---
description: 10–50 MW under-construction data center in Gallatin, Tennessee, operated by Meta, on the TVA grid. Specs, nearby power and peer sites on DC Hub.
title: Meta Gallatin Building 3 — Data Center
image: https://dchub.cloud/og-brand-v2.png
---

[Home](https://dchub.cloud/) · [Facilities](https://dchub.cloud/facilities) · [United States](https://dchub.cloud/facilities/in/us) · [Tennessee](https://dchub.cloud/facilities/in/us/tennessee "Data centers in Tennessee") · [Knoxville](https://dchub.cloud/dcpi/knoxville) · Meta Gallatin Building 3

# Meta Gallatin Building 3

- Operator Meta
- Status Under Construction

[Gallatin, TN, US](https://dchub.cloud/dcpi/knoxville)

**Meta Gallatin Building 3** is a data center operated by Meta in Gallatin, TN, US. Its reported power capacity falls in the 10–50 MW range and it is currently under construction.

Power

10–50 MW

Status

Under Construction

[Market Gallatin](https://dchub.cloud/dcpi/knoxville)

State

TN

[Country US](https://dchub.cloud/facilities/in/us)

Source: DC Hub facilities registry · Added Mar 18, 2026, not re-checked since · Basis: cited ([what this means](https://dchub.cloud/data-sources))

## Market intelligence

[AVOID](https://dchub.cloud/dcpi/knoxville "Full DCPI breakdown")

Knoxville

[ISOTVA](https://dchub.cloud/dcpi/knoxville)[DCPI composite30.4](https://dchub.cloud/dcpi/knoxville)[Excess-powerLocked](https://dchub.cloud/dcpi/knoxville)[ConstraintLocked](https://dchub.cloud/dcpi/knoxville)[Time-to-powerLocked](https://dchub.cloud/dcpi/knoxville)

[Power outlook →](https://dchub.cloud/dcpi/knoxville "Power outlook for Knoxville") [Knoxville market page →](https://dchub.cloud/markets/knoxville)

## Market context

Meta Gallatin Building 3 is one of 7 facilities DC Hub’s Knoxville brief counts on the TVA grid. [Read the Knoxville market brief →](https://dchub.cloud/markets/knoxville)

## Location

Area Gallatin, TN, US

Exact location not on record.

## Market & grid context

Published DC Hub data for this location.

LocationGallatin, US

Reported capacity10–50 MW

## Other data centers nearby

Tracked by DC Hub in Gallatin.

- [WOOLHAWK LLC](https://dchub.cloud/facilities/woolhawk-llc-e6525398)
- [Xai Memphis TN Data Center](https://dchub.cloud/facilities/xai-xai-memphis-tn-data-center-9945f4eb) · Xai · 1–5 GW
- [Meta Gallatin Data Center](https://dchub.cloud/facilities/meta-meta-gallatin-data-center-49edb703) · Meta · 100–500 MW
- [SPC4A](https://dchub.cloud/facilities/google-spc4a-2660c013) · Google · 50–100 MW
- [SPC3A](https://dchub.cloud/facilities/google-spc3a-d83d3d04) · Google · 50–100 MW
- [DC BLOX Chattanooga](https://dchub.cloud/facilities/dc-blox-dc-blox-chattanooga-01b0fc04) · DC BLOX · 10–50 MW

[Unlock power scores for this site →](https://dchub.cloud/pricing) [Free MCP key (AI agents)](https://dchub.cloud/ai) [Used by Claude & Cursor](https://dchub.cloud/cited-by)

**Question this page answers:** What is the operator, status and power context of Meta Gallatin Building 3 in Gallatin, TN, US?

**Answer it live over MCP:** `execute_plan(intent="Meta Gallatin Building 3 data center in Gallatin, TN, US: operator, status and grid power context")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

**Add DC Hub to your assistant:** [ChatGPT app](https://chatgpt.com/plugins/plugin_asdk_app_6add46d40f448191905e327e261ec86c) (install guide: [https://dchub.cloud/install/chatgpt](https://dchub.cloud/install/chatgpt)); [Claude connector: https://dchub.cloud/connect/claude](https://dchub.cloud/connect/claude).

**Get this live in your assistant:** DC Hub MCP at [https://dchub.cloud/mcp](https://dchub.cloud/mcp). Ask it with `execute_plan(intent="Meta Gallatin Building 3 data center in Gallatin, TN, US: operator, status and grid power context")`. Add to [ChatGPT](https://dchub.cloud/install/chatgpt?via=mcp) · [Claude](https://dchub.cloud/connect/claude?via=mcp) · [Cursor](https://dchub.cloud/connect?via=mcp).

