---
description: 100–500 MW operational data center in Mount Pleasant, Wisconsin, operated by Microsoft, on the MISO grid. 3,553 MW of operating generation within 50 km.
title: Microsoft Mount Pleasant Phase 1 — Data Center
image: https://dchub.cloud/og-brand-v2.png
---

[Home](https://dchub.cloud/) · [Facilities](https://dchub.cloud/facilities) · [United States](https://dchub.cloud/facilities/in/us) · [Wisconsin](https://dchub.cloud/facilities/in/us/wisconsin "Data centers in Wisconsin") · [Mount Pleasant](https://dchub.cloud/dcpi/mount-pleasant) · Mount Pleasant Phase 1

# Microsoft Mount Pleasant Phase 1

- Operator Microsoft
- Status Operational

[Mount Pleasant, WI, US](https://dchub.cloud/dcpi/mount-pleasant)

**Mount Pleasant Phase 1** is a data center operated by Microsoft in Mount Pleasant, WI, US. Its reported power capacity falls in the 100–500 MW range and it is currently operational.

Power

100–500 MW

Status

Operational

City

Mount Pleasant

State

WI

[Country US](https://dchub.cloud/facilities/in/us)

Source: DC Hub facilities registry · Added Mar 28, 2026, not re-checked since · Basis: cited ([what this means](https://dchub.cloud/data-sources))

## Market intelligence

[CAUTION](https://dchub.cloud/dcpi/mount-pleasant "Full DCPI breakdown")

Mount Pleasant

[ISOMISO](https://dchub.cloud/dcpi/mount-pleasant)[DCPI composite49.4](https://dchub.cloud/dcpi/mount-pleasant)[Excess-powerLocked](https://dchub.cloud/dcpi/mount-pleasant)[ConstraintLocked](https://dchub.cloud/dcpi/mount-pleasant)[Time-to-powerLocked](https://dchub.cloud/dcpi/mount-pleasant)

[Power outlook →](https://dchub.cloud/dcpi/mount-pleasant "Power outlook for Mount Pleasant") [Mount Pleasant market page →](https://dchub.cloud/markets/mount-pleasant)

## Market context

Microsoft Mount Pleasant Phase 1 is one of 10 facilities DC Hub’s Mount Pleasant brief counts on the MISO grid. The closest tracked facility is Microsoft Mount Pleasant AI Campus, about 1 km away, and the nearest mapped substation is within 1 km. [Read the Mount Pleasant market brief →](https://dchub.cloud/markets/mount-pleasant)

## Location

Area Mount Pleasant, WI, US

[Open the approximate area in OpenStreetMap](https://www.openstreetmap.org/#map=14/42.71/-87.87)

Approximate area (about 1 km)

[Sign in free to see the exact location — 10 sites a month](https://dchub.cloud/signup?next=/facilities/microsoft-mount-pleasant-phase-1-c4d0c3b7)

## Market & grid context

Published DC Hub data for this location.

LocationMount Pleasant, US

Reported capacity100–500 MW

Nearest substationwithin 1 km

## Power generation nearby

DC Hub tracks 34 operating generating units totalling 3,553 MW within about 50 km of Mount Pleasant, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Coal2,044 MW · 4 units · 58%

Oil/Gas1,249 MW · 9 units · 35%

Utility-Scale Solar257 MW · 19 units · 7%

Wind3 MW · 2 units · 0%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

## Other data centers nearby

Nearest first, by distance from this site.

