Meta El Paso Building 2 is a data center operated by Meta in El Paso, TX, US. It carries a reported power capacity of 75.0 MW and is currently planned. It sits in the Midlothian data-center market on the ERCOT grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 30.0-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.