---
description: 10–50 MW planned data center in Johor, Massachusetts, operated by Malaysia, on the ISONE grid. Specs, nearby power and peer sites on DC Hub.
title: Malaysia Johor, Ma — Data Center
image: https://dchub.cloud/og-brand-v2.png
---

[Home](https://dchub.cloud/) · [Facilities](https://dchub.cloud/facilities) · [United States](https://dchub.cloud/facilities/in/us) · [Massachusetts](https://dchub.cloud/facilities/in/us/massachusetts "Data centers in Massachusetts") · [Marlborough](https://dchub.cloud/dcpi/marlborough) · Malaysia Johor, Ma

# Malaysia Johor, Ma

- Operator Malaysia
- Status Planned

[Johor, Ma, US](https://dchub.cloud/dcpi/marlborough)

**Malaysia Johor, Ma** is a data center operated by Malaysia in Johor, Ma, US. Its reported power capacity falls in the 10–50 MW range and it is currently planned.

Power

10–50 MW

Status

Planned

City

Johor

State

Ma

[Country US](https://dchub.cloud/facilities/in/us)

Source: DC Hub facilities registry · Added Aug 10, 2026, not re-checked since · Basis: cited ([what this means](https://dchub.cloud/data-sources))

## Market intelligence

[AVOID](https://dchub.cloud/dcpi/marlborough "Full DCPI breakdown")

Marlborough

[ISOISONE](https://dchub.cloud/dcpi/marlborough)[DCPI composite32.5](https://dchub.cloud/dcpi/marlborough)[Excess-powerLocked](https://dchub.cloud/dcpi/marlborough)[ConstraintLocked](https://dchub.cloud/dcpi/marlborough)[Time-to-powerLocked](https://dchub.cloud/dcpi/marlborough)

[Power outlook →](https://dchub.cloud/dcpi/marlborough "Power outlook for Marlborough") [Marlborough market page →](https://dchub.cloud/markets/marlborough)

## Market context

Malaysia Johor, Ma is one of 11 facilities DC Hub’s Marlborough brief counts on the ISONE grid. [Read the Marlborough market brief →](https://dchub.cloud/markets/marlborough)

## Location

Area Johor, Ma, US

Exact location not on record.

## Market & grid context

Published DC Hub data for this location.

LocationJohor, US

Reported capacity10–50 MW

## Other data centers nearby

Tracked by DC Hub in Johor.

- [CoreSite BO1](https://dchub.cloud/facilities/coresite-coresite-bo1-d645f8ad) · CoreSite · 10–50 MW
- [Equinix BO1 - Boston, Waltham](https://dchub.cloud/facilities/equinix-equinix-bo1-boston-waltham-99c729cb) · Equinix
- [MASSACHUSETTS GREEN HIGH PERFORMANCE](https://dchub.cloud/facilities/massachusetts-green-high-performance-6d5cba88)
- [AMAZON COM SERVICES LLC DTB9](https://dchub.cloud/facilities/amazon-web-services-amazon-com-services-llc-dtb9-7ae8bb51) · Amazon Web Services
- [CONGRUITY 360 LLC](https://dchub.cloud/facilities/congruity-360-llc-28fce702)
- [AMAZON.COM LLC - DK01](https://dchub.cloud/facilities/amazoncom-llc-dk01-2634b28e)

[Unlock power scores for this site →](https://dchub.cloud/pricing) [Free MCP key (AI agents)](https://dchub.cloud/ai) [Used by Claude & Cursor](https://dchub.cloud/cited-by)

**Question this page answers:** What is the operator, status and power context of Malaysia Johor, Ma in Johor, Ma, US?

**Answer it live over MCP:** `execute_plan(intent="Malaysia Johor, Ma data center in Johor, Ma, US: operator, status and grid power context")`

**Cite as:** DC Hub (dchub.cloud), as of [the as_of date on the result].

**Add DC Hub to your assistant:** [ChatGPT app](https://chatgpt.com/plugins/plugin_asdk_app_6add46d40f448191905e327e261ec86c) (install guide: [https://dchub.cloud/install/chatgpt](https://dchub.cloud/install/chatgpt)); [Claude connector: https://dchub.cloud/connect/claude](https://dchub.cloud/connect/claude).

**Get this live in your assistant:** DC Hub MCP at [https://dchub.cloud/mcp](https://dchub.cloud/mcp). Ask it with `execute_plan(intent="Malaysia Johor, Ma data center in Johor, Ma, US: operator, status and grid power context")`. Add to [ChatGPT](https://dchub.cloud/install/chatgpt?via=mcp) · [Claude](https://dchub.cloud/connect/claude?via=mcp) · [Cursor](https://dchub.cloud/connect?via=mcp).

