---
description: 1–5 GW planned data center in El Paso, United States, operated by Meta, on the WECC grid. 5,145 MW of operating generation within 50 km.
title: Meta El Paso, Texas — Data Center
image: https://dchub.cloud/og-brand-v2.png
---

[Home](https://dchub.cloud/) · [Facilities](https://dchub.cloud/facilities) · [United States](https://dchub.cloud/facilities/in/us) · [El Paso](https://dchub.cloud/dcpi/el-paso) · Meta El Paso, Texas

# Meta El Paso, Texas

- Operator Meta
- Status Planned

[El Paso, US](https://dchub.cloud/dcpi/el-paso)

**Meta El Paso, Texas** is a data center operated by Meta in El Paso, US. Its reported power capacity falls in the 1–5 GW range and it is currently planned.

Power

1–5 GW

Status

Planned

City

El Paso

[Country US](https://dchub.cloud/facilities/in/us)

Source: DC Hub facilities registry · Added May 4, 2026, not re-checked since · Basis: cited ([what this means](https://dchub.cloud/data-sources))

## Market intelligence

[BUILD](https://dchub.cloud/dcpi/el-paso "Full DCPI breakdown")

El Paso

[ISOWECC](https://dchub.cloud/dcpi/el-paso)[DCPI composite67.4](https://dchub.cloud/dcpi/el-paso)[Excess-powerLocked](https://dchub.cloud/dcpi/el-paso)[ConstraintLocked](https://dchub.cloud/dcpi/el-paso)[Time-to-powerLocked](https://dchub.cloud/dcpi/el-paso)

[Power outlook →](https://dchub.cloud/dcpi/el-paso "Power outlook for El Paso") [El Paso market page →](https://dchub.cloud/markets/el-paso)

## Market context

Meta El Paso, Texas is one of 24 facilities DC Hub’s El Paso brief counts on the WECC grid. The closest tracked facility is Meta El Paso Data Center, under 1 km away, and the nearest mapped substation is within 5 km. [Read the El Paso market brief →](https://dchub.cloud/markets/el-paso)

## Location

Area El Paso, US

[Open the approximate area in OpenStreetMap](https://www.openstreetmap.org/#map=14/31.76/-106.48)

Approximate area (about 1 km)

[Sign in free to see the exact location — 10 sites a month](https://dchub.cloud/signup?next=/facilities/meta-meta-el-paso-texas-0b4fe846)

## Market & grid context

Published DC Hub data for this location.

LocationEl Paso, US

Reported capacity1–5 GW

Nearest substationwithin 5 km

## Power generation nearby

DC Hub tracks 37 operating generating units totalling 5,145 MW within about 50 km of El Paso, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas4,483 MW · 24 units · 87%

Utility-Scale Solar662 MW · 13 units · 13%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

## Other data centers nearby

Nearest first, by distance from this site.

- [Meta El Paso Data Center](https://dchub.cloud/facilities/meta-meta-el-paso-data-center-89a081b6) · Meta · under 10 MW · under 1 km
- [MDC](https://dchub.cloud/facilities/unknown-mdc-3588910b) · Unknown · about 16 km
- [MDC El Paso](https://dchub.cloud/facilities/mdc-data-centers-mdc-el-paso-e2a5dc8b) · MDC Data Centers · about 16 km

[Unlock power scores for this site →](https://dchub.cloud/pricing) [Free MCP key (AI agents)](https://dchub.cloud/ai) [Used by Claude & Cursor](https://dchub.cloud/cited-by)

**Question this page answers:** What is the operator, status and power context of Meta El Paso, Texas in El Paso, US?

**Answer it live over MCP:** `execute_plan(intent="Meta El Paso, Texas data center in El Paso, US: operator, status and grid power context")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

**Add DC Hub to your assistant:** [ChatGPT app](https://chatgpt.com/plugins/plugin_asdk_app_6add46d40f448191905e327e261ec86c) (install guide: [https://dchub.cloud/install/chatgpt](https://dchub.cloud/install/chatgpt)); [Claude connector: https://dchub.cloud/connect/claude](https://dchub.cloud/connect/claude).

**Get this live in your assistant:** DC Hub MCP at [https://dchub.cloud/mcp](https://dchub.cloud/mcp). Ask it with `execute_plan(intent="Meta El Paso, Texas data center in El Paso, US: operator, status and grid power context")`. Add to [ChatGPT](https://dchub.cloud/install/chatgpt?via=mcp) · [Claude](https://dchub.cloud/connect/claude?via=mcp) · [Cursor](https://dchub.cloud/connect?via=mcp).