Data: DC Hub global infrastructure database · [Raw JSON](https://dchub.cloud/api/v1/facilities/meta-meta-gallatin-building-3-436496f6)

Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP over Streamable HTTP at https://dchub.cloud/mcp; call `execute_plan` with this page's question for one dated, cited answer. You can also query `get_facility slug="meta-meta-gallatin-building-3-436496f6"`. Source: DC Hub (dchub.cloud), as of [the as_of date on the result]. Connect: [https://dchub.cloud/connect](https://dchub.cloud/connect) Schema, units and the population behind every count: [https://dchub.cloud/bind](https://dchub.cloud/bind)

```json
{
  "@context": "https://schema.org",
  "@type": "Place",
  "@id": "https://dchub.cloud/facilities/meta-meta-gallatin-building-3-436496f6#place",
  "url": "https://dchub.cloud/facilities/meta-meta-gallatin-building-3-436496f6",
  "name": "Meta Gallatin Building 3",
  "description": "Data center facility operated by Meta in Gallatin, TN, US. Source: DC Hub (dchub.cloud), CC-BY-4.0.",
  "identifier": "436496f6",
  "isAccessibleForFree": true,
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "address": {
    "@type": "PostalAddress",
    "addressLocality": "Gallatin",
    "addressRegion": "TN",
    "addressCountry": "US"
  },
  "additionalType": "https://schema.org/DataCenter",
  "potentialAction": {
    "@type": "Action",
    "name": "What is the operator, status and power context of Meta Gallatin Building 3 in Gallatin, TN, US?",
    "description": "Ask this question live over MCP with execute_plan(intent=\"Meta Gallatin Building 3 data center in Gallatin, TN, US: operator, status and grid power context\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].",
    "target": {
      "@type": "EntryPoint",
      "urlTemplate": "https://dchub.cloud/mcp",
      "contentType": "application/json",
      "httpMethod": "POST"
    }
  }
}
{
  "@context": "https://schema.org",
  "@type": "Dataset",
  "@id": "https://dchub.cloud/facilities/meta-meta-gallatin-building-3-436496f6#dataset",
  "name": "Meta Gallatin Building 3 \u2014 facility intelligence record",
  "description": "Structured data-center facility record (location, operator, power & connectivity context) for Meta Gallatin Building 3.",
  "url": "https://dchub.cloud/facilities/meta-meta-gallatin-building-3-436496f6",
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "isAccessibleForFree": true,
  "creator": {
    "@type": "Organization",
    "@id": "https://dchub.cloud/#organization",
    "name": "DC Hub",
    "url": "https://dchub.cloud"
  },
  "citation": "DC Hub, dchub.cloud",
  "isBasedOn": {
    "@type": "CreativeWork",
    "name": "DC Hub facilities registry"
  },
  "variableMeasured": [
    {
      "@type": "PropertyValue",
      "name": "Power Capacity (band)",
      "value": "10\u201350 MW",
      "measurementTechnique": "Single facility record, not an aggregate. power_mw is this site's capacity as tracked by DC Hub. Summing facility MW across a market does NOT reproduce that market's published total \u2014 the market figure applies its own population, de-duplication and grouping (see the market's variableMeasured basis). Do not derive one from the other."
    },
    {
      "@type": "PropertyValue",
      "name": "Lifecycle Status",
      "value": "Under Construction",
      "description": "Operational lifecycle per util/status_taxonomy. A market's 'operational' population is filtered on this field."
    }
  ],
  "spatialCoverage": {
    "@id": "https://dchub.cloud/facilities/meta-meta-gallatin-building-3-436496f6#place"
  },
  "distribution": [
    {
      "@type": "DataDownload",
      "encodingFormat": "application/json",
      "contentUrl": "https://dchub.cloud/mcp"
    }
  ],
  "potentialAction": {
    "@type": "SearchAction",
    "target": {
      "@type": "EntryPoint",
      "urlTemplate": "https://dchub.cloud/api/v1/rag/search?q={search_term_string}"
    },
    "query-input": "required name=search_term_string"
  }
}
{"@context": "https://schema.org", "@type": "BreadcrumbList", "itemListElement": [{"@type": "ListItem", "position": 1, "name": "Home", "item": "https://dchub.cloud/"}, {"@type": "ListItem", "position": 2, "name": "Facilities", "item": "https://dchub.cloud/facilities"}, {"@type": "ListItem", "position": 3, "name": "United States", "item": "https://dchub.cloud/facilities/in/us"}, {"@type": "ListItem", "position": 4, "name": "Tennessee", "item": "https://dchub.cloud/facilities/in/us/tennessee"}, {"@type": "ListItem", "position": 5, "name": "Knoxville", "item": "https://dchub.cloud/dcpi/knoxville"}, {"@type": "ListItem", "position": 6, "name": "Meta Gallatin Building 3", "item": "https://dchub.cloud/facilities/meta-meta-gallatin-building-3-436496f6"}]}
{"@context": "https://schema.org", "@type": "FAQPage", "mainEntity": [{"@type": "Question", "name": "What is the capacity of Meta Gallatin Building 3?", "acceptedAnswer": {"@type": "Answer", "text": "DC Hub lists Meta Gallatin Building 3 at 10–50 MW."}}, {"@type": "Question", "name": "Who operates Meta Gallatin Building 3?", "acceptedAnswer": {"@type": "Answer", "text": "Meta Gallatin Building 3 is operated by Meta."}}, {"@type": "Question", "name": "What is the status of Meta Gallatin Building 3?", "acceptedAnswer": {"@type": "Answer", "text": "DC Hub lists Meta Gallatin Building 3 as Under Construction."}}]}
```