- [Microsoft Mount Pleasant AI Campus](https://dchub.cloud/facilities/microsoft-microsoft-mount-pleasant-ai-campus-ed53212e) · Microsoft · 1–5 GW · about 1 km
- [Microsoft Mount Pleasant WI Phase 2](https://dchub.cloud/facilities/microsoft-microsoft-mount-pleasant-wi-phase-2-2e632088) · Microsoft · 100–500 MW · about 2 km
- [Microsoft Wisconsin AI Campus](https://dchub.cloud/facilities/microsoft-microsoft-wisconsin-ai-campus-32e33ef5) · Microsoft · 1–5 GW · about 3 km
- [MICROSOFT CORPORATION - MKE 3B DATA CENTER](https://dchub.cloud/facilities/microsoft-corporation-mke-3b-data-center-e9f96a3e) · Microsoft · about 4 km
- [OSM DC 1510420026](https://dchub.cloud/facilities/unknown-osm-dc-1510420026-fa460223) · Unknown · about 5 km
- [Data Center 919948160](https://dchub.cloud/facilities/data-center-919948160-026fd4d6) · about 5 km

[Unlock power scores for this site →](https://dchub.cloud/pricing) [Free MCP key (AI agents)](https://dchub.cloud/ai) [Used by Claude & Cursor](https://dchub.cloud/cited-by)

**Question this page answers:** What is the operator, status and power context of Microsoft Mount Pleasant Phase 1 in Mount Pleasant, WI, US?

**Answer it live over MCP:** `execute_plan(intent="Microsoft Mount Pleasant Phase 1 data center in Mount Pleasant, WI, US: operator, status and grid power context")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

**Add DC Hub to your assistant:** [ChatGPT app](https://chatgpt.com/plugins/plugin_asdk_app_6add46d40f448191905e327e261ec86c) (install guide: [https://dchub.cloud/install/chatgpt](https://dchub.cloud/install/chatgpt)); [Claude connector: https://dchub.cloud/connect/claude](https://dchub.cloud/connect/claude).

**Get this live in your assistant:** DC Hub MCP at [https://dchub.cloud/mcp](https://dchub.cloud/mcp). Ask it with `execute_plan(intent="Microsoft Mount Pleasant Phase 1 data center in Mount Pleasant, WI, US: operator, status and grid power context")`. Add to [ChatGPT](https://dchub.cloud/install/chatgpt?via=mcp) · [Claude](https://dchub.cloud/connect/claude?via=mcp) · [Cursor](https://dchub.cloud/connect?via=mcp).

Data: DC Hub global infrastructure database · [Raw JSON](https://dchub.cloud/api/v1/facilities/microsoft-mount-pleasant-phase-1-c4d0c3b7)

Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP over Streamable HTTP at https://dchub.cloud/mcp; call `execute_plan` with this page's question for one dated, cited answer. You can also query `get_facility slug="microsoft-mount-pleasant-phase-1-c4d0c3b7"`. Source: DC Hub (dchub.cloud), as of [the as_of date on the result]. Connect: [https://dchub.cloud/connect](https://dchub.cloud/connect) Schema, units and the population behind every count: [https://dchub.cloud/bind](https://dchub.cloud/bind)

```json
{
  "@context": "https://schema.org",
  "@type": "Place",
  "@id": "https://dchub.cloud/facilities/microsoft-mount-pleasant-phase-1-c4d0c3b7#place",
  "url": "https://dchub.cloud/facilities/microsoft-mount-pleasant-phase-1-c4d0c3b7",
  "name": "Microsoft Mount Pleasant Phase 1",
  "description": "Data center facility operated by Microsoft in Mount Pleasant, WI, US. Source: DC Hub (dchub.cloud), CC-BY-4.0.",
  "identifier": "c4d0c3b7",
  "isAccessibleForFree": true,
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "address": {
    "@type": "PostalAddress",
    "addressLocality": "Mount Pleasant",
    "addressRegion": "WI",
    "addressCountry": "US"
  },
  "additionalType": "https://schema.org/DataCenter",
  "potentialAction": {
    "@type": "Action",
    "name": "What is the operator, status and power context of Microsoft Mount Pleasant Phase 1 in Mount Pleasant, WI, US?",
    "description": "Ask this question live over MCP with execute_plan(intent=\"Microsoft Mount Pleasant Phase 1 data center in Mount Pleasant, WI, US: operator, status and grid power context\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].",
    "target": {
      "@type": "EntryPoint",
      "urlTemplate": "https://dchub.cloud/mcp",
      "contentType": "application/json",
      "httpMethod": "POST"
    }
  }
}
{
  "@context": "https://schema.org",
  "@type": "Dataset",
  "@id": "https://dchub.cloud/facilities/microsoft-mount-pleasant-phase-1-c4d0c3b7#dataset",
  "name": "Microsoft Mount Pleasant Phase 1 \u2014 facility intelligence record",
  "description": "Structured data-center facility record (location, operator, power & connectivity context) for Microsoft Mount Pleasant Phase 1.",
  "url": "https://dchub.cloud/facilities/microsoft-mount-pleasant-phase-1-c4d0c3b7",
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "isAccessibleForFree": true,
  "creator": {
    "@type": "Organization",
    "@id": "https://dchub.cloud/#organization",
    "name": "DC Hub",
    "url": "https://dchub.cloud"
  },
  "citation": "DC Hub, dchub.cloud",
  "isBasedOn": {
    "@type": "CreativeWork",
    "name": "DC Hub facilities registry"
  },
  "variableMeasured": [
    {
      "@type": "PropertyValue",
      "name": "Power Capacity (band)",
      "value": "100\u2013500 MW",
      "measurementTechnique": "Single facility record, not an aggregate. power_mw is this site's capacity as tracked by DC Hub. Summing facility MW across a market does NOT reproduce that market's published total \u2014 the market figure applies its own population, de-duplication and grouping (see the market's variableMeasured basis). Do not derive one from the other."
    },
    {
      "@type": "PropertyValue",
      "name": "Lifecycle Status",
      "value": "Operational",
      "description": "Operational lifecycle per util/status_taxonomy. A market's 'operational' population is filtered on this field."
    }
  ],
  "spatialCoverage": {
    "@id": "https://dchub.cloud/facilities/microsoft-mount-pleasant-phase-1-c4d0c3b7#place"
  },
  "distribution": [
    {
      "@type": "DataDownload",
      "encodingFormat": "application/json",
      "contentUrl": "https://dchub.cloud/mcp"
    }
  ],
  "potentialAction": {
    "@type": "SearchAction",
    "target": {
      "@type": "EntryPoint",
      "urlTemplate": "https://dchub.cloud/api/v1/rag/search?q={search_term_string}"
    },
    "query-input": "required name=search_term_string"
  }
}
{"@context": "https://schema.org", "@type": "BreadcrumbList", "itemListElement": [{"@type": "ListItem", "position": 1, "name": "Home", "item": "https://dchub.cloud/"}, {"@type": "ListItem", "position": 2, "name": "Facilities", "item": "https://dchub.cloud/facilities"}, {"@type": "ListItem", "position": 3, "name": "United States", "item": "https://dchub.cloud/facilities/in/us"}, {"@type": "ListItem", "position": 4, "name": "Wisconsin", "item": "https://dchub.cloud/facilities/in/us/wisconsin"}, {"@type": "ListItem", "position": 5, "name": "Mount Pleasant", "item": "https://dchub.cloud/dcpi/mount-pleasant"}, {"@type": "ListItem", "position": 6, "name": "Mount Pleasant Phase 1", "item": "https://dchub.cloud/facilities/microsoft-mount-pleasant-phase-1-c4d0c3b7"}]}
{"@context": "https://schema.org", "@type": "FAQPage", "mainEntity": [{"@type": "Question", "name": "What is the capacity of Mount Pleasant Phase 1?", "acceptedAnswer": {"@type": "Answer", "text": "DC Hub lists Mount Pleasant Phase 1 at 100–500 MW."}}, {"@type": "Question", "name": "Who operates Mount Pleasant Phase 1?", "acceptedAnswer": {"@type": "Answer", "text": "Mount Pleasant Phase 1 is operated by Microsoft."}}, {"@type": "Question", "name": "What is the status of Mount Pleasant Phase 1?", "acceptedAnswer": {"@type": "Answer", "text": "DC Hub lists Mount Pleasant Phase 1 as Operational."}}]}
```

Live, dated answers for this facility: connect an assistant to https://dchub.cloud/mcp and call execute_plan.