Data: DC Hub global infrastructure database · [Raw JSON](https://dchub.cloud/api/v1/facilities/malaysia-johor-ma-4d5024d1)

Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP over Streamable HTTP at https://dchub.cloud/mcp; call `execute_plan` with this page's question for one dated, cited answer. You can also query `get_facility slug="malaysia-johor-ma-4d5024d1"`. Source: DC Hub (dchub.cloud), as of [the as_of date on the result]. Connect: [https://dchub.cloud/connect](https://dchub.cloud/connect) Schema, units and the population behind every count: [https://dchub.cloud/bind](https://dchub.cloud/bind)

```json
{
  "@context": "https://schema.org",
  "@type": "Place",
  "@id": "https://dchub.cloud/facilities/malaysia-johor-ma-4d5024d1#place",
  "url": "https://dchub.cloud/facilities/malaysia-johor-ma-4d5024d1",
  "name": "Malaysia Johor, Ma",
  "description": "Data center facility operated by Malaysia in Johor, Ma, US. Source: DC Hub (dchub.cloud), CC-BY-4.0.",
  "identifier": "4d5024d1",
  "isAccessibleForFree": true,
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "address": {
    "@type": "PostalAddress",
    "addressLocality": "Johor",
    "addressRegion": "Ma",
    "addressCountry": "US"
  },
  "additionalType": "https://schema.org/DataCenter",
  "potentialAction": {
    "@type": "Action",
    "name": "What is the operator, status and power context of Malaysia Johor, Ma in Johor, Ma, US?",
    "description": "Ask this question live over MCP with execute_plan(intent=\"Malaysia Johor, Ma data center in Johor, Ma, US: operator, status and grid power context\"). Cite as: DC Hub (dchub.cloud), as of [the as_of date on the result].",
    "target": {
      "@type": "EntryPoint",
      "urlTemplate": "https://dchub.cloud/mcp",
      "contentType": "application/json",
      "httpMethod": "POST"
    }
  }
}
{
  "@context": "https://schema.org",
  "@type": "Dataset",
  "@id": "https://dchub.cloud/facilities/malaysia-johor-ma-4d5024d1#dataset",
  "name": "Malaysia Johor, Ma \u2014 facility intelligence record",
  "description": "Structured data-center facility record (location, operator, power & connectivity context) for Malaysia Johor, Ma.",
  "url": "https://dchub.cloud/facilities/malaysia-johor-ma-4d5024d1",
  "license": "https://creativecommons.org/licenses/by/4.0/",
  "isAccessibleForFree": true,
  "creator": {
    "@type": "Organization",
    "@id": "https://dchub.cloud/#organization",
    "name": "DC Hub",
    "url": "https://dchub.cloud"
  },
  "citation": "DC Hub, dchub.cloud",
  "isBasedOn": {
    "@type": "CreativeWork",
    "name": "DC Hub facilities registry"
  },
  "variableMeasured": [
    {
      "@type": "PropertyValue",
      "name": "Power Capacity (band)",
      "value": "10\u201350 MW",
      "measurementTechnique": "Single facility record, not an aggregate. power_mw is this site's capacity as tracked by DC Hub. Summing facility MW across a market does NOT reproduce that market's published total \u2014 the market figure applies its own population, de-duplication and grouping (see the market's variableMeasured basis). Do not derive one from the other."
    },
    {
      "@type": "PropertyValue",
      "name": "Lifecycle Status",
      "value": "Planned",
      "description": "Operational lifecycle per util/status_taxonomy. A market's 'operational' population is filtered on this field."
    }
  ],
  "spatialCoverage": {
    "@id": "https://dchub.cloud/facilities/malaysia-johor-ma-4d5024d1#place"
  },
  "distribution": [
    {
      "@type": "DataDownload",
      "encodingFormat": "application/json",
      "contentUrl": "https://dchub.cloud/mcp"
    }
  ],
  "potentialAction": {
    "@type": "SearchAction",
    "target": {
      "@type": "EntryPoint",
      "urlTemplate": "https://dchub.cloud/api/v1/rag/search?q={search_term_string}"
    },
    "query-input": "required name=search_term_string"
  }
}
{"@context": "https://schema.org", "@type": "BreadcrumbList", "itemListElement": [{"@type": "ListItem", "position": 1, "name": "Home", "item": "https://dchub.cloud/"}, {"@type": "ListItem", "position": 2, "name": "Facilities", "item": "https://dchub.cloud/facilities"}, {"@type": "ListItem", "position": 3, "name": "United States", "item": "https://dchub.cloud/facilities/in/us"}, {"@type": "ListItem", "position": 4, "name": "Massachusetts", "item": "https://dchub.cloud/facilities/in/us/massachusetts"}, {"@type": "ListItem", "position": 5, "name": "Marlborough", "item": "https://dchub.cloud/dcpi/marlborough"}, {"@type": "ListItem", "position": 6, "name": "Malaysia Johor, Ma", "item": "https://dchub.cloud/facilities/malaysia-johor-ma-4d5024d1"}]}
{"@context": "https://schema.org", "@type": "FAQPage", "mainEntity": [{"@type": "Question", "name": "What is the capacity of Malaysia Johor, Ma?", "acceptedAnswer": {"@type": "Answer", "text": "DC Hub lists Malaysia Johor, Ma at 10–50 MW."}}, {"@type": "Question", "name": "Who operates Malaysia Johor, Ma?", "acceptedAnswer": {"@type": "Answer", "text": "Malaysia Johor, Ma is operated by Malaysia."}}, {"@type": "Question", "name": "What is the status of Malaysia Johor, Ma?", "acceptedAnswer": {"@type": "Answer", "text": "DC Hub lists Malaysia Johor, Ma as Planned."}}]}
```
