked](https://dchub.cloud/dcpi/san-antonio)[ConstraintLocked](https://dchub.cloud/dcpi/san-antonio)[Time-to-powerLocked](https://dchub.cloud/dcpi/san-antonio)

[Power outlook →](https://dchub.cloud/dcpi/san-antonio "Power outlook for San Antonio") [San Antonio market page →](https://dchub.cloud/markets/san-antonio)

## Market context

Microsoft is one of 78 facilities DC Hub’s San Antonio brief counts on the ERCOT grid. The closest tracked facility is Microsoft San Antonio, under 1 km away, and the nearest mapped substation is within 1 km. [Read the San Antonio market brief →](https://dchub.cloud/markets/san-antonio)

## Location

Area San Antonio, TX, US

[Open the approximate area in OpenStreetMap](https://www.openstreetmap.org/#map=14/29.48/-98.69)

Approximate area (about 1 km)

[Sign in free to see the exact location — 10 sites a month](https://dchub.cloud/signup?next=/facilities/microsoft-san-antonio-4d30b4f7)

## Market & grid context

Published DC Hub data for this location.

LocationSan Antonio, US

Reported capacity50–100 MW

Nearest substationwithin 1 km

## Fiber connectivity

Networks recorded as present at or immediately around Microsoft in public peering records. Treat this as a map of who is *there*, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

Microsoft

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

## Power generation nearby

DC Hub tracks 29 operating generating units totalling 3,907 MW within about 50 km of San Antonio, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas2,356 MW · 12 units · 60%

Coal1,444 MW · 2 units · 37%

Utility-Scale Solar107 MW · 15 units · 3%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

## Other data centers nearby

Nearest first, by distance from this site.

- [Microsoft San Antonio](https://dchub.cloud/facilities/microsoft-microsoft-san-antonio-8a993c98) · Microsoft · 50–100 MW · under 1 km
- [Vantage Data Centers TX21](https://dchub.cloud/facilities/vantage-data-centers-vantage-data-centers-tx21-20ff7f70) · Vantage Data Centers · under 1 km
- [Vantage Data Centers TX22](https://dchub.cloud/facilities/vantage-data-centers-vantage-data-centers-tx22-28ad71fb) · Vantage Data Centers · under 1 km
- [CHRISTUS Health](https://dchub.cloud/facilities/christus-health-christus-health-4f39811a) · under 10 MW · about 1 km
- [CyrusOne San Antonio](https://dchub.cloud/facilities/cyrusone-inc-cyrusone-san-antonio-4127e1af) · CyrusOne Inc. · about 1 km
- [CyrusOne San Antonio I](https://dchub.cloud/facilities/cyrusone-cyrusone-san-antonio-i-cc095c13) · CyrusOne · 10–50 MW · about 1 km

[Unlock power scores for this site →](https://dchub.cloud/pricing) [Free MCP key (AI agents)](https://dchub.cloud/ai) [Used by Claude & Cursor](https://dchub.cloud/cited-by)

**Question this page answers:** What is the operator, status and power context of Microsoft in San Antonio, TX, US?

**Answer it live over MCP:** `execute_plan(intent="Microsoft data center in San Antonio, TX, US: operator, status and grid power context")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

Data: DC Hub global infrastructure database · [Raw JSON](https://dchub.cloud/api/v1/facilities/microsoft-san-antonio-4d30b4f7)

Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP `get_facility slug="microsoft-san-antonio-4d30b4f7"` (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: [https://dchub.cloud/connect](https://dchub.cloud/connect) Schema, units and the population behind every count: [https://dchub.cloud/bind](https://dchub.cloud/bind)

```json
{
  "@context": "https://schema.org",
  "@type": "Place",
  "@id": "https://dchub.cloud/facilities/microsoft-san-antonio-4d30b4f7#place",
  "url": "https://dchub.cloud/facilities/microsoft-san-antonio-4d30b4f7",
  "name": "Microsoft",
  "description": "Data center facility operated by Microsoft in San Antonio, TX, US. Source: DC Hub (dchub.cloud), CC-BY-4.0.",
  "identifier": "4d30b4f7",
  "isAccessibleForFree": true,
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "address": {
    "@type": "PostalAddress",
    "addressLocality": "San Antonio",
    "addressRegion": "TX",
    "addressCountry": "US"
  },
  "additionalType": "https://schema.org/DataCenter",
  "potentialAction": {
    "@type": "Action",
    "name": "What is the operator, status and power context of Microsoft in San Antonio, TX, US?",
    "description": "Ask this question live over MCP with execute_plan(intent=\"Microsoft data center in San Antonio, TX, US: operator, status and grid power context\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].",
    "target": {
      "@type": "EntryPoint",
      "urlTemplate": "https://dchub.cloud/mcp",
      "contentType": "application/json",
      "httpMethod": "POST"
    }
  }
}
{
  "@context": "https://schema.org",
  "@type": "Dataset",
  "@id": "https://dchub.cloud/facilities/microsoft-san-antonio-4d30b4f7#dataset",
  "name": "Microsoft \u2014 facility intelligence record",
  "description": "Structured data-center facility record (location, operator, power & connectivity context) for Microsoft.",
  "url": "https://dchub.cloud/facilities/microsoft-san-antonio-4d30b4f7",
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "isAccessibleForFree": true,
  "creator": {
    "@type": "Organization",
    "@id": "https://dchub.cloud/#organization",
    "name": "DC Hub",
    "url": "https://dchub.cloud"
  },
  "citation": "DC Hub, dchub.cloud",
  "isBasedOn": {
    "@type": "CreativeWork",
    "name": "OpenStreetMap"
  },
  "variableMeasured": [
    {
      "@type": "PropertyValue",
      "name": "Power Capacity (band)",
      "value": "50\u2013100 MW",
      "measurementTechnique": "Single facility record, not an aggregate. power_mw is this site's capacity as tracked by DC Hub. Summing facility MW across a market does NOT reproduce that market's published total \u2014 the market figure applies its own population, de-duplication and grouping (see the market's variableMeasured basis). Do not derive one from the other."
    },
    {
      "@type": "PropertyValue",
      "name": "Lifecycle Status",
      "value": "Operational",
      "description": "Operational lifecycle per util/status_taxonomy. A market's 'operational' population is filtered on this field."
    }
  ],
  "spatialCoverage": {
    "@id": "https://dchub.cloud/facilities/microsoft-san-antonio-4d30b4f7#place"
  },
  "distribution": [
    {
      "@type": "DataDownload",
      "encodingFormat": "application/json",
      "contentUrl": "https://dchub.cloud/mcp"
    }
  ],
  "potentialAction": {
    "@type": "SearchAction",
    "target": {
      "@type": "EntryPoint",
      "urlTemplate": "https://dchub.cloud/api/v1/rag/search?q={search_term_string}"
    },
    "query-input": "required name=search_term_string"
  }
}
{"@context": "https://schema.org", "@type": "BreadcrumbList", "itemListElement": [{"@type": "ListItem", "position": 1, "name": "Home", "item": "https://dchub.cloud/"}, {"@type": "ListItem", "position": 2, "name": "Facilities", "item": "https://dchub.cloud/facilities"}, {"@type": "ListItem", "position": 3, "name": "United States", "item": "https://dchub.cloud/facilities/in/us"}, {"@type": "ListItem", "position": 4, "name": "Texas", "item": "https://dchub.cloud/facilities/in/us/texas"}, {"@type": "ListItem", "position": 5, "name": "San Antonio", "item": "https://dchub.cloud/dcpi/san-antonio"}, {"@type": "ListItem", "position": 6, "name": "Microsoft", "item": "https://dchub.cloud/facilities/microsoft-san-antonio-4d30b4f7"}]}
{"@context": "https://schema.org", "@type": "FAQPage", "mainEntity": [{"@type": "Question", "name": "What is the capacity of Microsoft?", "acceptedAnswer": {"@type": "Answer", "text": "DC Hub lists Microsoft at 50–100 MW."}}, {"@type": "Question", "name": "What is the status of Microsoft?", "acceptedAnswer": {"@type": "Answer", "text": "DC Hub lists Microsoft as Operational."}}]}
```