Data: DC Hub global infrastructure database · [Raw JSON](https://dchub.cloud/api/v1/facilities/meta-meta-el-paso-texas-0b4fe846)

Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP over Streamable HTTP at https://dchub.cloud/mcp; call `execute_plan` with this page's question for one dated, cited answer. You can also query `get_facility slug="meta-meta-el-paso-texas-0b4fe846"`. Source: DC Hub (dchub.cloud), as of [the as_of date on the result]. Connect: [https://dchub.cloud/connect](https://dchub.cloud/connect) Schema, units and the population behind every count: [https://dchub.cloud/bind](https://dchub.cloud/bind)

```json
{
  "@context": "https://schema.org",
  "@type": "Place",
  "@id": "https://dchub.cloud/facilities/meta-meta-el-paso-texas-0b4fe846#place",
  "url": "https://dchub.cloud/facilities/meta-meta-el-paso-texas-0b4fe846",
  "name": "Meta El Paso, Texas",
  "description": "Data center facility operated by Meta in El Paso, US. Source: DC Hub (dchub.cloud), CC-BY-4.0.",
  "identifier": "0b4fe846",
  "isAccessibleForFree": true,
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "address": {
    "@type": "PostalAddress",
    "addressLocality": "El Paso",
    "addressCountry": "US"
  },
  "additionalType": "https://schema.org/DataCenter",
  "potentialAction": {
    "@type": "Action",
    "name": "What is the operator, status and power context of Meta El Paso, Texas in El Paso, US?",
    "description": "Ask this question live over MCP with execute_plan(intent=\"Meta El Paso, Texas data center in El Paso, US: operator, status and grid power context\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].",
    "target": {
      "@type": "EntryPoint",
      "urlTemplate": "https://dchub.cloud/mcp",
      "contentType": "application/json",
      "httpMethod": "POST"
    }
  }
}
{
  "@context": "https://schema.org",
  "@type": "Dataset",
  "@id": "https://dchub.cloud/facilities/meta-meta-el-paso-texas-0b4fe846#dataset",
  "name": "Meta El Paso, Texas \u2014 facility intelligence record",
  "description": "Structured data-center facility record (location, operator, power & connectivity context) for Meta El Paso, Texas.",
  "url": "https://dchub.cloud/facilities/meta-meta-el-paso-texas-0b4fe846",
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "isAccessibleForFree": true,
  "creator": {
    "@type": "Organization",
    "@id": "https://dchub.cloud/#organization",
    "name": "DC Hub",
    "url": "https://dchub.cloud"
  },
  "citation": "DC Hub, dchub.cloud",
  "isBasedOn": {
    "@type": "CreativeWork",
    "name": "DC Hub facilities registry"
  },
  "variableMeasured": [
    {
      "@type": "PropertyValue",
      "name": "Power Capacity (band)",
      "value": "1\u20135 GW",
      "measurementTechnique": "Single facility record, not an aggregate. power_mw is this site's capacity as tracked by DC Hub. Summing facility MW across a market does NOT reproduce that market's published total \u2014 the market figure applies its own population, de-duplication and grouping (see the market's variableMeasured basis). Do not derive one from the other."
    },
    {
      "@type": "PropertyValue",
      "name": "Lifecycle Status",
      "value": "Planned",
      "description": "Operational lifecycle per util/status_taxonomy. A market's 'operational' population is filtered on this field."
    }
  ],
  "spatialCoverage": {
    "@id": "https://dchub.cloud/facilities/meta-meta-el-paso-texas-0b4fe846#place"
  },
  "distribution": [
    {
      "@type": "DataDownload",
      "encodingFormat": "application/json",
      "contentUrl": "https://dchub.cloud/mcp"
    }
  ],
  "potentialAction": {
    "@type": "SearchAction",
    "target": {
      "@type": "EntryPoint",
      "urlTemplate": "https://dchub.cloud/api/v1/rag/search?q={search_term_string}"
    },
    "query-input": "required name=search_term_string"
  }
}
{"@context": "https://schema.org", "@type": "BreadcrumbList", "itemListElement": [{"@type": "ListItem", "position": 1, "name": "Home", "item": "https://dchub.cloud/"}, {"@type": "ListItem", "position": 2, "name": "Facilities", "item": "https://dchub.cloud/facilities"}, {"@type": "ListItem", "position": 3, "name": "United States", "item": "https://dchub.cloud/facilities/in/us"}, {"@type": "ListItem", "position": 4, "name": "El Paso", "item": "https://dchub.cloud/dcpi/el-paso"}, {"@type": "ListItem", "position": 5, "name": "Meta El Paso, Texas", "item": "https://dchub.cloud/facilities/meta-meta-el-paso-texas-0b4fe846"}]}
{"@context": "https://schema.org", "@type": "FAQPage", "mainEntity": [{"@type": "Question", "name": "What is the capacity of Meta El Paso, Texas?", "acceptedAnswer": {"@type": "Answer", "text": "DC Hub lists Meta El Paso, Texas at 1–5 GW."}}, {"@type": "Question", "name": "Who operates Meta El Paso, Texas?", "acceptedAnswer": {"@type": "Answer", "text": "Meta El Paso, Texas is operated by Meta."}}, {"@type": "Question", "name": "What is the status of Meta El Paso, Texas?", "acceptedAnswer": {"@type": "Answer", "text": "DC Hub lists Meta El Paso, Texas as Planned."}}]}
```

Live, dated answers for this facility: connect an assistant to https://dchub.cloud/mcp and call execute_plan.
